Westminster House, The Wells Road Centre, Nottingham

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 5.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
Fire Prevention and Safety Health Science Class. Rationale: Fires may occur at any time, as a result of overloading wiring, smoking, improper chemical.
FIRE PREVENTION AND SAFETY PRACTICES Health Science.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Construction (Design and Management Regulations) 1994
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Annual Report 2004/05 Presented by: Russell Smith Estates.
Executive Report Keith Lilley Director of Facilities Management.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
Health Facilities Planning Seminar Plan Review Division Irvin J. Poke, AIA, Chief Todd Y. Cordill, NCARB, Assistant Chief Providing for Michigan’s Safety.
Schools (2/2) March 22 nd Context Administration facilities Staff facilities Safety and security measures.
Building Codes and Interior Design
Women’s and Children’s Development. Why Needed?  Children’s wards older than the NHS!  Safety issues: location of SCBU from children’s wards  Privacy.
TO LET Various Suites of Offices to the rear: 35/37 Victoria Road East Thornton-Cleveleys Lancs, FY5 5BU INDIVIDUAL OFFICE SUITES AVAILABLE FROM £30 PER.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
Easter Bush Update December The New Teaching Building 12,500 square meters on three floor providing accommodation for up to 850 students and 200.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Holland High School Construction Update June 8, 2011.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
Communities Fire Safety Report following consultation with Housing Providers 25 th January 2010.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
1 Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Cardiff Royal Infirmary (CRI) – Health and Wellbeing Centre
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Who Decides? Do other people make decisions for you?
Highveld Industrial Park Office Block ‘’E’’ Information Memorandum
Site Based Preconstruction – Site Set Up
Sapphire FULL BUILD & REFURBISHMENTS
Clydebank Town Centre Office.
ScotRail Alliance Performance Improvement Alliance
QMC Nottingham - Refurbishment works to Wards A23 & B50
Electrical Receptacle Testing
14 High Leys Drive, Ravenshead, NG15 9HQ
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
Sapphire FULL BUILD & REFURBISHMENTS
2007 Bond Issue Capital Improvement Program
Fire Prevention and Safety
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
Understanding Construction Codes
The Acorn Medical Practice, Wood Street, Mansfield
KOMPLEX Investors Report – Q
Value of contract: Length of contract: Contract start date:
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
105 Indiana Administrative Code Article 13
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
The Paterson Redevelopment
Earls Terrace, London W8 Clients core business
Value of contract: Length of contract: Contract start date:
Presentation transcript:

Westminster House, The Wells Road Centre, Nottingham Value of contract: Length of contract: Contract start date: Completion date: £250,000 6 months March 2014 September 2014 Works/services provided: Extensive Asbestos removal Kitchen and washroom installation Strip out & Demolition Hard and Soft Flooring Heating, Ventilation & Cooling Data cabling & ‘Staff Attack’ alarms Electrical & Lighting installation Access controls Detailed description of contract: An administration building for psychiatric healthcare extensive alteration and refurbishment works were carried out on both ground floor and first floor levels; Identification and controlled removal of Asbestos containing materials, forming of new toilet, kitchen and office accommodation. Extensive alteration to existing M&E installations. Installation of a sliding/folding partition to the existing first floor meeting room. Works were completed in two phases to maintain staff facilities throughout the construction period whilst implementing control measures to protect users of the building. Particular challenges to be overcome: Contact details: Liaising with administrational & clinical staff to maintain public services Programming ‘Out of hours’ works to maintain daily use of the main entrance Strictly manage specific access/egress route through the building for delivery and disposal of materials to minimise interaction with staff, patients and the general public and therefore reducing there inherent risk to health & safety Nottinghamshire Healthcare NHS Trust The Wells Road Centre The Wells Road Nottingham. NG3 3AA Tel: 0115 9691300