The European Organisation for the Safety of Air Navigation NM Development Plan 2012-2014 V4.5 Moving Towards an Integrated ASM/ATFCM/ATS Approach Etienne.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSVÖTN European Organisation for the Safety of Air Navigation Žarko SIVČEV EUROCONTROL.
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
© EUROCONTROL 2012 – Network Management Operations Centre (NMOC/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Hans Koolen EDITION 12/11/2012 WHY.
ETFMS - SYSTEM OVERVIEW
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
Draft Concept of Operations (CONOPS) for CS#1- FAS Centralised service on Flight Plan and Airport Slot Consistency (FAS) Matthis Birenheide Project Manager.
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Kim Breivik Chairman EUR 2012 Task Force Operational Requirements, Network Management.
CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels,
ATFM Priorities Evaluation Study Alison Hudgell QinetiQ
Hans Koolen NMOC/CFMU Network Operations Services
Moving Towards an Integrated ASM/ATFCM/ATS Approach
LSSIP Objective AOP01.2.
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
31/03/2017 Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Cooperation in crisis and contingency situations Asli.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
1 FAB CE Feasibility Study Operations FAB CE Stakeholders Workshop March 5 th 2008, Prague.
Mission Trajectory Step 1 From planning to deployment.
Nicky Cooper Head Network Operations Management
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Operational requirements for ASM systems Giuseppe Acampora EUROCONTROL.
The European Organisation for the Safety of Air Navigation MILO Military Liaison Officer in NMOC Civil-Military Cooperation 20 September 2012 Support function.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Harmonised Data Sharing Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.
NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.
ATM Modernisation & Network Manager Frank Brenner, Director General EUROCONTROL Airbus ProSky Symposium April 8 th – 10 th, 2014, Abu Dhabi.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
Peter Matern Head of ADM Unit 30/01/2014
Volcanic Ash Crisis 2010 Seminar Belgrade, 7 th September 2010 INFORMATION SHARING IN VA CRISIS European Organisation for the Safety of Air Navigation.
SESAR Single European Sky Air traffic management Research
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
Regional ATFM in Europe
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
The European Organisation for the Safety of Air Navigation Brian Flynn Directorate of Network Management Head Network Operations unit EUROCONTROL What.
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
EUROCONTROL Central Flow Management Unit Engineering Division EUROCONTROL Central Flow Management Unit Engineering Division Ada in Industry An Experience.
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
International Federation of Air Traffic Safety Electronics Associations PCP and CP2 by Robert Schneebuaer IFATSEA Ambassador.
Collaborative Decision Making (CDM) Saulo Da Silva
Welcome to the SESAR SWIM Master Class 2013
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
SIP/2012/ASBU/Nairobi-WP/19
OPTIFRAME : Project Overview
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
OptiFrame WP1: Project Management
Ensuring a 'Flexible Use of Airspace'….
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Presentation transcript:

The European Organisation for the Safety of Air Navigation NM Development Plan V4.5 Moving Towards an Integrated ASM/ATFCM/ATS Approach Etienne de Muelenaere 20 September 2012

DNM Development Plan NM Development Plan Towards the Shared Business Trajectory Enhancing CDM in Network Operations Improved sharing of ATM data Towards Time Based Operations (STAM, TTA) NOP Roadmap Improving current NM Services Improving current Technical Services

DNM Development Plan Release NM16.5 Release NM17.5 Release NM17 Release NM19 Programmes roadmap Release NM Research & DevelopmentDevelopment & DeploymentPost-Deployment (Correction and Tuning) 4D Profile, FPReRestriction UUID ASM-ATFCM CACD EAD Support to Prevalidation ATM data Publication Remote provision of ATM data Archiving ADR Data Improved sharing of ATM data TTA Publication, STAM decisions promulgation Towards Time-based operations New NOP interfaces Crisis management NOP FRA Incremental improvements CIAM CCAMS ICAO 2012 Incremental improvements Domains C&T Shared Business Trajectory Scenario data management Access to simulations Enhancing CDM in NOS operations Trial 2 Trial 1 Trial - Use of 4D Profile Post-Deployment improvements Pre-Deployment improvements Post-Deployment improvements 2015 ADR Phase 1 C/S deconfliction Multi-AOs C/S deconfliction CSST

DNM Development Plan Use of AO 4D profile (FB499 – NM17) Towards the Shared Business Trajectory NM operations Taxi SID STAR TOC TOD eRestrictions (FB555 - NM17.5) Consistent 4D Profile processing (FB460 - NM17) FPL Domain improvements (FB523 – NM17.5) FPL Support via NOP (FB553 – NM17.5) ETFMS CACD EET FPL submission via the NOP (FB559 – NM17.5) IFPS Reduce manual process for FPL (FB550 – NM17) FIXM (FB554) Flight Object (FB544) FPR (FB556 – NM17 )

DNM Development Plan Towards Time Based Operations (STAM, TTA) TTA ACC1ACC2 ACC3 NM operations Support to coordination via the NOP (cherry picking, measure edition, action flow, hotspot overview, hotspot in Flight list) STAM Measures for flows (FB529 – NM17.5) IFPS ETFMS Impact of STAM on IFPS/ETFMS TTA TTA Publication (FB533 - NM17) STAM Decisions promulgation (FB140 – NM17.5) Traffic Complexity (FB229 – NM17.5)

