2011-10-05 LHC 8:30 meetingEBH 11 Wednesday 4 October 2011.

Slides:



Advertisements
Similar presentations
Thursday 12 th April - morning Machine in access for a problem on the injection kickers… MKI2 problem – fuse - PFNs were properly charged but pulses were.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
Fri – Sat - Sunday 30 Sept - 2 nd October Friday  06:00 Operator dump fill #2171, integrated lumi 75 pb-1.  90 m  * optics Optics ok, collisions at.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
07:27 Beams dumped in ramp  Energy error… SIS  The telegram information on the energy was missing for a few seconds, effectively freezing the energy.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Wednesday 5th September - morning
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Saturday 2/4/ :00-09:00 Problems with SPS:
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Yesterday’s morning’s controls issues
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
Tue/Wed 12/ :00 Probe beam back again
Thursday – Morning Energy matching at injection with H CODs
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Tuesday 20 September 2011.
Thursday 30th September De-bunching test
Another Immortal Fill….
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Monday 152 bunch operation summary
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

LHC 8:30 meetingEBH 11 Wednesday 4 October 2011

LHC 8:30 meetingEBH 2 12:12 dumped Fill # 2181 after 12:15 hours in stable beams Initial luminosity: 3.2e33 cm -2 s -1 Delivered luminosity: 92 pb -1 Operator Dump procedure started – but in the end the beam was dumped by RF interlock because RF was switched off When beam mode is changed to beam dump, the LHC page 1 displays the image of the last beam dump need to check the time stamp 12:44 Remote reset of an error on the QPS crate in S45 (B8L5) Plan was: 1 hour: RF test of new tuner firmware version for the 25ns MD 6 hours: abort gap cleaning commissioning (using the new RF firmware in order to test it at lower intensity beam) Physics Tuesday - Day

LHC 8:30 meetingEBH 3 Problem with the new RF firmware and problem rolling back to the old version 14:54 – 17:12: BLM power supply in IP7 Abort gap cleaning cancelled and moved to Friday 14:00 – 20:00 17:52 RF firmware rolled back – ready to inject for physics 20:36 Stable beams for Fill #2182 Bunch intensity: 1.3E11 Peak luminosity: ~3.2e33 cm-2 s-1 Total luminosity delivered: ~71 pb -1 05:31 Dump: quench heaters discharged in MB10.L8 19:55 vertical OFB stopped at around 1.5TeV (BPM 31.L5 went bad) and was restarted after disabling this BPM New RF firmware corrected, some tests done, but not tested with beam.

LHC 8:30 meetingEBH 4 Abort Gap population up to 1.38E10 for B1 (red curve) Correlated with losses in IP3 momentum cleaning B1 (green curve) Fill #2180 and #2181

LHC 8:30 meetingEBH 5 TI operators need more information to find equipment owner quicker CCC TI minor event report: Piquet EL sur place, c'est un RACK qui fait déclencher se départ. Sur le rack le seul information écrit est: LHC TIMING Demande au LHC qui nous dit de contacter des personnes pour le timing. Apres multiples coups de fils on trouve que ce rack est en effet un rack de Beam Instrumentation. La personne en charge se rend sur place et trouve une alimentation défectueuse. Apres échange de l'alimentation tout est de nouveau OK. Suggestion: Afin d'améliorer cette situation (et ne pas perdre plus de 2 heures a chercher qui appeler) il faudrait indiquer sur le RACK qui ou quel groupe en est responsable.. BLM Power Supply in IP7

LHC 8:30 meetingEBH 6 Some vacuum spikes left and right if IP2 – calming down afterwards Fill #2182

LHC 8:30 meetingEBH 7 B1 lifetime dip started ~2min. before we optimised IP5, and at the time we started leveling ALICE to 0.7 (ub s)^-1. Bunch length increased for B1. CMS showed an increase of the difference between the arrival time of both beams at the IP of 0.15 ns which could be explained by the increase in bunch lenght of B1. No emittance growth in the transverse plane. BLM TCT left of IP5 reached 60% of dump level Losses on B1 – lifetime down to 5 hours

LHC 8:30 meetingEBH 8 Philippe Baudrenghien: " At the start of Fill 2182, Beam 1 experienced abrupt losses, with signs of debunching (abort gap population and bunch lengthening). It was traced to noise in Cav1B1. Attached a figure showing noise in 1B1, Fast BCT loss, abort gap population jumping to 6E10 and bunch lengthening. The klystron polar loop in 1B1 tried to compensate a ~ 6 dB loss in the RF chain and would saturate causing significant noise. We switched the loop off for the rest of the fill and configured it off for next fills. Obviously the open-loop gain has dropped (visible from the degraded control of cavity field). The open-loop phase has drifted also. We need to run our optimization tools without beam to localize and cure the problem. N.B: The VME modulator card was replaced on Sept 19th on 1B1.

LHC 8:30 meetingEBH 9 Losses on the batch of 12 bunches after Qh trim of reducing by

LHC 8:30 meetingEBH 10 Bunch Length and abort gap filling 7E10 protons in abort gap No Losses associated with second bunch lengthening

LHC 8:30 meetingEBH 11

LHC 8:30 meetingEBH 12

LHC 8:30 meetingEBH 13 Wed (day): Large pile-up MD (9h) Wed (pm/night):Physics Thu (day):25 ns MD (12h) Thu (night):Physics Friday (day):Abort gap cleaning (6h) Fr(night), Sa, Su: Physics To be done: 1.ALICE test: solenoid to 0.2T (40% of nominal) at the end of a fill; stable beams for ½ - 1 hour 2.Loss map qualification for injection & physics Present tentative planning week 40

LHC 8:30 meetingEBH 14

LHC 8:30 meetingEBH 15