Information Lesson KBT 2.1

Slides:



Advertisements
Similar presentations
Working Around/Under Loads
Advertisements

General Safety Overview and Information
Erecting steel structures Setting up or dismantling cranes or hoists
My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
Common workplace hazards
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
University of Wisconsin Eau Claire By: Chaizong Lor
Cranes and Slings Major Causes of Crane Accidents
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
Dry Top Lift Trailer. 2 Top Lift (At Rest, Front)
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
OSHA Office of Training & Education
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
OSHAX.org - The Unofficial Guide To the OSHA
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
Crane Operations Objective
Crane Safety, Subpart N
Cranes, Hoists and Truck Hoists
Hydraulic Crane Safety. Hydraulic Cranes Can be stationary or attached to trucks, trains and boats Can be stationary or attached to trucks, trains and.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
Excavating and Lifting Part 3
Backing & Spotter Safety
NWACC Business & Industry Workforce Development Institute N - 1 OSHA 29CFR FORKLIFT SAFETY OSHA TRAINING.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
EZ Reach 40 Training & Procedure Manual. Unit Capacity One of the most important considerations when operating this machine is the Bucket Capacity of.
310 Series Basic Leveling Procedure
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
HOT-LOADING SAFETY TRAINING FOR THE NEPTUNE BAE 146.
Procedure for use of Zarges ZAP scaffold (Revision 0 – 5 th April 2011) Toolbox talk.
Accidents Case Studies
Warehousing and Storage Principles Session 7 – Fully Loaded Day 4 / AM.
Dangers Posed by Vehicle Loading Cranes Demonstrate the Need for Proper Crane Training.
Outline of Crane Operator Training For BMRC Labournet.
URW295C4URS (Tracked, Diesel)SPYDERCRANE Capabilities.
Setting up Today’s Advanced Cranes Introduction Just because a crane is mobile doesn’t mean you can lift loads anywhere. Where and how you set up a crane.
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Louisiana State University Radiation Safety Office
Topic 1.7 Aircraft Salvage Procedures
Working Around/Under Loads
Hand Signals for Crane Operations.
UC Davis R. A. Wachter Safety Services
Who is Responsible for Overhead Crane and Hoist Operations
Lorry Loader and Small Hydraulic Cranes Operator Skills
FlowArm PLTW Motions Computer Integrated Manufacturing
Lifting & Rigging Continuing Education Fourth Quarter 2016
DESCRIPTION AND GUIDE TO OPERATIONS
SAFE WORK INSTRUCTIONS
Overhead and mobile crane safety
Cranes.
Click anywhere to get started…
MASATS Door Systems.
Click anywhere to get started…
On-Board Safety Systems
The Crane Control Group
Lifting With Your SPYDERCRANE KBT 5.4
The Turnover Prevention Device
Using the Boom Angle Indicator
Characteristics and Capabilities of the 095-/200-Series SPYDERCRANE
Deploying Your SPYDERCRANE's Outriggers​
Warning and Informational Decals
Using the Rated Load Chart
Understanding Variable-Geometry Outriggers
Understanding the BSOC Flow​
SAFETY STANDARDS FINAL JEOPARDY
Pre-Deploying Your SPYDERCRANE's Outriggers​
Cranes and Hoists Standard 29 CFR Part
FIGURE 18–1 A visual inspection on this battery shows the electrolyte level was below the plates in all cells.
Isolation Procedure Topic 2, Unit 6.
Presentation transcript:

Information Lesson KBT 2.1 Manuals and Guides Information Lesson KBT 2.1

Learning Objective(s) These are the desired learning objectives for this topic. Once you have completed this lesson, you should be able to: Identify and summarize the WARNING DECALS posted on the SPYDERCRANE Explain the purpose and associated dangers with using the TURNOVER PREVENTION DEVICE ZERO-RESET INFORMATIONAL DECAL Point out and identify the LOAD CHART(S) on the carrier of the SPYDERCRANE Point out and identify the WORKING RANGE CHART(S) on the carrier of the SPYDERCRANE Point out and identify the TRAVEL LIMIT INFORMATION DECALS on the SPYDERCRANE Point out and identify the SLING INFORMATION DECALS on the SPYDERCRANE Point out and identify the PRIMARY/SECONDARY POWER-PLANT INFORMATION DECALS on the SPYDERCRANE Point out and identify the OUTRIGGER DEPLOYMENT INFORMATIONAL DECALS on the carrier of the SPYDERCRANE Explain the meaning of the PROHIBIT WASHING DECALS

