0433: Inclusion of the Transmission to Distribution “System Operator Agreement Guidelines” within the Offtake Arrangements Document.

Slides:



Advertisements
Similar presentations
NPD: Access Arrangements Current process Internal & External users formally request their own specific data extracts Proposed process Internal and External.
Advertisements

Task: Create a Non Pre-work Additional Pay Request To see this in PennWorks...click herehere Task Definition: Enter additional pay data and attach documents.
IMPORTANT READ CAREFULLY BEFORE USING THIS PRODUCT LICENSE AGREEMENT AND LIMITED WARRANTY BY INSTALLING OR USING THE SOFTWARE, FILES OR OTHER ELECTRONIC.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
Applicant Extract. Points we shall cover in this demonstration  Who gets access to the Applicant Extract  What kind of data we can extract  How to.
2nd Meeting Rome, 22nd March JHEP Coordination Action in support of the implementation of a Joint Programming Initiative.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Requirements Management - II Lecture # Recap of Last Lecture We talked about requirements management and why is it necessary to manage requirements.
Preliminary Assessment of the CCSDS SANA Registry Management Policy on the SFW Document April 2016.
process and procedures for assessments
Periodic Safety Update Reports (PSUR)
The 6th Framework Programme
PLWG Review 6.9 and the Interconnection process
Municipal Code Amendment Suspension of Utility Services for Violation of Specified Code Sections of the Pasadena Municipal Code City Council May 15,
Retail Market Assurance Services for the Irish Electricity Market
Data warehouse & associated reports
DSC Change Governance Review Group
Transmission Outage Coordination
Flow Chart to Support Appraisal Process
Solar Farm Operational Procedures SWEDE 2017
Voting Procedures Committee Report
Review Group 291- Ofgem Update
Overview of the WTO SPS Agreement and the role of
Demand Control Field Trials
HIPPA/HITECH Act Requirements Under the Business Associate Agreement Between CNI and Military Health Services.
European Labour Law Jean Monnet Chair of EU Labour Law Academic Year Silvia Borelli:
Online Training Course
Introduction of Code Contingency Guidelines Document
UK Link Technology Refresh
Informal document GRPE-76-24
Academic Achievement Record
Pseudo-tie business procedure
Structure of the guidelines Reminder on next steps
IMPACT OF EASA ON MAINTENANCE ORGANISATIONS IN CANADA J Hall
Task: Create a Non Pre-work Additional Pay Request
State of New Mexico Production Equipment Ad Valorem Tax
NTS Entry Charging Review Update
Pantry System Overview
Transmitted by the IWVTA Informal Group
Overview US Paper C2-7.INF
The Necessary Criteria for a UNC Modification Proposal
Update on Exit Capacity Substitution and Revision
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Background MDD is currently managed within SPAA
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
DSC Governance Sub Group Recommendations
Market Participant Identity Process – migration to UNC
Flow Swaps at NTS / LDZ offtakes
Project Nexus Workgroup
NOTIFICATIONS OF TIME EXTENSIONS
Subject Access Request received
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Introduction of Code Contingency Guidelines Document
UKL Committee - DN Interruption Update
Proposed Transitional Gas Exit Arrangements
Exchange of information with the WP.29 secretariat
Robin Dale RLG OAIS Functionality Robin Dale RLG
Tim Lee – Chair The Boeing Company May 21, 2013
Online Training Course
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Implementation Approach Distribution Workgroup – June 2014
International Whole Vehicle Type Approval
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
Project Nexus Workgroup
Pseudo-tie business procedure
Capacity Access Review
Proposed Commission Rules Changes WCLA 10/20/16
Presentation transcript:

0433: Inclusion of the Transmission to Distribution “System Operator Agreement Guidelines” within the Offtake Arrangements Document.

0433 Discussions on the timescales in Annex 4 section 1 – Notification of changes p.16 conclusion: that these would be left as they are with a recognition that for major change earliest notification and agreement is crucial (the spirit of this is covered in Annex 1 Business Planning). Generally agreement that for “new sites” (specifically DN entry) 60 days may not be sufficient. A view on making a specific reference to such a site and appropriate associated timescales will be taken at a future date and if necessary the document will be amended at that point. Change Annex 4 section 2 – validation between systems. (p.17) “An extract of the SCADA Database mapping required to support the SCADA – SCADA data transfer shall be provided to the other Party each week, or upon request”. Change to fortnightly. The Appendices A, B & C will be populated by all.

0433 add to Annex 3 to cover BA configuration changes as discussed: “Any changes to non-SCADA systems (referred to as business applications) which may impact other Parties’ systems should be managed via the IS Change Management process. This will allow the impact of any proposed business application changes to be assessed in sufficient time to permit discussions to agree how the change is managed effectively.” this is to cover the point raised by WWU concerning BA Configuration changes, such as changes to the aggregator file transfers; these are more varied than SCADA config changes and may require system software changes if, for example, the change is to file format. It was agreed that these changes should be covered by the IS Change Management process so that we can assess the impact and agree how to manage the change.