DRAFT DG TREN Staff Working Paper on LNG

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Commission’s draft staff working document on Art. 22 ERGEG’s view ERGEG’s Gas Focus Group (GFG) XV Madrid Forum, 6/7 November 2008.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Accessing European LNG terminals.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Directorate General for Energy and Transport Nina Grall Directorate General – Energy and Transport European Forum Gas 2007 – Paris Towards one.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
CESEC Energy Community Project Monitoring
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Views on the EC Draft LNG Paper
The 3rd package for the internal energy market
New transparency guidelines
FlorenceForum November 2008
GRI-S : Infrastructures The Union list of projects of common interest
GIE Annual Conference Recent developments in Transparency in the EU
Gas Transmission Europe
Background and Process
ERGEG GRI South South East – , Maribor
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Ashgabat International Energy Charter Forum
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
EWRC-RAE MUTUAL PROJECTS
CESEC Energy Community Project Monitoring
Introductory Speech FRANCISCO DE LA FLOR - GLE PRESIDENT 26/04/2007
Gas Quality & TSO – LSO Coordination
Capacity Allocation Mechanisms
Regulators’ views on Transparency
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Transparency & Services
EWRC-RAE MUTUAL PROJECTS
XIIIth Madrid Forum (16th/17th October 2007)
EWRC-RAE MUTUAL PROJECTS
LNG Workshop Bilbao, March 13th 2009 GLE.
ERGEG comment to KEMA study on Art. 3 and 7
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Presentation transcript:

DRAFT DG TREN Staff Working Paper on LNG Madrid Forum XV Follow-up: LNG workshop: Introduction by European Commission DRAFT DG TREN Staff Working Paper on LNG Heinrich Hick DG TREN C 2 12-13 March 2009, Bilbao Heinrich Hick DG TREN C 2 XV Madrid Forum 6 November 2008 EUROPEAN COMMISSION EUROPEAN COMMISSION

Current EC policy context for LNG LNG featuring in both internal & external energy policy dimensions: Political: - European Council of 19/20 March 09: Follow-up 2nd SER: SoS, crisis mechanisms, infrastructure, etc. - Preparation of Communication “A secure and competitive EU Gas Policy” - integrated view on EU gas policy - no separate “LNG Action Plan” as referred to in SER2 Legal: - Second Reading on 3rd IEM Package - gas specfic Trilogue only next week - target: agreement within this legislature - Revision of Security of Gas Supply Directive Operational: - MF XV homework, GGPLNG

3rd IEM Package perspective (1) Package provides more solid basis [depending on final second reading outcome !] for taking workshop issues further: TPA (Art 15) [new Regulation, some differences between EP and CP !] CAM/CMP (Art 17) [new Regulation, some differences between EP and CP !] offer same services under equivalent contractual terms & conditions offer services compatible with use of interconnected gas transportation system  ref. to cooperation with TSOs make « relevant information » public on use and availablility of services  meet TUs « reasoable commercial needs » ambitious and balanced provisions: efficient and maximum use of capacity & facilitate investment in new infrastructure LSO to offer unused capacity on primary market

3rd IEM Package perspective (2) Transparency (Art 19) [new Regulation, some differences between EP and CP !] Trading of capacity rights (Art 22) [new Regulation, some differences between EP and CP !] disclosure of information re. services offered, conditions applied and technical information information on contracted and available capacities (regular, rolling basis, user-friendly, …) disclosure requirements also for exempted terminals some provisions on confidetiality [PM: role of NRAs ?] all SOs shall ensure harmonized « contracts and procedures on primary market to facilitate secondary trade »

LNG Policy rationale for regulatory framework Many terminals in EU have capacity (almost) fully booked in long- term contracts. Parties seeking long-term capacity booking depend on participation in terminal enhancement / construction project. BUT … capacity committed in long-term contracts is not used all the time (overcapacity in regasification) and access to short-term capacity (primary and secondary) is becoming more important - substitute scarce long-term capacity - capture potential of short-term trading opportunities What does EU market need ? Fair level playing field & investment friendly conditions: arbitrage possibilities across EU terminals (if price differentials allow) no regulatory distortion ? prevention of capacity hoarding ! Transparency for services offered and tariffs charged ! Certain alignment of services offered by LSO ?

Set-up and ambition of workshop Discuss Action Points: dynamic view (perspective of 3rd Package, business cycle, question well-known established views ..)  selection of priorities IV thematic blocks of Action Points: “lead stakeholder” per block, stakeholder presentations, discussion, conclusions on consolidated position of group Consolidate stakeholders’ views on Action Points to report back to next MF consider input into wider EU energy policy process under way (COM Communication on gas ?)

Running order (1) BLOCK I BLOCK II  Eurogas to kick-start 1) Preliminary findings from monitoring GGPLNG 2) Further analysis of tariffs and revenue regulation applied to LNG terminals  ERGEG to kick-start BLOCK II 1) Application of CAM principles to past capacity bookings 2) Need for harmonisation of anti-hoarding notification periods and anti- hoarding rules regarding the effect on capacity rights 3) [if the analysis above concludes that harmonisation is needed] recommendation on what such notification period and anti- hoarding rules should be  Eurogas to kick-start

Running order (2) BLOCK III BLOCK IV  GLE to kick-start 1) Identification of all technically possible and commercially relevant “unbundled services” 2) Benefits of detailed requirements for tradability of terminal access services, and possibilities and benefits of standard contracts offered for the same LSO services 3) Need for rules on prospective transparency 4) Need for detailed rules on transparency with regards to services offered  EFET to kick-start BLOCK IV Steps to improve cooperation between LSOs and interconnected TSOs Assess costs & benefits of minimum gas quality requirements at the entrance of terminals in the development of standards issued to CEN  GLE to kick-start