Reference Locations Micro-Crawlers are traveled (propelled under their own power) from the REAR REAR FRONT The side of the Micro-Crawler where the hook is stowed is the FRONT ROADSIDE CURBSIDE When standing at the rear, the side of the Micro-Crawler on your right side is the CURBSIDE To avoid confusion, we use specific terms to refer to locations on the carrier and the upperworks of the SPYDERCRANE. SPYDERCRANE Micro-Crawlers are traveled, or propelled under their own power, from the rear where the Travel Control Group is located. The opposite side of the Micro-Crawler, where the stowed boom tip and hook are located, is the front. If you are standing at the rear then the SPYDERCRANE’s curbside is on your right while the roadside is on your left. The opposite side is the ROADSIDE

Informational Decals CURBSIDE Decals that provide operational information Remote Control Procedures (on carrier) Mobile Crane Signal Chart (on storage box) Code Indicator Legend (on carrier) Fuel Shut-Off Valve Diagram (on carrier) Emergency Outrigger Operation (on carrier) Informational decals provide guidance for a specific system or procedures for accomplishing a specific task. On the curbside of the SPYDERCRANE you will find the following decals for: Setting up and using the remote controller The procedures for deploying/re-deploying the outriggers in Emergency Mode The legend for some of the error codes that are generated by the Crane Management Unit and displayed on the Code Indicator The hand signal chart for crane operations, which is posted on the Storage Box If you are using a gasoline/propane-powered SPYDERCRANE you will also see the Fuel Shutoff Valve Diagram on the curbside carrier CURBSIDE

Warning Decals CURBSIDE Decals that warn, or provide critical safety information Foot Crush Warning (on each outrigger) Warning Decals are used to identify especially dangerous conditions that you MUST avoid. On the curbside, you will see foot crush warnings posted on the bottom of each Lower Outrigger; these warning are also posted on the roadside outriggers. CURBSIDE

Informational Decals REAR Decals that provide operational information Gas/Propane Switch Procedures (on boom) Track Control Base Positions (on boom turret) Vehicle Data Plate (on boom turret) At the rear of the SPYDERCRANE, you will see a large decal that shows the different position settings for the Track Control Base. Below that decal is the Vehicle Data Plate. The Vehicle Data Plate contains information specific to that SPYDERCRANE, including its serial number. If you are using a gas/propane-powered 095-/200-Series, the large decal on the back of the boom explains how to switch from gasoline to propane fuel. REAR

Traveling-on-Grade Warning Warning Decals Decals that warn, or provide critical safety information Travel Limits (on Outrigger #2) Traveling-on-Grade Warning (on boom) On the back of Outrigger #2 is a small decal listing the travel limits of the SPYDERCRANE. There is another warning decal on the top of the boom that details the maximum grade limits of your SPYDERCRANE. REAR

Informational Decals FRONT Decals that provide operational information Prohibited Areas of Operations (on carrier) Max-Ext Outriggers Posture and Procedures (on carrier) On the front of the Micro-Crawler are the following informational decals: When deploying the outriggers using a NON-OPTIMUM DEPLOYMENT PATTERN, PROHIBITED ZONES are created; this chart lists the eight most common Non-Optimum Deployment Patterns and the resulting Prohibited Zones The procedures for, and visual depiction of, pre-deploying the outriggers into the MAXIMUM-EXTENDED (MAX-EXT) DEPLOYMENT STATE FRONT

Electrocution Hazard (Overhead) Warning Decals Decals that warn, or provide critical safety information Electrocution Hazard (Overhead) (on carrier) On the front of the SPYDERCRANE’s carrier is an electrocution warning for overhead power lines. FRONT

Informational Decals ROADSIDE Sling-for Hoisting Decals that provide operational information Sling-for Hoisting (on Outriggers #1 and #4) Turnover Prevention Device Zero-Reset Procedures (on carrier) Boom Angle Indicator (on boom) 110V Battery Charging Instructions (110V battery-powered SPYDERCRANEs) Turnover Prevention Device General Procedures (on carrier) On the roadside of the Micro-Crawler are the following informational decals: The Turnover Prevention Device general procedures The Turnover Prevention Device Zero-Reset Procedures We will cover the TPD Zero Reset procedures in a later lesson, but, for now the most important to understand is that you should NEVER command a Zero Reset when the SPYDERCRANE is deployed. The Sling-for-Hoisting instructions are posted on Outriggers #1 and #4 The Boom Angle Indicator If you are using a Battery/Electric 095-/200-Series SPYDERCRANE, the Battery Charging Instructions and Warnings. ROADSIDE

