Waste Oil Wagon Waste Vegetable Oil Collection Service Jerry Robock and Josh Levin.

Slides:



Advertisements
Similar presentations
LTL (Less-than-Truckload)
Advertisements

Bio Energy What is going on out there with renewables ?
SSE14 – Students will explain the Characteristics of Pure Competition You have to --- –Know what pure competition is. –Understand How it works. Buyers.
Energy Conservation Energy Management.
Capacity and Constraint Management
Copyright © Cengage Learning. All rights reserved. OPTIMIZING LOT SIZE AND HARVEST SIZE 3.5.
Three Key Process Measures: Flow Rate
Strategic Control Control is taking measures that synchronize outcomes as closely as possible with plans Traditionally, has been almost completely based.
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Logistics Network Configuration
July, Nationwide Aggregated Purchase of Motor Fuel for State and Local Governments …true Aggregation – your added volume makes a difference!
July 2007 Ups and downs of a grease-to-biodiesel business A case study presented by Jason Burroughs.
Market Penetration of Biodiesel Kenneth R. Szulczyk, Ph.D.
Relevant Costs and Benefits
Fundamentals of Markets © 2011 D. Kirschen and the University of Washington 1.
Beyonce Vs. Buffett: Why Conservative Energy Efficiency is More Cost-effective than “Sexier” Policy Options Sue Libenson, Libenson Consulting, ,
Waste Veggie Oil Update Erica Spiegel UVM Recycling Program.
Supply Chain Management Managing the between all of the parties directly and indirectly involved in the procurement of a product or raw material.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
Pricing Strategy Considerations for a New Business A Macro Overview of Setting & Influencing Prices Class 26 Marketing Pricing Strategies Tuesday November.
Perfect Competition, Profits, Supply Chapter 9. Costs and Supply Decisions How much should a firm supply? –Firms and their managers should attempt to.
Perfect Competition Chapter 12. Costs and Supply Decisions How much should a firm supply? (Profits = Revenues – Costs) ▫Firms and their managers should.
Homework 6 Answers Question 1: Which is not a characteristic of a perfectly competitive industry? _B__ a. Marginal revenue is equal to the market price.
Biodiesel With Justin Lilly.
Residential Solid Waste Services Final Negotiated Contract with Waste Pro City of Palm Coast.
Not just a game.. What is a monopoly? A monopoly is a market dominated by a single seller. It has one seller and many members of buyers. Monopolies are.
San Juan County Solid Waste Program Rate Workshop 12/10/02.
Transportation 1. Learning Objectives Understand that gasoline combustion moves the vehicle as well as emit greenhouse gases. Understand that carbon emissions.
Commercial Waste Reduction Coordinator NEWMOA Conference, Sept 2005
City of Loveland Solid Waste Division Diversion Versus Disposal: Determining the Costs Diversion Versus Disposal: Determining the Costs.
The Ethanol Project A Feasibility Study Government and Policy.
Creating a Win-Win Relationship Presented by: John McCarthy GO Airport Express.
Chapter 7 Profit Maximization and Competitive Market.
Managerial and Cost Accounting. Know the major differences between financial accounting and Managerial Accounting Given a set of factory overhead data,
The Four Conditions for Perfect Competition
Biodiesel Supply: How Much Can We Produce? James A. Duffield Office of Energy Policy and New Uses, USDA Presented at the Clean Cities.
EYA-UBC BioDiesel Project A partnership of the Environmental Youth Alliance & UBC Department of Chemical & Biological Engineering.
Your company information
Marketing and Distribution
The Economics of Organisations and Strategy. Chapter 11 Price Discrimination and Bundling.
21st Annual Conference.
Operations Management Working with Suppliers
The Price Elasticities of Demand and Supply Chapter 06 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
P.Chandiran.  Cores  Remanufactured parts  New parts  OEM parts.
Monopoly.
August 01, 2008 Performance Modeling John Meisenbacher, MasterCard Worldwide.
Copyright 2010, The World Bank Group. All Rights Reserved. Industry statistics General overview 1 Business statistics and registers.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
Supply Chain Management Managing the flows of information between all of the parties directly and indirectly involved in the procurement of a product or.
Budgetary Planning and Control
Supply.
Residential Solid Waste Services Final Negotiated Contract with Waste Pro City of Palm Coast.
Thirty-six years of experience in  Customer Service, Call Centers, Commercial, Manufacturing, Food & Distribution Environments  Serving Over 1,500 Demanding.
Pasternack1 Optimal Pricing and Return Policies for Perishable Commodities B. A. Pasternack Presenter: Gökhan METAN.
Dilmar Fluid Services Offsite Reclamation A Reclamation Solution for Small to Mid Volume Customers.
Beverage Container Recycling We do it all! Reflective Recycling Inc “BevCon”
Chapter Outline Competition and market types in economic analysis
OUTLINE Introduction to physical distiribution Channels of distributions Physical Distribution Activities Transportation Costs Warehousing Role in Physical.
Chapter 5 Activity-Based Cost Management Systems.
Log Truck Scheduling Problem
Fuel Pricing Model - Update January 20 th, Agenda 1.Overview of model 2.Results over the past year 3.Going forward.
11-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Managing Economies of Scale in a Supply Chain: Cycle Inventory Role of Cycle.
Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
OPERATIONS MANAGEMENT. OPERATIONS MANAGEMENT 1  Where to produce? What is the best location for the business? In the case of manufacturing, this may.
If you have a transaction processing system, John Meisenbacher
© Thomson/South-Western ECONOMIC EDUCATION FOR CONSUMERS Slide 1 Consumer’s Role in the Economy Objectives: By the end of class, students will be able.
11-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Managing Economies of Scale in a Supply Chain: Cycle Inventory Role of Cycle.
Operational Objectives
Marketing of fruit and vegetables And Flowers A Presentation By Mr. Allah Dad Khan Former DG Agriculture Extension Kp Province.
Bin sensors and smart dynamic routing
Presentation transcript:

