Redefinition of Schedule Production Cost

Slides:



Advertisements
Similar presentations
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Advertisements

MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
1 Mod_24_10 Introducing Loss of Profits as a Relevant Damage within the Limitation of Liability Provisions.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Modification Proposal Mod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
INTRA-DAY TRADING Modification Development 5 April 2011.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
T&SC Modification Proposal: Clarification of Outturn Availability
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
CMTF Tariff Language Clarification 1. Parking Lot Question Is the Planning Reserve Margin requirement meant to be maintained throughout the whole calendar.
Resource Cost Working Group
Grant Funding Workshop
Dispute Resolution Between ICT Service Providers in Saudi Arabia
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Distribution Workgroup 24/11/16
CGR2 Summary Proposals UNC Panel 18 October 2012.
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Transmission Workgroup – 1st December 2011
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate.
UNC Modification – Non Effective Days
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Review of the requirements regarding Unsecured Bad Debt within I-SEM
Update to Unit Under Test Process
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Ex Ante Quantities Deferral
MOD_27_18 Martin Kerin 06th September 2018
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Definition of “Day 2 Deployment Date” Mod-11-17
Interim Suspension Delay Periods
Mod_34_18 Removal of Make-Whole Payments for biased quantities and negative imbalance revenue, and small clarifications to determination of Start Up Costs.
Capacity Market Code Modifications
Imbalance Price Modifications
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
MOD_13_17 V2 Deferral of SEM NEMO Credit Reports and Non-acceptance of Contracted Quantities 13th March 2018.
Determining Marginal Energy Action Prices Modification Proposal
Capacity Market Code Modifications
Summary Issue Modification Aim Effect of the mod Impacts
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Options for the Development of a Demand Side Response Mechanism
Generic Revenue Driver Methodology
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Imbalance Price Modifications
Capacity Market Code Modifications
Mod_06_18 – PMEA Theoretically there should always be at least one Bid Offer Acceptance (BOA) Quantity which is unflagged and is therefore the Marginal.
Gemini Code Contingency Review
Determining Marginal Energy Action Prices Modification Proposal
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Capacity Market Code Modifications
Modification Proposal 136
Correction to No Load Cost - “and” vs “or”
Mod 09_19 - Removal of locational constraints from Imbalance Pricing
Interconnector trading in SEM 7th June 2007
Joint Office UNC Elections
Joint Office UNC Elections
Mod_10_19 Removal of Negative QBOAs Related to Dispatchable Priority Dispatch Units from the Imbalance Price 27th June 2019.
Correction to COP and clarification to CNLR
Joint Office UNC Elections
Capacity Market Code Modifications
Presentation transcript:

Redefinition of Schedule Production Cost

Background Appeal Panel reached determination on 2nd July 2018, directed CRU not to make modification to Appellant's Generator Licences. The modifications included provisions to replace BCOP with BMPCOP. CRU in process of initiating Judicial Review proceedings, but outcome of these proceedings will not be known until after 1st October 2018.

Background (contd) SEM Committee consider it inappropriate from level playing field perspective to apply BMPCOP to some but not all market participants. SEM Committee view the continued application of the BCOP in an interim period will ensure consumer interests are protected while maintaining a level playing field. In context of the Market Power Decision Paper (SEM-16-024) generators should formulate Complex Bid Offer Data submitted to the Balancing Market in accordance with the BCOP licence condition. Not intended that BCOP shall apply to Simple Offer Data. However, existing Licence Condition relies on definition of “Schedule Production Cost” in TSC Part A. No equivalent definition in Part B, and Schedule Production Cost will no longer be calculated.

Proposed change It is proposed that a new definition of Schedule Production Cost, not depending on Market Schedule Quantity, be incorporated in Part B of TSC. It is proposed that this new definition of Schedule Production Cost refers to the quantity “being contemplated by paragraph 3 of the Cost Reflective Bidding Licence Condition”. Hence, for whatever quantity as may be considered (rather than the Market Schedule Quantity), the production cost calculated from the Complex Bid Offer Data must be equal to the Short Run Marginal Cost. The definition reflects that only Complex Bid Offer Data, and not Simple Bid Offer Data, is subject to the BCOP.

Proposed change (contd) A new definition of Cost-Reflective Bidding Licence Condition incorporated in Part B of TSC is proposed, simply to identify the BCOP condition in each of the relevant licences. This modification is intended to make the minimum change necessary such that the existing BCOP licence condition and the existing Bidding Code of Practice can continue to have effect in I-SEM.