LINAC OPS Budget Review

Slides:



Advertisements
Similar presentations
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
Process: A Generic View n A software process  is a roadmap to building high quality software products.  provides a framework for managing activities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
CD FY10 Budget and Tactical Plan Review FY10 Tactical Plans for Financial Management Valena Sibley October 8, 2009 Tactical plan nameDocDB# FY10 Tactical.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Process: A Generic View
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Technology Department WP2 Progress Report Th. Otto
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
O. Kester, NuSTAR annual meeting, 27/02/2013
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
Jeff Kern NRAO/ALMA.  Scaling and Complexity ◦ SKA is not just a bigger version of existing systems  Higher Expectations  End to End Systems  Archive.
Accelerator Readiness Review October 31, 2006
SCT Project Management Issues
Project Management W. J. Foyt
Accelerator Operations Department Readiness (Part 2)
SCHOOL and DISTRICT ACCREDITATION
LUSI Coordination with LCLS
Experimental Facilities Planning
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
Chapter 1 (pages 4-9); Overview of SDLC
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
WBS 5.0 LCLS Strategic Projects Division
Presentation to Project Certification Committee, DoIT August 24, 2008
Electron Beam Systems ETC and Methodology
LCLS Project Management
Ian Evans SSRL Safety Office
DOE Review of the LCLS Project
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Project Management Issues John N. Galayda, SLAC April 24, 2002
Introduction FY09 Linac Ops Review
DOE Review of the LCLS Project
LCLS Undulator System Status and Schedule
Integrated Safety and Environmental Management
Drive Laser Status and Hand-Off to Operations
John Arthur – LCLS Experimental Operations
Electron Beam Systems Wrap-up
Drive Laser Status and Hand-Off to Operations
The Transition to User Operations
Engineering and Physics Department support for LUSI
Linac Coherent Light Source (LCLS)
LCLS Undulator System Status and Schedule
LCLS Injector System Overview D. H
Linac Coherent Light Source Transition to Operations 11 July 2007
DOE Review of the LCLS Project October 2006
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
CF Scope, Management & Organization
LINAC System Engineering / Design Status C.E. Rago
SNS-PPU upgrades the existing accelerator structure
LCLS Instrument MIE Project: Staffing, Schedule
LCLS-II Operations in LERF
LUSI Controls and Data Systems W.B.S. 1.6
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

LINAC OPS Budget Review WBS 3 Engineering & Physics Operations David Schultz February 18-20, 2009

The Engineering & Physics Division (EPD) Outline Engineering & Physics Division Mission & Function Organization structure WBS breakdown - FY09 Projected budget for FY10-FY12 FY09 Linac Ops Review Page 2

The Engineering & Physics Division FY09 Linac Ops Review Page 3

Engineering & Physics Division The role of EPD. Provide centralized Engineering and Physics expertise matrixed to LCLS Directorate activities. Establish and maintain standards for those services. Maintain and Control the LCLS Configuration Track LCLS availability and assess risk Monitor and track work on LCLS from departments outside LCLS (WBS 8 & 9) FY09 Linac Ops Review Page 4

Engineering & Physics Division Physics Department 26 people in the department, in 4 groups Accelerator Physics FEL and Undulators Laser Systems Diagnostics Currently supporting, in a matrixed manner LCLS Commissioning Development of diagnostics for LCLS Operations Photon systems and LUSI Laser system development Future LCLS configurations EPD provides Unified framework for Standards and Coordination Staff administration and Professional development FY09 Linac Ops Review Page 5

Engineering & Physics Division Engineering Department 26 people in the department supporting, (matrixed) LCLS Commissioning LCLS Construction Project LUSI MIE LCLS Operations and Improvements Civil engineering and Building management Design supervision EPD provides Unified framework for Standards and Coordination Staff administration and Professional development FY09 Linac Ops Review Page 6

Engineering & Physics Division Standards and Coordination Apply to all LCLS work, extending beyond LCLS Dir. Engineering standards and QA Standards for Physics and Engineering practices Quality assurance for Division efforts LCLS Configuration Control Cataloging and Controlling the Physical Configuration of LCLS Document Control Integrating with other departments, and with SLAC Document Control FY09 Linac Ops Review Page 7

Engineering & Physics Division Standards and Coordination (cont) Integrated Risk Management for Accelerator Availability Involves LCLS ASD and XFD, and ETS groups Planning and Installation group Provides a framework for engineering management, installation and scheduling for Directorate projects. Monitoring and Tracking work matrixed into LCLS from other SLAC groups FY09 Linac Ops Review Page 8

Engineering & Physics Division (EPD) 61 Heads 21.4 FTEs FY09 Linac Ops Review Page 9

LCLS EPD Resource Deployment by WBS FY09 Linac Ops Review Page 10

EPD WBS Breakdown WBS 3.1 EPD management. Administration and Administrative support Planning and Installation group WBS 3.2 Physics Department Engineering Department Design supervision FY09 Linac Ops Review Page 11

Engineering & Physics Division WBS 3.3 Engineering Standards Quality Assurance LCLS Configuration Control LCLS Document Control Integrated Risk Management FY09 Linac Ops Review Page 12

Basis of FY’09 Budget Assumptions LCLS e-Beams Commissioning will transition in July LCLS Photon Systems requires support LUSI engineering will accelerate LCLS SPD future project development will require support Configuration Control and Document Control are an immediate LCLS need, and are issues extending beyond LCLS where we believe we can lead. Collaborative relationships with other groups are developing FY09 Linac Ops Review Page 13

Basis of FY’09 Budget Direct FTEs Physicists and Engineers matrixed to clients, are budgeted in EPD at 10% FTE Develop core competency Cover administration and training Additional manpower in FEL/Undulator, Diagnostics and Engineering Systems and Control FY09 Linac Ops Review Page 14

Basis of FY’09 Budget M&S Physics Software Support Diagnostic Development hardware Currently, X-band Transverse Cavity Engineering Workstations Document Control support Travel for EPD specific functions Vendor visits, meetings FY09 Linac Ops Review Page 15

WBS 3. EPD FY’09 Linac Ops Budget FY09 Linac Ops Review Page 16

FY10 – FY12 Forecast Model Assumptions Continuing support for LCLS Photon Systems LUSI engineering Future LCLS SPD project development The model is flat manpower and M&S XFD will increase staff in FY10 Increase in Engineering Increase in Laser group FY09 Linac Ops Review Page 17

FY10 – FY12 Forecast FY09 Linac Ops Review Page 18

FY10 – FY12 Forecast FY09 Linac Ops Review Page 19

Summary The EPD provides Engineering & Physics effort in support of LCLS activities. Effort is matrixed to those activities, standards and expertise is maintained by EPD. The EPD budget contains the fraction of that effort needed to support standards and expand expertise. EPD manages Document and LCLS Configuration control, in collaboration with other SLAC groups FY09 Linac Ops Review Page 20