Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.

Slides:



Advertisements
Similar presentations
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Floating MD week 28 summary
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Coordination: G. Arduini, E.B. Holzer
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Coordination: Gianluigi Arduini & Jan Uythoven
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Mike Lamont, Jorg Wenninger
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Summary week 18 Intensity ramp up & production
IP8 aperture measurements (07:30-10:30)
Thursday – Morning Energy matching at injection with H CODs
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Thursday 30th September De-bunching test
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 27th August & night
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production

Week 19 Mix of performance and machine availability issues 1380 1092 Cryo. Pt. 8 480 Mix of performance and machine availability issues

Summary Week 19 - G. Arduini Last 24 hours 04:25 Stable beam #2623 1.23e11 ppb, 4.13e33 cm-2s-1. 08:15 cold compressor off in point 2...(Cooling problem) 09:50 Beam dumped by operations - cryogenics recovery 15:00 Cryo back, pre-cycle etc. 18:54 Stable beams #2624. 1.28e11 ppb, 4.34e33 cm-2s-1 00:03 UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS #2627. 1.27e11 ppb, 4.11e33 cm-2s-1 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini Fills of the week Fill Day Nb L (h) Int L (pb-1) Dump 2593 Mon 1092 4.6 41.1 Electrical network, FMCM 2596 10.6 91.8 OP 2605 Th 480 1.3 5.5 End of fill test 2608 1380 0.5 6.8 UFO 2609 4.5 44.5 ADT vac. Gauge trip 2616 Fr 1.9 26.0 Vacuum crate PS failure 2617 0.4 5.9 Q7.R1 trip (SEU?) 2621 Sat 13.3 120.5 2623 Sun 5.4 62.3 Cryo pt. 2 2624 5.2 63.3 2627 ~55 52.2 523 Stable beams ~ 52.5 hours in total (31.1 %) 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini Integrals 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini Main faults Cryo Pt8 Hours Faults Mon 7.5 3 Injectors, RF control, BPM LSS6 Tue 8.5 8 Injectors, RQTL11.L5B1 (PC), Cryo Point 8 Wed 9.5 24 Cryo point 8/Electrical problem in P1 (18kV/400 V transformer)/ALICE dipole/RF controls Thu 10.5 4.5 RF controls, BLMs controls, Injection Fri 11.5 15 RF controls, injection, Vacuum crate failure , QPS connector Sat 12.5 7.5 Recovery from Fast abort sector 12 (dump resistor cooling), access for RCBCV9.L5B1 repair, injection losses due to different cycle in the SPS Sun 13.5 5.5 Cryo compressor point 2 – Cooling water problem ~ 67.5 hours in total (40 %) 14/05/2012 Summary Week 19 - G. Arduini

Losses at the end of the ramp and squeeze (B2) Deterioration started already before technical stop and continued after technical stop. Effects visible already during the ramp Fill 2536 – Before technical stop Fill 2538 – Before technical stop (dump during ramp - HV) Fill 2589 – After technical stop 14/05/2012 Summary Week 19 - G. Arduini

Orbit and losses in the squeeze B2: Losses and H TCP orbit well correlated. Less evident for V-plane J. Wenninger

Orbit FF – squeeze – beam 2 R. Steinhagen, J. Wenninger 60% correction applied Sigma H at TCP ~300 microns TCP ~5.1 sigma 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini High gain OFB test Blue : before high BW, Magenta: OFB BW x10, Black: after 100% FF B1H B2H J. Wenninger B1V B2V 14/05/2012 Summary Week 19 - G. Arduini

Losses in squeeze at TCP Improved but still spikey 14/05/2012 Summary Week 19 - G. Arduini

Losses during ramp and squeeze Increased losses on Beam 2 observed already before TS Worse after technical stop: Related to larger tails and larger emittance at higher energy Mostly appearing between 2.5 and 2 m Correlated with (small) orbit distortions at TCPs and (small) relative offsets beam/collimator centre adding up for B2 in particular Losses enhanced by reduced gain of the transverse feedback on 12 bunches Actions: Verifications in the injector chain Transverse damper modulation off Collimator set-up at top energy checked BLM thresholds increase + review of the thresholds (rMPP/LMC) OFB higher bandwidth in squeeze and feed-forwarded Investigations on the optics and collective effects expected during the squeeze from 2.5 to 2 m  LMC Scraping of tails at low energy  to be done 14/05/2012 Summary Week 19 - G. Arduini

Instability – B1 H Occurring when CMS in collision and ATLAS not yet fully head-on. Lifetime good up to that point.

Instability Instability at the end of the collision process (separation bumps collapsed). Residual separation of ~2.1 s in IP1 and ~1.2 s in IP5 and 3.2 s in IP8 (estimated from luminosities at the moment of the dump). The separation in IP1 and 5 is likely the effect of the orbit correction during the squeeze. B1H osc. Ampl. LCMS LATLAS LLHCb

Instability Damper pick-up signals Thanks to W. Höfle!! 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini Actions Went back to low number of bunches but with 50 ns spacing to get as much as possible same orbit Luminosity scan to determine collision offsets and correct them  incorporated for next fill Analysis of data ongoing IP1 - H IP5 - V IP5 - H 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini Instability ~1.5 sigma ~1.7 sigma 5 microns 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini Status Losses: Still losses during the ramp (not negligible) Reduced during the squeeze (particularly between 2.5 and 2 m and more recently at ~1.5 m) although spikey. Warning levels reached: at the end of the ramp (TCSG/TCLA in point 7: 80 s running sum to 50 % of threshold) During the squeeze between b*= 2.5 and 2 m and at 1.6 m (TCSG/TCLA in point 7: 1.3 s running sum to 56% of threshold) Instability: can be controlled by the transverse feedback provided small offsets (< 1 s) at the end of the collision process. 14/05/2012 Summary Week 19 - G. Arduini

Performance Loss of brightness ~20% during technical stop  checking LHC and injectors. Eemittance comparison through the chain to understand the origin. Concentrating particularly between PS and SPS. Need chirp to measure the tune during the ramp

Fill 2536 – Before technical stop Performance Fill 2536 – Before technical stop Fill 2624 – Now c/o ATLAS 14/05/2012 Summary Week 19 - G. Arduini

Summary Week 19 - G. Arduini Pending Beam quality from the injectors Injection delicate: heavily relies on quality of the beam form SPS. Collimator aperture opened form 4.5 to 5 s in both injection lines. Orbit in collision needs to be corrected and trims incorporated (in particular point 5) TDI jaw deformation  check to be done after long high intensity fill 14/05/2012 Summary Week 19 - G. Arduini