Waste Oil Wagon Waste Vegetable Oil Collection Service Jerry Robock and Josh Levin

Our Service Waste Oil Wagon (WOW) will provide a service to the restaurant and food processing industry by helping to manage the accumulation, storage and disposal of waste oil. WOW, acting as an intermediary, will deliver this WVO to a biodiesel refinery for conversion into biodiesel motor fuel.

The Landscape (Competition) There are currently national and regional waste removal companies that collect waste food preparation oils for a fee. These companies typically process this waste oil into intermediate products that are then sold for industrial uses. In the past this waste oil had some commodity value and waste haulers would either pay the restaurant or food processor for the waste oil or collect it for free. With the advent of Mad Cow disease, waste oil that contains animal products is no longer suitable in the manufacture of animal feed and the market for the intermediate product, normally called yellow grease, shrank. Restaurants and waste oil producers now must pay a fee to have their waste oil removed. In concert, waste haulers have fewer markets for their intermediate product.

Strategies In setting up WOW, there may be initial competition from the current waste oil haulers for this business. WOW will implement two initial strategies; start with a very small foot print and compete on price.

Setting up the Day to Day business The scale of this business must complement the biodiesel refinery capacity. For example, if the target refinery daily capacity is 600 gallons, then the collection service must meet or exceed this level of service. Components of Service: Vehicle recycling containers temporary storage scheduling

Vehicle In order to do this, a vehicle is need with either sufficient capacity to make a single run or efficient enough to make multiple runs. The type of storage that a customer will have will determine the type of vehicle needed. If the supplier (restaurant or other source of WVO) is provided 55 gallon drums to collect their WVO, a flat bed truck with a lift gate may be most appropriate. If the supplier refills the 5 gallon jugs the oil came in with waste oil, a pickup truck may suffice. If a more permanent receptacle exists a vehicle with a pump and storage tank would work best.

55 gallon drum collection

Back Alley Storage

55 Gallon Drums

Flat bed with lift gate for drums

After collecting

Bulk collection from bins

Pump truck

So wheres the money? At this time most suppliers pay a commercial hauler to remove their waste vegetable oil. These companies typically process the WVO into yellow grease (tallow) and sell it to manufacturers in the cosmetic, pharmaceutical or animal feed industries. They charge a fee from the supplier of WVO and make money selling tallow. WOW will have a similar business model but will charge less to the supplier (or perhaps nothing) and charge the biodiesel refiner for the WVO. The margins should be quite healthy as the WVO will be collected locally and delivered locally.

An example Lets assume that the biodiesel refinery has a capacity of 600 gallons per day. WOW would have to collect at least this amount each day. Assuming a restaurant uses 50 gallons of vegetable oil a week, do you service them weekly, bi-weekly, monthly? If you service them bi-weekly, then each collection would yield 100 gallons. Therefore, each day you would need to collect waste oil from 6 suppliers to meet the 600 gallon/day refinery capacity. If you need 6 suppliers per day, you would then need 42 suppliers per week and 84 total suppliers since you are collecting bi-weekly. How large a geographic area would you need to find 84 suppliers? Are there more optimal configurations?

Basic Capacity Model Using the previous example, demand of 600 gallons/day, your physical plant would scale to 200,000 gallons annually. To supply 600 gallons/day, using the previous assumptions, you would need 148 suppliers with an average weekly production of 50 gallons.

Sample Survey Results

Questions Using the previous analysis, the following questions need answers: Can you efficiently collect from 6 suppliers in a day? What is the optimal method for collecting 100 gallons at a time? Drum? Pails? Pump out? From the survey data, there are not 74 WVO suppliers in the Yorktown area. Do you build a smaller plant or venture far and wide? WVO volumes vary by supplier. Should you exclude small producers and drive farther to include larger ones? Which comes first, determine the capacity of the plant or the availability of the supply? How do you decide?

Collection Analysis

Optimization Analysis Given the capacity for Yorktown of 2,200 gallons available, the daily collection time required is only 221 minutes, or less than 3 hours. But, to fulfill the 600 gallons a day, an additional 86 minutes is required, assuming the supply is local. This would be approximately 5 hours/day for collection. Assuming that to collect additional waste oil you would have to travel farther, it is still reasonable to be able to collect 600 gallons/day using one truck and one person and to supply the biodiesel refinery.

Further Discussion If the optimal collection method is using Drums, then no supplier should be collected from unless they have a full drum. Some suppliers would produce less than a full drum in two weeks. Should the collection process be scheduled based on supplier volume rather than a weekly basis? If a supplier produced 110 gallons a week, then their collection schedule should be weekly. An optimization model is needed to schedule collection based on production such that a drum is collected only when it is full and in such a way as to not use more than one shift to do this.