Critical Infrastructure Protection Committee

Slides:



Advertisements
Similar presentations
NERC Cyber Security Standards Pre-Ballot Review. Background Presidents Commission on Critical Infrastructure Protection PDD-63 SMD NOPR NERC Urgent Action.
Advertisements

Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
NERC Critical Infrastructure Protection Advisory Group (CIP AG) Electric Industry Initiatives Reducing Vulnerability To Terrorism.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
CIP Cyber Security – Security Management Controls
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Editing, Peer-Reviewing and Team-Writing Editing isn’t a cosmetic process. It’s a thinking process. Richard Rhodes, author Making of the Atomic Bomb.
Update: Physical Guideline UPDATE: Physical Security Guideline UPDATED Physical Response Security Guideline Public Release.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
New Grants Model Document Retention 1 District 5240 Grants Document Retention District Assembly /6/2013.
Security Guidelines Working Group Update CIPC Meeting Phoenix, AZ Mar 16, 2006 Seiki Harada SGWG Chair CIPC Confidentiality: Public Release.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
1 Crisis Response Task Force (CRTF) Proposal Tom Bowe (Chairman) CSO, PJM Interconnection Scott Heffentrager (Temp. Chairman) Physical Security.
The Global Fund - Proposal Process & Round 8 February 19, 2008.
Project – Alignment of Terms WECC Joint Meeting July 15, 2015.
Standards Review Subcommittee Update August 17, 2010.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Standards and Guidelines Working Group Status Updates 2005 Jun 09 Washington DC Critical Infrastructure Protection Committee Public Release.
CIPC Executive Committee Update-1 CIPC Meeting Long Beach CA March 17, 2005 Pat Laird Vice Chair Public Release.
Security Guidelines Working Group Update CIPC Meeting Denver CO September 29, 2005 Seiki Harada SGWG Chair Public Release.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
1 Presented by David Thompson, TIA December 14, 2005 NFPA 1600 and Emergency Communications.
TASOR TF Report to TAC Dec. 4, 2008.
PPIS TRAINING 2017.
Computerized Systems in Clinical Research
Commercial Operations Sub-Committee Update to TAC
Report by the VICH Steering Committee on issues raised by Forum members during the 1st Outreach Forum meeting Hervé Marion, DVM VICH Secretariat.
Flooding Walkdown Guidance
Outcome TFCS-11// February Washington DC
How does a Requirements Package Vary from Project to Project?
Status report on the activities of TF-CS/OTA
Standards and Certification Training
NERC Cyber Security Standards Pre-Ballot Review
Outcome TFCS-11// February Washington DC
CIPC Outreach WG Update March 2006
CIPC Relationships & Roles
PPIS TRAINING 2017.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Use of Industry Connections in IEEE 802
Role for Electric Sector in Critical Infrastructure Protection R&D
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
CIPC Executive Committee Update-1
Security Guidelines Working Group Update
CIPC Executive Committee Update
Specification on float equipment
Progress Report on proposed GUID on Information System Security Audit
Department of Environmental Quality
CSSWG Status Report March 17-18, 2005 CIPC Meeting Long Beach, CA
The Electric Reliability Organization: Getting from here to there.
Digital Stewardship Curriculum
Project Management Process Groups
NERC Critical Infrastructure Protection Committee (CIPC) Executive Committee Public Release 29 September 2005.
SRS TRAINING 2017.
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Group Meeting Ming Hong Tsai Date :
NERC Reliability Standards Development Plan
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
UPDATE: Physical Security Guideline
Crisis Response Task Force (CRTF) Proposal
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Security Guidelines Working Group Update
CIPC Executive Committee Report-2
NERC Reliability Standards Development Plan
AHT Title Goes Here Name (s), Organization, CEOS Affiliation
What is a CA document? Date: Authors: March 2005 March 2005
The Revised Common Rule
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Standards Development Process
NERC Planning Committee Update
Standards Review Subcommittee Update
Presentation transcript:

