PFOS/PFOA Off-Base Drinking Water Impacts

Slides:



Advertisements
Similar presentations
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Chemical Analysis of Water
1 Midland Community Meeting Michigan Department of Environmental Quality Steven Chester, Director Jim Sygo, Deputy Director.
1 BoRit Asbestos & The Superfund Process Stacie Peterson, Remedial Project Manager (RPM)
BoRit Superfund Site Timeline
U.S. Environmental Protection Agency Lovers Lane Lead Site Jeffrey A. Lippert, OSC.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
MONDAY MAY 7,  Pump tests – Districts G, H, and NRHS  Quantity and quality of water  All required well source permitting for up to 1 MGD from.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Given Connections Solution
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Former DuPont Barksdale Works Project Update June 07, 2006 Great Lakes Visitors Center DuPont CRG.
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
ENGINEERS WITHOUT BORDERS USA ALAMO PROFESSIONAL CHAPTER.
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
HARTFORD | STAMFORD | WASHINGTON, DC | GREENWICH | LAKEVILLE Connecticut Association of Water Pollution Control Authorities, Inc.
Source Water Protection Management Strategies for Source Water Protection Plan’s Implementation Contact Information: Lisa Vollbrecht City of St. Cloud.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
The Role of Groundwater Sampling/Monitoring COGCC Proposed Rule 609 University of Colorado Law School Nov 26, 2012.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Site Completion Preliminary Assessment Site Inspection Remedial Investigation Feasibility Study Remedial Design Remedial Action LTRA O&M Site Identified.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
1 NSW Environment Protection Authority (EPA) Carmen Dwyer Director Gas Implementation.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Cris Koutsougeras Advisor: Edward Rode.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
Erin James Virginia Tech Biological Systems Engineering Virginia Master Well Owner Network Training October 29-30, 2008 Harrisonburg Virginia Virginia.
Organization Name Presenter Name Presenter Title.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Superfund Process National Priorities List (NPL) Procedures.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Pre Commercial Procurement Trenchless house connections to main water lines.
GOALS, OBJECTIVES, STRATEGIES Missouri Department of Health and Senior Services.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Nutrients and the Next Generation of Conservation Presented by: Tom Porta, P.E. Deputy Administrator Nevada Division of Environmental Protection President,
Unity Ground Water Investigation Steve Faryan, USEPA.
DOD P2 WATERSHED ADVISORY BOARD
Proposed Plan for No Further Action
Outline Background on Lead in Drinking Water How Lead is Regulated
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Pending EPA Health Advisory for PFOA and PFOS
Chromium 6 Regulation Corrective Action Plan October 6, 2015
THE SUPERFUND PROCESS Assessment and Listing
Downtown Strategic Parking Management Plan
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
Town of Bedford PFOA Water Contamination Study Areas
Kentucky Lead Workgroup Recommendations
Appendix C New Administration General Assembly Session
By: Paola,Madi,Ahnesti,& Elizabeth
Professional & Scientific Council Update
BUSINESS OWNER MEETING
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Evaluation of the marketing standards framework for fishery and aquaculture products Presentation to the Market Advisory Council 23 May 2018 Brussels.
Perchlorate Issues at the Massachusetts Military Reservation (MMR) and the Aberdeen Proving Ground (APG) 9th Annual Joint Services Environmental Management.
Implementation Challenges
Patrick Roach Robert Arena ET-493 Fall 2014 Advisor: Rudolph Rode
Fayetteville, NC August 14, 2018
PFAS Background and Action Plan
Multi-Family Fourplex Apartment
Essential Freshwater.
Indiana Finance Authority (IFA)
Per- and Polyfluoroalkyl Substances (PFAS)
Presentation transcript:

PFOS/PFOA Off-Base Drinking Water Impacts Ms. Melody Jensen AFCEC/CZOM 11 December 2018

Overview PFOS/PFOA Timeline at Ellsworth AFB Off-Base Drinking Water Well Sampling Future plans

PFC Timeline at Ellsworth 2011 - PFCs detected at the (FT001) as part of Broad Agency Announcement 2013 - Remedial Investigation (RI) Funded 2014 - Limited Site Investigation (SI) Completed at 6 Sites 2015 - Preliminary Assessment Completed 2016 - Stage 1 Fieldwork for the RI Completed 2016 - EPA established lifetime Health Advisory drinking water for PFOA/PFOA of 70 ppt 2016 - Off-Base Private Well Identified & Sampled 2016 - Alternate Water Supply Provided to Impacted Landowners 2018 - Stage 2 Fieldwork for the RI Completed 2018 - SI Fieldwork Completed 2018 - Off-Base Private Drinking Water Well Survey /Sampling Future - Stage 3 Fieldwork & Complete RI

Off-Base Drinking Water Well Sampling Private well sampled in 2016 (99 ppt) and again in 2017 (182 ppt) Connected 2 impacted properties to alternate water source Off-Base Door to Door Private Well Survey/Sampling Phase 1: 18 Sept 2018 – 24 wells sampled 12 Drinking water wells (9 above EPA Lifetime Health Advisory) 10 Irrigation wells (8 above EPA LHA) Phase 2: 29 Oct 2018 – 27 Drinking water wells sampled 2 Wells above EPA LHA Phase 3: 29 Nov 2018 – 16 wells sampled 10 Drinking water wells (4 above EPA LHA) 6 Irrigation wells (2 above EPA/LHA) Alternate Water provided to properties above EPA LHA

Off-Base Drinking Water Well Sampling

Future Plans Finalize the PFOS/PFOA Remedial Investigation for site FT001 Continue to identify and sample off-base drinking water wells for PFOS/PFOA using the 3-Ps Proximity Probability Pathway Continue to provide alternate water to impacted properties Provide bottled water until permanent solutions are implemented Work with property owners to design/install treatment systems (reverse osmosis) on drinking water wells Connect properties to municipal water system if available Work with municipal water systems to expand service area or capacity if feasible

Contact Information Melody Jensen AFCEC/CZOM 2125 Scott Dr Ellsworth AFB 57706 605-385-2677 Melody.jensen.1@us.af.mil