Always use the correct lifting equipment
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Ensure a safety briefing is given where appropriate
Always ensure travelling block is stationary during DM changeover
Always use mechanical handling aids when carrying out a heavy lift
Always use 3 points of contact when using ladders
PDO Safety Advice Date: Injury: Fractured finger
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
Don’t pull a twisted sling
Always stay out of the line of fire
PDO Second Alert Date: Incident title: Fall from Height
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always ensure a stable position when working at height!
Always wear fall protection equipment when working at height
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: Fatality What happened?
Beware of Fall hazards while working at edge of trailer
Adequate tethered tools
Photo explaining what was done wrong
Pay attention to your footing
Unsecured pup joint falling
Crane operating with boom lowered and under Supervision
PDO Second Alert Date: Incident: LTI What happened?
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always assess the risks, Stop and think.
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Always ensure “no go” zone are in place
Check equipment prior to start the job
Do not move into the Line of Fire
Always be vigilant while moving across well site location
Seek assistance of Banksman while reversing the vehicle
Always intervene an unsafe act
Safe distance from the edge Maintain a safe distance while driving
Always keep your equipment maintained
Check Level Setup prior Lifting & Lowering Operation
PDO Second Alert What happened? Your learning from this incident..
Keep away from “Line of Fire”
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

PDO Second Alert Date: 03.04.2018 Incident title: LTI What happened? While laying down 4” drill pipe from rig floor, roustabout went up on the catwalk to remove the lifting cap. After removing the lifting cap roustabout pushed the drill pipe backward on the roller bars, the pipe moved toward edge of catwalk, knocking roustabout to ground (approximately 1.1 meter height) and DP landed on his left leg above ankle resulting in a fracture to his left leg. Your learning from this incident.. Ensure roustabouts have clear task instructions Ensure pull push stick are used where appropriate Always make sure that intervention is implemented on your sites Ensure all supervisors and crews are using learning from incidents Ensure all task specific hazards and controls are discussed in TBT meeting. Ensure access to catwalk is restricted during operation. Always ensure all stoppers are in place if pipe racks are removed

Management self audit Date: 03.04.2018 Incident title: LTI As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure that adequate supervision for the ongoing jobs/activities all the time? Do your supervisors plan the job and identify the associated risks before starting the job? Do your supervisors prioritize the job before assigning the tasks to crew? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.