Critical Infrastructure Protection Committee Public Release Standards and Guidelines Working Group Status Updates 2005 Jun 09 Washington DC

Update Items As of 2005 Jun 09 Subject Area: Min: 1 SGWG Objectives for 2005/2006 - Confirmation 5 2 SGWG Process Flow and Decision Making 3 Review of CIPC Document Types 10 4 SAC Standard Documents and CIPC Document Types Guideline Template & Usage Guide 6 Accumulation and Handling of Comments for the Next Round of Guideline Updates 7 Status of Guideline Reviews and Updates

SGWG Objectives for 2005/2006 Secure endorsement for the standard document shell for CIPC guidelines Identify CIPC document types and define as to purpose, application rules, relationships with other documents Review existing guidelines and recommend for updating or discontinuance Recommend streamlining of reviewing and approving CIPC guidelines On-going reviews of guidelines and other documents

SGWG Document Review Process Flow

SGWG Main Function: Provide standard format for CIPC documents. Review DRAFTS for: Standard Components Consistency References Tone of language Will stay away from value judgment on the content. That will be left with the drafting teams.

Potential CIPC Document Types for SGWG Reviews Example: SGWG Review: 1 Policies Spare Equipmt Database (SED) ?? 2 Standards CIP 001 to CIP 009 No. 3 Guidelines Risk Assessment Guidelines Format only 4 FAQs FAQ Cyber Security DRAFT #3 No? 5 Glossary of Terms BES (Bulk Electric System) Scan existing when shifted 6 Procedure SED Usage Procedure Format only? 7 Reference (or White Paper) Risk Assessment Methodologies

SGWG Review of White/Reference Papers RAWG has produced a White Paper on Risk Assessment Methodologies Discussion Points: Does SGWG need to review White Papers and reference documents, or do SGWG members join the general CIPC members in providing comments? If SGWG did, what value can SGWG add? SGWG Consensus: SGWG will not get involved in the reviews of White papers. However, it may act as an unofficial proof reader.

SAC Document Types and CIPC Guidelines SAC announced a list of supporting documents that support “Standards”: Standard Reference Standard Supplement Procedure Practice Training Reference Technical Reference White Paper Discussion Points: There is no such document as ‘guidelines’ CIPC has guidelines without supporting standards. Does NERC recognize “guidelines”?

The Guideline Template Refer to the two Word documents: “Guideline Template” “Usage Guide” Discussion Points: Document ID for Guidelines Preamble (See next foil) Guideline Statement and Guideline Details Definitions (treat Global and Local differently) Certified Products (eliminated) Exceptions (eliminated)

Review of the Guideline Template Preamble: “ This Guideline addresses potential risks that can apply to some Electricity Sector Organizations and provides practices that can help mitigate the risks. Each organization decides the risk it can accept and the practices it deems appropriate to manage its risk.” Why the capitalization?

The Guideline Template Usage Guide Usage Guide provides a description of: What information to provide in which section of a CIPC guideline What tone of language to use Decision Requested: CIPC approve the: Guideline Template Template Usage Guide

Status of Document Reviews SGWG members reviewing existing guidelines: Reviewed 10 guidelines in March 2005 5 more being reviewed Discussion Points: Most of the reviewed guidelines need updating and are being assigned to the originating team or individuals.

Accumulation of Guideline Comments: A CIPC member asked what to do with the comments he or she might come up in between document update cycles. SGWG Consensus: SGWG recommends these comments be sent to the SGWG Chair who will identify the working/task team/individual responsible for the document, pass on the comment, and let the comment originator know.

Reviews of the Recent Document DRAFTS: SGWG Review comments passed to the drafters of: Threat Alert System and Physical Response Guidelines for the Electric Sector - V 3.0 Vulnerability and Risk Assessment V2 - Guideline Spare Equipment Database Usage Guide - Procedure