DNM Development Plan Access to Simulation (FB360 - NM17) Enhancing CDM in Network Operations NM operations TACT NMC / MILO PREDICT ENV updates (AUP, UUP, RAD, Configuration changes) Enhance Network Impact Assessment (FB283 – NM17 ) Regulation editor (FB587 – NM17.5) CACD Traffic volume Dynamic design of Reference Locations (FB514 – NM18) ENV ops SIMEX Improve Performance Monitoring (FB456) Release nd step

DNM Development Plan Improved sharing of ATM data NM operations CACD EAD Interoperability between EAD and CACD (FB569 – NM17, FB511 – NM18) Remote provision of ATM / non-AIP data (FB532 – NM18) Publication of ATM Data through ADR: Live Updates (FB510 – NM17.5) and New Data (FB567 – NM18) NOP Access Layer Prepare Ops Deployment with ASM tools (FB572 – NM17)

DNM Development Plan NOP Roadmap D+1 reports (FB561 – NM16.5) Real-time network situation displays (TB100 – NM17.5) Flights impacted by crisis - consistent information sharing (FB562 – NM17.5) RAD input, Axis input (FB558 – NM17.5) FPL Support via NOP (FB553 – NM17.5) FPL submission via the NOP (FB559 – NM17.5) Update NOP to NM banners (FB584)

DNM Development Plan Improving current NM Services FRA FB526, FB576 – NM17.5, FB577 – NM18 TB106 CIAM FB527 TB082 FPL domain FB523 – NM17.5 FB550 ATFCM domain FB524 Airspace Data Domain FB528, FB536 – NM17.5, FB581 – NM17.5 ICAO 2012 FB521 – NM17.5 Reporting FB154, FB585 – NM17.5 CCAMS FB537, FB575 – NM17.5 CSST FB588 – NM17.5 FB513 – NM18 Interfaces FB489 – NM17.5

DNM Development Plan Improve NOP User experience – HMI alignment Monitor Service Access (TB101 – NM17.5) Centralization of Users preferences (TB093 – NM17) Interface personalization Access from new devices, Application desktop view (TB107– NM17 ) NM operations Enhanced usability (TB109 – NM17 ) Most info within 3 clicks Harmonize design Search functionality Enhanced print Time-out and response time issues addressed

DNM Development Plan Current Plan (1) ObjectiveFBFunctional Blocks External Contribution Release 17 Release 17.5 Release 18 Towards the Shared Business Trajectory 555eRestrictions (eRAD) TEN-T o 556eRestrictions (including FPR) TEN-T o 460Increase AO flight profile consistency WP o 499Use of AO 4D profile - Prototype WP WP oo 554FIXM Strategy in SESAR WP 8 o 544Initial Flight Object Prototype WP WP o o Enhancing Network Operations 283Network Impact Assessment o 514Dynamic design of Reference Locations WP o 456Alignment to Performance framework WP o 360Scenario Data management o Airspace Data Repository 510Publication of ATM Data through ADR - Live Updates TEN-T o 511Interoperaility between EAD and CACD TEN-T o 532Remote provision of ATM/non-AIP data TEN-T o 567Publication of ATM Data through ADR - New Data TEN-T o Towards Dynamic DCB 533TTA in SESAR Trial R3 WP WP o 140STAM Decisions promulgation (proto) WP WP o 229Flight Level publication WP o 529Flow Measures for STAM (proto) WP WP o NOP Roadmap 557NM customisable platform for all users TEN-T o 558Data exchange to support collaboration decision making TEN-T o 559Fully integrated flight planning and flow management service TEN-T o 560real-time network situation displays TEN-T o 561post operations reports TEN-T o 562crisis management TEN-T o 553Single HelpDesk TEN-T o

DNM Development Plan Current Plan (2) ObjectiveFBFunctional Blocks External Contribution Release 17 Release 17.5 Release 18 Improving current services 528Airspace Data Domain improvements o 526FRA Improvements o 527CIAM Improvements o 489Improve CHMI Services o 524ATFCM Domain improvements o 154Reporting C&T for Release 17 o 523Flight Planning Domain improvements o 550Reduce manual flight plan processing in IFPS o 536Provision of Departure data - 8 o 517Refine ATFM Delay Calculation o 521Post-Deployment icao fpl o 537Post-Deployment CCAMS o Technical Evolutions 82CIAM re-engineering o 106FRA re-engineering o 93HMI Customisation TEN-T o 100NOP Map Techno TEN-T o 101Service Management TEN-T o 97COTS upgrade o 107Desktop/Workspace Management TEN-T o 109Front-End framework TEN-T o 47Geo Env Synchronisation o CSST 568CSST C & T o 513Multi-AOs Call-sign deconfliction o

DNM Development Plan Release Schedule Migration Dates Release NM17.0->Mar 2013 Release NM17.5->Sep 2013 Release NM18.0->Mar 2014 Release Notes (NM16.5 and NM17) and Releases Deployment Plan (NM16.5) available at: page/library_release_information.htmlhttp:// page/library_release_information.html Scope Definition Dates Release NM17.0->Done Release NM17.5->Oct 2012 Release NM18.0->Mar 2013