Update to Unit Under Test Process

Slides:



Advertisements
Similar presentations
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
Advertisements

1 Loss Adjustment When Exporting Mod 24_11 Reflection of Physical Fixity of Interconnector Flows in Operational Data Transactions hen Exporting Modifications.
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
DRAFT Request for Initiation of a NAESB Standard NAESB OS Oct 23-24, 2013 Richmond, VA.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Unit Registration Process Improvement SEMO 05/12/2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING Modification Development 5 April 2011.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
T&SC Modification Proposal: Clarification of Outturn Availability
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Project Update and Summary of Project Priority List (PPL) Activity
DSC Change Committee UK Link Future Releases Proposed Approach
Protocol Revision Subcommittee
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Commercial Operations Sub-Committee Update to TAC
MOD_10_13 Remove the requirement on the SOs to sent certain Dispatch Instructions for Pumped Storage Units to MO.
MOD_04_17 Solar in the SEM 9th June 2017.
Grid Code Development Forum – 6 September 2017
ESB Networks AIP Programme
Holistic view of Charging Modifications – In flight 11th June 2018
Five-Minute Settlement Program: Executive Forum 1
Update on European Network Codes
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
Capacity Market Code Committee Meeting
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Agreed Procedure Updates
Assignment Workshop 2 16th September 09, Solihull.
Changes to Reserve Level Declaration Guidelines
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
MOD_19_18 Part B Housekeeping 1 21st June 2018.
MOD_23_18 Payment and Invoice Day Exchange Rates for Part A Currency Cost Calculations Post Cutover 16th August 2018.
MOD_04_18 Reporting and Publication for Operational Schedules, Dispatch Instructions, Forecast Availability and SO Trades 13th March 2018.
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Demand Side Units in the SEM
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Interim Suspension Delay Periods
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
Modification to Part B Agreed Procedure 17
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
MOD_13_17 V2 Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities 13th March 2018.
Mod_37_18 Housekeeping 12th December 2018.
Capacity Market Code Committee Meeting
Agreed Procedure Updates Version 2
Summary Issue Modification Aim Effect of the mod Impacts
Outage Adjusted Wind and Solar Forecast Reports
Mod_21_18v2 Application of Settlement Reallocation Agreements to Market Operator Charges 16th August 2018.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Capacity Market Code Modifications
Correction to No Load Cost - “and” vs “or”
Capacity Market Code Modifications
Mod_10_19 Removal of Negative QBOAs Related to Dispatchable Priority Dispatch Units from the Imbalance Price 27th June 2019.
DSG Governance Group Recommendations.
Correction to COP and clarification to CNLR
Presentation transcript:

Update to Unit Under Test Process Mod_33_18 Update to Unit Under Test Process

Learning Objectives Overview Unit Under Test Process in TSC does not accurately reflect actual process, as a result of changes over time and particularly as a result of I-SEM Testing Tariffs have changed significantly post I-SEM: Only tariff for high impact testing Assumed balance responsibility will cover energy costs Only unit commitment and costs associated with reserve https://www.semcommittee.com/news-centre/i-sem-portion-2018-testing-tariffs-decision-paper Mod needed to ensure TSC accurately details process

Learning Objectives Summary Information Mod_33_18 raised November 2018. Proposed to remove reference of MO. Process for acceptance/rejection of test flags is now fully driven by SO. Proposal to remove unit under test notice from the Glossary and throughout T&SC as replaced by Under Test Flag submitted in PNs. Clarification in Appendix F that SO will confirm to the MO the units and relevant dates where testing tariffs are to be applied.

Legal Drafting Changes (D.7.3)

Legal Drafting Changes (D.7.3) Proposed: The System Operator may grant

Glossary Changes

Changes to Appendix F: Other Communications

Changes to AP04: Transaction Submission and validation Procedural steps 3.1 for Submission, approval and rejection of a Unit Under Test Request modified Removes reference to MO Includes reference to PNs Details rejection of PNs Refers to Grid Code.

Links http://www.soni.ltd.uk/media/documents/181008_Unit-Under-Test_Guidelines-for-I-SEM.pdf http://www.eirgridgroup.com/site-files/library/EirGrid/181008_Unit-Under-Test_Guidelines-for-I-SEM.pdf http://www.eirgridgroup.com/site-files/library/EirGrid/1819-Proposed-GTUoS-Tariffs-v0.1.pdf

neartime@eirgrid.com neartime@soni.ltd.uk Near Time Operations Contact Information neartime@eirgrid.com neartime@soni.ltd.uk

Unit Under Test in I-SEM A single Under Test mechanism for I-SEM, with changes including: All testing visible to the market All Unit types follow the same process* Testing can be requested by trading periods Modified timelines for submissions Participants will be able to submit Commercial Offer Data *A separate process will be developed for managing Interconnectors Under Test and priority dispatch units which are not dispatchable-Wind and Solar. Pumped Storage Units, Demand Side Units, Interconnector Units, Interconnector Residual Capacity Units or Autonomous Generator Units have Unit Under Test status in ISEM

Types of Testing For the purpose of under test PN submissions, testing can be categorised as follows: 1. Significant Testing: Including commissioning new or existing units, Grid Code testing, testing following modifications to control systems or any tests that propose an additional risk of trip. Can be high impact test or low impact test. Greater than or equal to 3 hours, 3 times the active energy(of the unit registered capacity in 1 hr production 2. Minor Testing: Any testing that does not pose an increased risk of trip. Can be high impact or low impact. Must be less than 6 hours or 3 times active energy of the unit or 500MWhr.

Justification and Implications of not Implementing This proposal is required to clarify testing in new I-SEM market If this proposal is not implemented the Code will be technically incorrect

Ongoing Reduction in Testing Tariffs