TGaf Geneva Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /1291r0 Submission November 2009 Matthew Gast, Trapeze NetworksSlide 1 November 2009 TGmb Closing Report Date: Authors:
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
September 2008 doc.: IEEE /1003r0 July 2011
TGv Closing Report March 2008
TGaf Dallas Closing Report
Month Year IEEE Motions in July, 2017 Plenary
IEEE TGz Vancouver Agenda
TGaf San Francisco Closing Report
IEEE TGai Closing Report
IEEE TGai Closing Report
TGaf Waikoloa Closing Report
TGae Closing Report – January 2010
TGae Closing Report – March 2010
IEEE TGai Closing Report
802.11af Liaison Report Date: Authors: January 2012
802.11af Liaison Report Date: Authors: March 2012
TGae Closing Report – May 2010
IEEE TGaf Beijing Closing Report
IEEE TGaf Waikoloa Closing Report
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
IEEE TGaf Orlando Closing Report
IEEE TGaf Dallas Closing Report
TGaf San Antonio Closing Report
IEEE TGaf DRAFT Meeting Plan and Agenda
IEEE TGaf Singapore Closing Report
January 2011 Closing Plenary Motions
Tgae Closing Report – November 2009
TGaf Waikoloa Closing Report
Mar 2010 Closing Plenary Motions
QoSMAN SG Closing Report – Nov 2009
IEEE TGaf DRAFT Meeting Plan and Agenda
September 2009 TGmb Closing Report
IEEE TGaf Palm Springs Closing Report
September 2009 Closing Report
TGae Closing Report – July 2010
Nov 2011 Closing Plenary Motions
November 2010 Closing Report
TGm Closing Report – May 2010
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
Closing Report Date: Authors: July 2009 July 2009
TGae Closing Report – July 2011
TGae Closing Report – January 2011
TGaf San Antonio Closing Report
September 2008 doc.: IEEE /1003r0 July 2011
TGr Closing Report for March 2008
802.11af Liaison Report Date: Authors: January 2013
IEEE TGai Closing Report
May 2010 Closing Plenary Motions
TGae Closing Report – November 2011
TGs San Diego Closing Report
IEEE aj May Closing Report
July 2009 Closing Report Date: Authors: July 2009
IEEE mc Closing Report for May 2016
TGaf Waikoloa Closing Report
IEEE TGaf Beijing Closing Report
TGae Closing Report – September 2010
Presentation transcript:

TGaf Geneva Closing Report April 2009 doc.: IEEE 802.19-09/xxxxr0 July 2013 TGaf Geneva Closing Report Date: 2013-07-19 Authors: Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

April 2009 doc.: IEEE 802.19-09/xxxxr0 July 2013 Abstract This presentation is the closing report for the 22nd face-to-face meeting of IEEE 802.11 TGaf, taking place the week of July 15th, 2013 at the IEEE 802 Plenary in Geneva. Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

Plan for the Week Approve meeting and teleconference minutes July 2013 Plan for the Week Approve meeting and teleconference minutes Regulatory update Review the results of LB196 Review of the progress since May Editorial review; spreadsheet 11-12/1017r48 Review and Approve all comment resolution submissions Request a recirculation of draft 5.0 (unchanged) and request conditional approval to go to Sponsor Ballot Submit the PAR extension request Plan for September meeting and teleconferences Rich Kennedy, BlackBerry

TGaf Accomplishments Approved meeting and teleconference minutes July 2013 TGaf Accomplishments Approved meeting and teleconference minutes Completed comment resolutions for letter ballot 196 No change required to the draft Approved recirculation of D5.0 Approved Report to EC on Conditional Approval to go to Sponsor Ballot Planned for September meeting, and weekly teleconferences Tuesdays at 21:00 ET for 2 hours Rich Kennedy, BlackBerry

Plan for September Approve Geneva and Teleconference minutes July 2013 Plan for September Approve Geneva and Teleconference minutes Review results of Letter Ballot 197 on Draft 5.0 Review results of the first Sponsor Ballot Plan for November, additional ballots and Teleconferences Rich Kennedy, BlackBerry

TGaf Timeline – Updated May 2013 January 2010 doc.: IEEE 802.11-yy/xxxxr0 July 2013 TGaf Timeline – Updated May 2013 Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: July 2012 Recirculation Letter Ballot: January 2013 Form Sponsor Ballot Pool: June 2013 Initial Sponsor Ballot: September 2013 Recirculate Sponsor Ballot: November 2013 Final WG/EC Approval: March 2014 RevCom/Standards Board Approval: June 2014 Rich Kennedy, BlackBerry Michael Montemurro, RIM

Teleconferences Weekly on Tuesdays through September 24th July 2013 Teleconferences Weekly on Tuesdays through September 24th Until recirc is complete, calls will be used for regulatory updates as required Time: 21:00 ET for up to 2 hours Rich Kennedy, BlackBerry

WG Motion #1 Moved: Rich Kennedy on behalf of TGaf July 2013 WG Motion #1 Having approved comment resolutions for all of the comments received from LB196 on TGaf D5.0, as contained in document 11-12/1017r50 Approve a 15 day Working Group Recirculation Ballot, asking the question “Should P802.11af D5.0 be forwarded to Sponsor Ballot?” Moved: Rich Kennedy on behalf of TGaf Seconded: non required Discussion? none Result: 117 Y 0 N 2 A The motion passes In the TG: Moved by: Al Petrick; Seconded by Peter Ecclesine Result: 5-0-0 Rich Kennedy, BlackBerry

WG Motion #2 Moved by Rich Kennedy on behalf of TGaf Discussion? none July 2013 WG Motion #2 Approve document 11-13/726r0 as the report to the IEEE 802 Executive Committee on the requirements for conditional approval to forward P802.11af to Sponsor Ballot, and Request the IEEE 802 Executive Committee to conditionally approve forwarding P802.11af to sponsor ballot.   Moved by Rich Kennedy on behalf of TGaf Discussion? none Vote: 107 Y 0 N 1 A The motion passes In the TG: Moved: Al Petrick, Seconded: Zhou Lan Result: 5-0-0 Rich Kennedy, BlackBerry