U.S. Memorial to those who fought on Iwo in 1945 c./1956.

Slides:



Advertisements
Similar presentations
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Advertisements

Special Events Car Project By Russell W. Green Poway, CA January 15, 2011.
Architectural Drawing
GOAL Access and Address Visibility. Trimming Around Driveway Grinding stumps after trees were cut down.
Creating a functional, aesthetic service area
KITCHEN PLANNING WORK TRIANGLE.
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
1 4 MAN MECHANICS. 2 GENERAL PRINCIPLES In 4 man crew someone will ALWAYS go out on fly balls and once out stays out; Check swings appeals go to U1 on.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Welcome to the The LSU Olinde Career Center Recruitment Center is located on the second floor of the LSU Student Union in room 258. The Union is on the.
Creation of an HVOB3BC by Phil Zabell KI6SMN.
CHRISTMAS.
Washington D. C. Our Nation’s Capital
VOR NAVIGATION BRENT CROW.
Intercepting WW II Enemy Wireless Signals at Ottawa Monitoring Station Ernie Brown VA3OEB.
Exhaust fumes from poorly run vehicles, can kill! As a stick props open the trunk to make room for passengers the small child is facing many dangers just.
1 July 8, 2011 Boxes were moved between ground floor and console room floor. –Safety equipment and supplies identified and unpacked. –LN2 tank was unpacked.
National World War II Memorial Washington, D.C., USA.
By Frolov Peter 3G3G CHRISTMAS TRADITIONS TREES AND PRESENTS CHRISTMAS STOCKINGS CHRISTMAS PUDDING HOLLY AND MISTLETOE CHRISTMAS DAY BOXING DAY CHRISTMAS.
Our Topic: The main question: It is celebrated on the 25 th of December. It is celebrated on the 25 th of December.. It is the greatest holiday in Britain.
Fixture Standards. Layouts Fixtures WorkingStation FixtureAccessories Greeter’sArea EquipmentContents.
LA Series Fixed Aircraft Homer Module 10 of CASARA ELT Training Plan.
Canadian Valley Technology Center. Where the Emergency Handbook is located in this department Immediate response to emergencies The location of emergency.
November 2012 Updates: Celebrating the delights of food making and eating!
Impact of WWII on African Americans
OLD POLE Remediation Project FY11. Old Pole Location.
12/14/2011AEG Associates for the LTC Discussion Group  Presentation by Albert E. Graf, AIA AEG Associates, Annapolis, MD Building a Home Considering Universal.
New Timing and Control Equipment At LSU Wildwood, NJ.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Night Operations. Dangers of Shift Work According to Occupational Hazards Magazine: According to Occupational Hazards Magazine: Work related injuries.
A Hardware Perspective DUAL POLARIZATION UPGRADE.
Prepositions of Place “In”, “On”, and “At”. Use “in” with spaces In a box.
RADIO AIDS AND NAVIGATIONAL SYSTEMS
CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry.
Faculty/Instructor Development Birds of a Feather Tiffany L. Holmes, D.C. Coordinator of Simulation Labs.
ebee company presentation
By Cyrus Cortez. Hernan was shopping for a TV to fit in his stand. The stand has a width of 20 inches. The TV is 15 inches tall and the diagonal distance.
Residential Audio & Video Systems Copyright © 2005 Heathkit Company, Inc. All Rights Reserved Presentation 14 – Introduction to Whole House Audio and Video.
Unit 1 School Life Word power. Look around your school. Can you say any school facilities? classroom playground.
Distances are NOT to scale N Bypass The University of Virginia Exit 118B to Staunton to Monticello (11 mi.) Rotunda Omni Hotel (7 mi.) to Richmond Boar’s.
Dover castle By Shane and Rachel. Location Dover Castle is located in Dover, England.
Crew 1717 Camp Duty Roster Event : ___________ Date: ____________
Planning Electrical Circuits Original by Ryan Talton Modified by Georgia Agriculture Education Curriculum Office –June 2004.
End Fed Antenna Secrets Select, Install & Operate
End Fed Antenna Secrets Select, Install & Operate
Planning Electrical Circuits
Intercepting WW II Enemy Wireless Signals at Ottawa Monitoring Station
Installation Moving picture Sunstar Precision Co.,Ltd.
At Home in the U.S. during WWII.
Loran C.
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
MEMORIES FROM JAPAN Southern Japan Radar Group 610/618th ACW Squadrons
Planning Electrical Circuits
Smitty’s Super Speed Drill for Memorization No. 2
Town of Chestermere 2014 Preliminary Operating Budget Budget 2014
Bluffdale City Emergency Communications
End Fed Antenna Secrets Select, Install & Operate
Architectural Drawing
MNM Fatal Powered Haulage August 29, 2006 (Pennsylvania)
Map Courtesy Bill Cross ’50-’53
Photographed by Dorothea Lange
Warm up List three facts from the video..
2 POINT PERSPECTIVE.
ESTARTIT NOV 2009 I served aboard Loran Station Estartit twice. Once the first time was in Oct 1977 – Apr This was my best tour of duty. The town.
Saturday, August 3rd, AM-1PM at the Freeman Expo Hall
Mowrey Hall Renovation
Pole Position Student Points Time
A B C D.
Presentation transcript:

U.S. Memorial to those who fought on Iwo in 1945 c./1956

Japanese Pillbox atop of Mount Scribachi

One of many Japanese memorials to those who fought on IWO

A close up

Another Japanese war memorial

Station Entrance Sign c./1956

Flag flying at the LORAN Station

The signal hut (Timers/Transmitters) prior to new construction c./1956

Mess Hall/Galley in fore ground, barracks & Rec Hall

Galley & Mess Hall

Station c.1956 prior to new construction Front L to R: CO/XO/CPO Qtrs; Warehouse; Garage/Workshop Rear L to R: Genertors (Sq Building); Rec Hall; Barracks; Galley Poles part of the comb rec ant system

Signal Hut c./1956 The two farthest poles were the T-Top Ant Gray boxes were tuning couplers for each transmitter Other poles Rec Comb for both rates

Rec Room c./1956

Start of new construction c./1956

New construction in process c./1956

Barracks room c./1956

UE-1 Timers in Quansont hut c./1956 Note: This is the equipment prior to the new construction

T-137 Transmitter c./1956 in Quansont hut Note: This is the equipment prior to the new construction

Transmitter room – chair in timer room c./1956

Radio Operator c./1956 Andy Anderson

LORAN watch Andy Anderson

LORAN watchstander Bob Tiffany

And the signal they watch

Bob Tiffany – 1955/56 New Years Eve Celebration Highlight

New construction of the station buildings c./1956

New Mess/Galley straight ahead Barracks on the left

Mess Hall/Galley straight ahead Barracks on the left

The Dedication of the new station c./Nov 15, 1956

Japanese cooks preparing the dedication dinner

RM Andy Anderson

The new home for the crew

The new Rec room

Ham Radio Operators Station

DC Shop

Center: CS Kutner?; ETC

The new signal building c./1956 This was the Garage in 1975

New Timer installation c./1956

L to R: Exec; ETC

LORAN Watchstander, standing watch with the new equipment

Bob Tiffany on watch

New power plant

HF Comms Xtmr (Tck?) on right Power supply on left

CS Kutner

The airbase

The USO Show

Andy Anderson with one of the USO performers