UCB Progress with 8” MCPs and Testing

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

MCP Electrodes and End Spoiling
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
The Factors that Limit Time Resolution in Photodetectors, Workshop, University of Chicago, April 2011 What is known experimentally about timing determinants.
O. Siegmund 11/15/11 20 cm and 33mm MCP Test Progress Lifetest with #164/163 continues – now close to 2 C cm -2 New batch of 33mm test MCPs arrived Chem-3.
Watch the following video and answer the questions on your question sheet. Importance of Testing.
Optical image tube with Medipix readout
Microchannel Plates signals, Picosecond timing, Design’s minimum performance.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
Existing fabrication facilities for PC's for imaging MCP detectors Dr. O.H.W. Siegmund Experimental Astrophysics Group Space Sciences Laboratory University.
Medipix2 meeting Dec Medipix Activity at Berkeley John Vallerga, Jason McPhate, Anton Tremsin and Bettina Mikulec.
RPC (Resistive Plate Chamber)
Characterization: CNM Proposal Slade J. Jokela, Igor V. Veryovkin, Alexander V. Zinovev.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
PAX DETECTOR THERMAL SIMULATION 1Vittore Carassiti - INFN FEFz-Juelich, 27/10/2008.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
1 Tehniline ülevaade uusimast füüsikast CERN’is Endel Lippmaa 20. Detsember 2006, TTÜ.
Baudrand SylvestrePhysics Research Commitee1 Status of the Longitudinal and Transverse Polarimeters Working polarimeters HERA polarization status 2005.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Study of UV absorption and photoelectron emission in RPC (Resistive Plate Counters) detector with an UV source Carlo Gustavino (INFN-LNGS) RPC and their.
Berkeley Update Oswald Siegmund & Jason McPhate LAPP Weekly Telecon 11 January 2011.
O. Siegmund, UCB, SSL 1 Incom substrate, 33mm diameter, ANL#103 20µm pores, 8 deg bias, 60:1 L/D, 65% OAR Electrode deposited last (on top/bottom) ANL.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Collaboration Meeting Argonne National Laboratory June 10-11, 2010 Mechanical Design of Glass Tiles and Trays Rich Northrop University of Chicago Second.
Space Sciences Laboratory, University of California, Berkeley SSL-UCB, ALD MCP Test Progress ML201-B-2 12nm ALD After cleaning ML201-B-1 6nm ALD.
They are all about New Year’s resolutions It’s New Year’s day and you have decided to make resolutions. Write a list of new year’s resolutions that.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
(8”x8”) MCPs Resistance Measurements Oct 04, 2011 Anil Mane, Jeffrey Elam.
(8”x8”) MCPs Resistance Optimization by ALD Sept 20, 2011 Anil Mane, Jeffrey Elam.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Area Covered. Work Done Quantity Financial Progress of work.
Results with the RPC system of OPERA and perspectives
Neutron Imaging and Tomography with MCPs
Dissociation of Molecular Ions Studied by
CLAS12 Forward Tracking: Status and Challenges
Integration of the e+ elements
Part-V Micropattern gaseous detectors
Detector development for
Surface Concept Position Sensitive MCP Detectors Novel Solutions A
nSW Alignment Installation
Analyzing Games of Chance
MDC Data Check Wu Linghui
Hellenic Open University
Assessment Activities
Ion Detectors and The Proportional Detector
Steps towards beam commissioning: Photon Diagnostics
MCP Electrodes and End Spoiling
Proposals of new electron cloud monitor in the PS
Detector development for
UCB Progress with 8” MCPs and Testing
Progress on the development of a low-cost fast-timing microchannel plate photodetector Junqi Xie1, Karen Byrum1, Marcel Demarteau1, Joseph Gregar1, Edward.
Methods of fish thawing
Cosmic ray test of RPC for the ATLAS experiment
Large area Inconel coatings
Adam Abdulwahab Evaluation network, Brussels,14th April 2011
Arradiance ALD/Incom MCP Test
Grid space coating-updates 05/01/2012
Variable distance from beam.
Development of Resistive Plate Chamber for charge particle detection
Straw Tubes Development at ISIS
Tom Shea, Andreas Jansson, Cyrille Thomas
Readout electronics system for Laser TPC prototype
S M A R T Smart Objectives Goals need to be Achievable
MWPC (Multiwire proportional chamber)

Presentation transcript:

UCB Progress with 8” MCPs and Testing 8” electroded MCP in the open face test detector. MCP #3 and MCP #2 have been electroded on both sides with 1700Å inconel. #2 is 31kΩ and #3 is 3MΩ in air - will do vacuum tests shortly.

8” Open Face Test Detector Everything except the mounting plate for the 8” open face test detector is done. The cross delay line is exactly as models predicted, ~250ns delay. We expect to Achieve <200µm spatial resolution for evaluation of 8” MCPs. All the electronics is in place for data recording.

8” MCP Test Detector Vacuum System Vacuum test chamber system for testing the 8” MCPs is finished and undergoing commissioning tests.