Sunday/Monday & :30 Stable beams. Fill #1851.

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday September 14th
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Mike Lamont, Jorg Wenninger
LHC Status Sun Morning 20-Mai
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10/5 Cryo recovery until 18:30
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Summary week 18 Intensity ramp up & production
Tue/Wed 12/ :00 Probe beam back again
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
LHC Status Fro Morning 9-Sep
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday morning / afternoon
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Sunday/Monday 05.06. & 06.06. 06:30 Stable beams. Fill #1851. 06:56 Dump: Ufo MKI pt 2. Length stable beams: 0h26. 08:30 injection for physics 09:26 Stable beams. Fill #1852. Lumi ~1.1e33. 00:31 Beam dump: QPS trigger on RQTL11.R7B1. Length stable beams: 15h05. 07:30 Stable beams. Fill #1854. 07:39 PC failure of RQ6L2. Length stable beams: 00h09. 04/06/2011 LHC 9:00 meeting

Week Summary (R. Assmann & B. Holzer) Goal: 250 pb-1 Weeks results: Highest luminosity per fill: 46.5 pb-1 (new record) Production in week: 200 pb-1 (new record) Average bunch intensity: 1.2e11 (slightly lowered) Typical luminosity: 1.1e33 (slightly lowered) Number of bunches/beam: 1092 (from week 21) Number of stable beams: 14 Average length stable beams: 4.2 h (mostly short fills) Bunch length blow-up: 1.25 ns (plus 50 ps) Average turn around: 5.5 h (2.5 h best) 144b injection: fully commissioned & tested TOTEM/ALFA: RP settings qualified for physics Nice week but could have been even nicer… 04/06/2011 LHC 9:00 meeting

Luminosity Production 04/06/2011 LHC 9:00 meeting

Luminosity Production 04/06/2011 LHC 9:00 meeting

Performance (ATLAS figures) Maximum Luminosity Delivered in one fill 46.61 pb-1 Fill 1836 11/06/01, 18:49 Maximum Luminosity Delivered in one day 46.84 pb-1 Thursday 02 June, 2011 Maximum Luminosity Delivered in 7 days 201.05 pb-1 Monday 30 May, 2011 - Sunday 05 June, 2011 31/05/2011 LHC 8:30 meeting

Integrated Lumi (ATLAS) 31/05/2011 LHC 8:30 meeting

Turn-around Time: Dump SB  SB Number Length Total 1 03h03 3.05 2 05h26 5.43 3 04h48 4.80 4 08h05 8.08 5 07h24 7.40 6 04h59 4.98 7 05h28 5.47 8 07h10 7.17 9 06h15 6.25 10 02h30 2.50 Average 5.51 Average turn-around time: 5.5 h 04/06/2011 LHC 9:00 meeting

Beam Dumps at > 450 GeV – I Date Time State Reason 30/05 11h08 Stable beams QPS trigger circuit detector of RCBXH2.L1. SEU? 15h43 Adjust New RF interlock not masked 20h20 FMCM. Electrical glitch 31/05 06h22 UFO IR2L 10h38 Communication with DFBAJ. SEU? 22h20 Squeeze 01/06 02h10 QPS trigger (Quench of Q9R5 ?) 06h53 RF trip (radiation-induced arc detector signal?) 09h17 Ramp Collimator temperature 20h37 Collimation crate IR5R failure (PRS) 02/06 16h58 Beam dump EIC 21h50 UFO IR8 03/06 00h28 Trip of RQTF.A23B2 13h30 Loss of I_meas reading 18h24 UFO in IR8R 21h17 Trip undulator IR4. 04/06/2011 LHC 9:00 meeting

Beam Dumps at > 450 GeV – II Date Time State Reason 04/06 07:56 Stable beams QPS FIP communication lost, close to IR1. S12 tripped. 16:19 Power converter fault. 20:20 Flat top UFO IR2L 05/06 00:15 RF trip 03:48 Adjust LHCb magnet trip 06:56 06/06 00:31 QPS trigger on RQTL11.R7B1. 07:39 PC failure of RQ6L2. Increase of BLM dump threshold for Q4 (MQY) at MKI’s by factor 2 24 beam dumps at > 450 GeV, only one dumped by OP. 04/06/2011 LHC 9:00 meeting

Length Stable Beams: 14 this week so far Fill Length Total 1816 09h00 1822 00h27 1823 01h13 1835 01h06 1836 14h55 1839 00h04 1841 07h35 1844 00h23 1845 05h40 40h23 1846 02h55 1848 00h46 1851 00h26 44h30 1852 15h05 1854 00h09 59h44 Average length stable beams: 4.2 h 04/06/2011 LHC 9:00 meeting

Tuesday to Wednesday Injection preparation for 144b Collimator temperature QPS noise  quench Cryo S56 Cryo S34 UFO IR2 RF arc 01/06/2011 LMC - R. Assmann

Wed Night / Thu Morning 2. June 00:31h BEAM MODE > Injection Probe Beam 02:03h BEAM MODE changed to STABLE BEAMS, Luminosity 15 hours run

System Mike L. 4/6/2011 Dumps since TS

Cause Mike L. 4/6/2011 Dumps since TS

Ongoing injection problems Consistent problems after long fills: First filling attempts after long fills hit by strong emittance blow-up: ~100%. Blow-up happens mostly a few seconds after injection. Seen as beam instability. Not all batches affected. Some good, some bad. Seeing drifts in chromaticity at flat bottom after long fills. Not understood. Possible actions: Update Fidel model to take into account better long powering history. Full pre-cycle after long fill. Check for the hump. Is it back? Tails beneficial for Landau damping  less scraping in SPS? Last fill with larger emittances (less scraping) went without problem, but also benfited from earlier short fills. 04/06/2011 LHC 9:00 meeting

Vertical Blow-up B2 04/06/2011 LHC 9:00 meeting

Emittance Blowup B1/B2 V To be understood… Real 100% emittance growth or instrumental effect? 31/05/2011 LHC 8:30 meeting

Sat morning 4. June 11:26h Injection for physics ... as decided: single bunch intensity limited to ≈ 1.2*1011 Emittances ok beam 2 v beam 2 h beam 1 h beam 1 v

Sat Morning 4. June 13:24h Ramp, Squeeze, Lumi beam quality: One b2 108b injection suffered more than the rest. That 7th injection had bunches blown up in V intensities emittance !! here !!

UFO’s 2.6. 5 MKI R8 1 MKI L2 04/06/2011 LHC 9:00 meeting

UFO’s 3.6. 3 MKI L2 4 MKI R8 04/06/2011 LHC 9:00 meeting

Tue Late 22:20 h Ramp, squeeze, Ufo close to the MKI (the same as this morning) 21:51h and once again ... much better now injections were very clean from losses point of view.no sign of emittance growth,

Injection Kicker Temperatures 04/06/2011 LHC 9:00 meeting

Collimator Heating by EM fields Bunch Length 25 deg. 0.5 ns Collimator temperature 01/06/2011 LMC - R. Assmann

Parasitic MD: Integer Resonance QV QH Beam Intensity  Integer resonance is very narrow! 31/05/2011 LHC 8:30 meeting

Parasitic MD: Integer Resonance 31/05/2011 LHC 8:30 meeting

Ahead Physics fills continued (1092 x 1092 bunches, 108b injections). Average bunch intensity: ~ 1.2e11 p End of fills (if any): Try to reduce DS losses with TCL collimators (open now) RF cavity switch off test There is a chance to reach 1 fb-1 end of this week or beginning next week… This week coordination: Mike Lamont and Jan Uythoven 04/06/2011 LHC 9:00 meeting