Informational Decals TOP Decals that provide operational information Working Range Chart (on carrier) Rated Load Chart (on carrier) Rated Load Definition (on carrier) On the top of the Micro-Crawler’s carrier (at the front) are the following informational decals: The Rated Load Definition Decal The Rated Load Chart The Working Range Chart TOP

Warning Decals Decals that warn, or provide critical safety information Read-the-Manual Warning (on carrier) Deploy-the-Outriggers Warning (on carrier) Prohibit Washing Warning (on carrier) On the top of the Micro-Crawler are the following warning decals: The Read-the-manual Warning Decal The warning that outriggers must be deployed before the SPYDERCRANE can be used for lifting. And several “prohibit washing” decals; these decals simply warn against using a pressure washer to spray inside of the carrier’s sheet-metal panels; the SPYDERCRANE itself can be washed like an other piece of heavy machinery. TOP

Summary The major learning points that each student should take away from this topic: WARNING DECALS identify especially dangerous conditions that MUST be understood and avoided The TURNOVER PREVENTION DEVICE ZERO-RESET INFORMATIONAL DECAL is used to designate the TPD ZERO RESET BUTTON, which should NEVER be used when the SPYDERCRANE is deployed The LOAD CHARTS and WORKING RANGE CHARTS are always located on the carrier of the SPYDERCRANE, within the operator’s line-of-sight The TRAVEL LIMIT WARNING DECALS are placed at the aft-end of the SPYDERCRANE within line-of-sight of the operator when using the TRAVEL CONTROL GROUP The SLING INFORMATION DECALS are posted on Outriggers #1 and #4 If equipped with a SECONDARY POWER PLANT, the INFORMATIONAL DECALS are posted at the rear of the boom (for Propane), or at the front of the carrier (for 220V Electrical) The major takeaways for this topic are: Warning Decals identify especially dangerous conditions that MUST be understood and avoided. While it is important to know where the Turnover Prevention Device Informational Decal is located, it is even more important to understand that you MUST never command a zero-reset when the SPYDERCRANE is deployed. The Travel Limit Warning and Informational Decals are posted on the top of the boom and on the back of Outrigger #3, within your line-of-sight when you are at the Travel Control Group. The information for slinging the SPYDERCRANE for hoisting is posted on Outriggers #1 and #4. If you SPYDERCRANE is equipped with a secondary powerplant, you can find the informational decals for the secondary powerplant posted near, or on, them. Information for deploying your SPYDERCRANE are posted on the carrier front, near the Outrigger Control Group. You will see Prohibit Washing decals posted on the front of the carrier, near the access ports; these decals are ther to warn you from using a pressure washer on the inside of the carrier’s sheet-metal panels. The DEPLOYMENT INFORMATION DECALS are posted on the carrier, near the OUTRIGGER CONTROL GROUP The PROHIBIT WASHING DECALS only mean that you be careful not to spray the interior of the carrier with a pressure washer

Learning Objective(s) The desired learning objective for this Lesson Topic is for each student to… Identify and summarize the WARNING DECALS posted on the SPYDERCRANE Explain the purpose and associated dangers with using the TURNOVER PREVENTION DEVICE ZERO-RESET INFORMATIONAL DECAL Point out and identify the LOAD CHART(S) on the carrier of the SPYDERCRANE Point out and identify the WORKING RANGE CHART(S) on the carrier of the SPYDERCRANE Point out and identify the TRAVEL LIMIT INFORMATION DECALS on the SPYDERCRANE Point out and identify the SLING INFORMATION DECALS on the SPYDERCRANE This concludes Segment Topic 2.1, these are the DLOs you should be able to complete. Point out and identify the PRIMARY/SECONDARY POWER-PLANT INFORMATION DECALS on the SPYDERCRANE Point out and identify the OUTRIGGER DEPLOYMENT INFORMATIONAL DECALS on the carrier of the SPYDERCRANE Explain the meaning of the PROHIBIT WASHING DECALS