Removal of national particularities

Slides:



Advertisements
Similar presentations
1 CAATS Second Workshop Validation User Group VDR Survey - Results Ulrich Borkenhagen; EUROCONTROL HQ, Core Team Lanzarote, Thursday 16 th February 2006.
Advertisements

EASY TEAM MANAGER By Dave Abineri EASYWARE: PO Box 231, Milford, OHIO (Cincinnati) Phone: (513) Use UP arrow to move to the NEXT slide Use.
1 Interoperability of Spatial Data Sets and Services Data quality and Metadata: what is needed, what is feasible, next steps Interoperability of Spatial.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
1 The Great Presenter Prepared by Rong-Fong Fung.
Job Description Training
BENCH-CAN Internal evaluation 2nd semester
Bosnia & Herzegovina Statistical Training
Information Systems in Organizations 2
Consultant Log Data Entry Review
The Management Process
DATA INPUT AND OUTPUT.
Presented by CMLE Dr. Mary Wilkins Jordan
Sourcing Event Tool Kit Multiline Sourcing, Market Baskets and Bundles
Information Systems in Organizations 2
Discover How Your Business Can Benefit from a Facebook Fanpage
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
Steps To Add A Family Member To A Microsoft Account.
Online Training Course
Fast Action Links extension A love letter to CiviCRM
Current Issues or Challenges in Visual Analytics
How To Locate Missing Transactions in QuickBooks Desktop
You know that customers are the life-blood of your small business, and that making your customers happy is what keeps them coming back to you again and.
Information Systems in Organizations 2
New Functionality in ARIN Online
TTR IT Implementation Capacity Offer/Request/Allocation
North Carolina’s Transition to CMDP
Non-RU Applicant (NRA), PCS UG
RFC Short Term Path Request Pilots
Redesign of the International Timetabling Process (TTR)
Removal of national particularities, PCS UG
Meeting, training & teaching in the interactive iWorld
Envelope Concept report, PCS UG
Lean Six Sigma Project Name: Project: Date: Intros Expecations
Information Systems in Organizations 2
Making Your M&E EASIER AND BETTER
CLIENT RELATIONSHIP MANAGEMENT KEEPING TRACK OF REQUESTS THE EASY WAY
PCS Minor Release th February 2018, PCS UG.
PCS CCB Group 22nd February, 2017.
TAF-TSI Train Object 25th June 2018, Prague.
Redesign of the International Timetabling Process (TTR)
Inclusive Communication Hub
IT Support for TTR Pilots
Information Systems in Organizations 2
PCS User Group 15th February, 2017.
PCS User Group Vienna, 13th September 2017.
Retrospective report of the past year
PCS Groups and Boards PCS Day 2016
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
Introduction to Engineering Design II (IE 202)
How to Be Professional Day Two
Business Mail Test and Innovation Scheme
PaP Product Definition
Energy Statistics Compilers Manual
JS Pilot and TEG Meeting, Vienna, 12/02/2019
NSS Instrument Project Tollgate Coordinator
TSI Compliant PCS Mandatory Interface
Delegation Skills.
Easy-Speak How easy is it?
ÖBB-Infrastruktur AG Network Access – Customer Care Patrick Wögenstein
Change Process communication plan: Google Education
PCS Technical Board 27th February 2018, Vienna.
Created by Kumar. Most of the peoples are running without any management to complete their goals or works within the time. However, 90% become.
Fiscal policy program Presented by Cindy Draper, Fiscal Policy Officer – Training Days 2018 Introduce myself This session is to provide an overview of.
Evaluations and Trials in Alma
Business Mail Test and Innovation Scheme
Preparing your resume  Contents:  1. Writing a cover letter  2. Writing your resume  3. Grammar in practice: GENERAL GRAMMAR  4. Writing exercise.
TT Quality monitoring on borders
Business Mail Test and Innovation Scheme
This is a template for a presentation that you can use to introduce your team to Harvest. You can customize the content of the slides. You’ll want to pay.
Presentation transcript:

Removal of national particularities Introduction Became team member Next presenter Removal of national particularities PCS-TTR Day 2018, Vienna

Previously about National IM Parameters Why do we have to talk about it? I would like to give you a quick overwiev and highlight the importance of it! Since PCS introduced the number of National parameters grew dramatically in the past few years. We all know what are these parameters are for! We all know that PCS contains common parameters, but what happens when these parameter are not suitable enough? Guess what? Then each IM/AB has to create their own network specific parameters (NS). Everybody who is regular PCS user started to create these parameters and the number of these parameters are highly increased! This is the point where the problem have started….

