Simon Trivella – 22nd May 2008 Distribution Workstream

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Distribution Network Interruption - Initialisation 28 September 2010.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 6 January 2011
Supply Point Capacity BSSOQ and Supply Point ratchets
Distribution workstream 29th January 2009
Transmission Workstream February 2009
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Consideration of issues raised by UNC Modification Proposal 0244
Datalogger / DMV Modification Proposals - Summary
User Pays Funding – Potential Licence Mechanism
Exit Capacity User Commitment – Transmission Workstream update
Review of UNC Section Q “Emergencies”
Transmission Workstream 4th July 2007
Action 0002: Meter Error Notifications
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
Reduction of Exit Capacity at DM Supply Points
WWU Interruption Update
Potential Nexus Topic: Universal Single Meter Point Supply Points
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
Consideration of issues raised by UNC Modification Proposal 0244
Review of Physical Regime Times for Modification Proposal 461
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Supply Point Capacity BSSOQ and Supply Point ratchets
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
DN Interruption & Charging
Review Group 0175: DM Supply Point Emergency Arrangements
Long Term Non Firm Capacity Update
Datalogger / DMV Modification Proposals - Summary
Transmission Workstream – Partial Assignment
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Assured Pressures Proposal
Consideration of issues raised by UNC Modification Proposal 0244
Reinstatement of NTS Interruption
Flat, flex, assured pressures Network Development Statement
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Stefan Leedham Transmission Workstream 2nd November 2006
Revised Tender Timescale for DN Interruption Arrangements
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Simon Trivella – 22nd May 2008 Distribution Workstream UNC Modification 0215 - Enduring Arrangements for Supply Point Capacity decrease at an Interruptible Supply Point Simon Trivella – 22nd May 2008 Distribution Workstream

Background UNC Modification Proposal 0090 (1st April 2008) Revised DN Interruption Arrangements Transitional Period 1 April 2008 to 30 September 2011 1st Annual Auction to take place in June 2008 Gas Years 2011/12 to 2015/16

Current Arrangements (Mod 0090) Any increase or decrease in Supply Point Capacity is covered by UNC TPD Section G 6.1.6 Any increased Capacity is deemed to be Firm Capacity (F) Proposal 0215 does not seek to change this More Complex arrangements for any decrease in Capacity Proposal 0215 seeks to make these arrangements more flexible for all parties involved

Current Arrangements (Mod 0090) Overall Interruption Price (OIP) The total amount payable by the DNO based on a fully exercised annual contract (Option & Exercise Price) in p/kWh/Day Interruptible Tranche (Tn) A portion of Supply Point Capacity (in kWh/Day) (up to 100%) designated as Interruptible Maximum number of Tranches per Supply Point in any Interruptible Period (Gas Year) is 9 (T1, T2 , …. , T9)

Capacity Reductions (Mod 0090) Ranking The Interruptible Tranches at a Supply Point are ranked in order of OIP, highest first Example 4 Interruptible Tranches (T1, T2, T3 & T4) All equal to 20% of SP SOQ Firm Capacity (F) equal to 20% 20% : 80% split of Firm and Interruptible Capacity

Capacity Reductions T4 T3 T2 T1 F Ranking T1 OIP = 0.05 p/kWh/Day Firm has OIP = 0.0 p/kWh/Day (SP SOQ) T4 T3 T2 T1 F

Capacity Reductions T1 T2 T3 T4 F 40% SOQ Reduction Tranches T1 & T2 extinguished T3 & T4 both equal 33.3% Firm Capacity equal 33.3% Moved from 20:80 to 33:67 Consistent with site capabilities? (SP SOQ) T1 T2 T3 T4 F

Capacity Reductions T1 T2 T3 T4 F 50% SOQ Reduction Tranches T1 & T2 extinguished If remainder of T3 is < MIA T3 becomes Firm Capacity (60%) If remainder of T3 is > MIA T3 remains at reduced level Firm Capacity equals 40% Significant impact on F:I split (SP SOQ) T1 T2 T3 T4 F

Reduction of inflated SOQ SOQ is 2 times actual 50% SOQ Reduction Tranche extinguished Site becomes 100% Firm (SP SOQ) T1 F

Mod 0215 Proposal Current Arrangements remain as default Ability for reduced Capacity to be taken from: Interruptible Tranche(s) (Tn) Firm Capacity Both Only on Agreement from User and DNO, else default applies

Advantages Greater flexibility for all Parties End Consumer / User Ability to retain Firm : Interruptible split that reflects actual capabilities Distribution Network Operator Ability to retain Interruptible Capacity in a Interruption Zone Future constraints / demand Satisfy overall Interruption Zone requirements

Disadvantages None

Simon Trivella – 22nd May 2008 Distribution Workstream UNC Modification 0215 - Enduring Arrangements for Supply Point Capacity decrease at an Interruptible Supply Point Simon Trivella – 22nd May 2008 Distribution Workstream