National Parameters (Network Specific Parameters) Our target is to reduce the number of National Parameters together with IMs/ABs as much as possible. However, if some exist, why do we need them in PCS? National System PCS 1 2 3 Without National Parameters in PCS Common parameter National parameter National System PCS 1 2 With National Parameters in PCS Common and national parameter What would like to achive? To reduce the number of National Parameters. (We can delete all of them from the system that is not a problem! ) However, if some exist, but still why do we need them in PCS? The reason is why you need to enter into your National System! See PCS how works without National Parameters together with the National Systems, You need to use another communication chanel, to send email or text to notify others and after Manually has to enter these parameters. And see when PCS is working with National Parameters, how easy it is, you enter the information ones and goes into the National system!

Steps with the parameters STANDARDIZE In case of partial interest, National Parameters should be harmonized among the creator IMs/ABs (name, format, validation, etc.) DISCUSS First National Parameter workshop, organized by PCS Team. Target is the removal/harmonization of National Parameters for TT2020 REMOVE National Parameters that are already part of the existing TAF/TAP-TSI or PCS schema should be removed by the IMs/ABs Mid-term ADOPT In case of common interest, National Parameters should be added to the general TAF/TAP-TSI schema Long-term How di we get there? Basicly analyzed the last years parameters which have already defined in the system. What to do with these parameters? Stadardize the validation, format and name! Why? It happenes that the same parameter have been defined by IMs on a different name or on slightly different name. When there is clearly a common demand, it shall be checked by the sector, whether it makes sense to include to the common schema. Discuss: Outr work continued with various discussions and first National IM Parameter and Loco Preparation for TT2020 meeting held in October, where we checked the parameters and proposed some optimization. Ex. Öbb and VPE started to use same parameters. This what we have done in short term actions and our work continues with Mid and Long-term actions. Mid –term remove: degrees the number of those parameters which are already part of TAF/TSI and PCS schema. And for long-term adopt: In case of common interest National Parameters should be added to the TAF/TSI schema. Short-term Short-term

Checking the results of the short-term actions

Participation in the workshop 30th October 2018, a workshop (WS) was organized for IMs/Abs to review their national IM parameters (NIMP) and loco types. Participated on the WS Absent from the WS, but sent data Absent from the WS, pending information No NIMP in PCS As I mentioned earlier the first workshop organized in October. PCS Team would like to show how efficient we were and how many IMs we have been working together with to optimize these parameters.

Comparison 2019 and 2020 345 216 Parameters in total ADIF Contact information is available in PCS, no need for parameters. See the comparison a bit detailed and on the chart and see how many total number of parameters we had in the system! See what we achived now! Degreesed the number of it from 345 to 216. Lets see some examples: We received valuable inputs under the analysis, let me present 3 examples. It could have the numbers are chanced since last month. CFR PCS common technical planned data is suitable enough, no need for parameters VPE Re-conceptualize the way of ordering services, need for less parameters

Looking deeper behind the figures Are all the parameters for the RUs? No, some parameters, e.g. at SZDC network are for the IM to provide additional information to the offer Are all the parameters mandatory? No, most of them are optional Parameters in total 82 Lets looking behind the figures. Are all the parameters for the RUs? No, some parameters, e.g. at SZDC network are for the IM to provide additional information to the offer Are all the parameters mandatory? No, most of them are optional See what we achieved so far! How many mandatory parameters do we have in the system! Get examples But there is a long way to go as we still have all together 82 clustered ! *Number of mandatory parameters are lower, if there is national (TPN, M-AMA) request

Clustering The 82 mandatory parameters can be clustered by motivation index, local index and schema index. Motivation index Operational Organizational Double requests Timetabling Invoicing, charging Network statements Safety reasons Local index The need is only local The need is available European wide Schema index We have qlassified the parameters: Motivation – what is the purpose? Local Schema index: exaples: Dangeourus goods Contact informations Tilting And according to the role of responsibility, role of responsible applicant and role of responsible RU – not always the same person who orders and manages the train! Missing in TAF, but it’s mandatory nationally Part of PCS, but in slightly different format Part of PCS, but not included in TAF Part of TAF, but not yet in PCS

Thank you! Introduction Became team member Next presenter