Gas Performance Assurance

Slides:



Advertisements
Similar presentations
OPERATING EFFECTIVELY AT WESD. What is Internal Control? A process designed to provide reasonable assurance the organizations objectives are achieved.
Advertisements

Xoserve Funding, Governance and Ownership Review Workgroup Structure FGO Programme Overview Board 2 June 2014 The Voice of the Networks.
WLR Consumer Issues Task Group 5 th August 2002 Consumer Protection in CPS CPS Marketing Code of Practice Claire Robinson - Centrica.
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
Fiscal Compliance Corner Recent Happenings, etc. MRAM September 2014 Ted Mordhorst Assistant Director for Post Award Financial Compliance Research Accounting.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
INFORMATION SECURITY GOVERNANCE (ISG) Relates to the security of information systems Is an element of corporate governance.
Siemens Energy Services Ltd Revenue Protection Services David Bown Revenue Services Product Manager Siemens Energy Services Ltd 26th August 2004.
Code Administrators Working Group Introduction 28 August 2008.
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
Internal Audit’s Role in Compliance Laurisa Riggan, CPA, CHE Children’s Mercy Hospitals and Clinics September 26, 2000.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Industry data quality, ownership and governance Meeting with UNC 17 July 2014.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Cooperation with Lobbying Monthly newsletter Annual publication Other issues Intro “MiFID and Regulated Markets” Ludovic AIGROT Chair of the FESE MiFID.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Connected System Exit Points Options for strategic regime change Chris Warner.
Gas Performance Assurance Framework 11 th January 2013.
IGT and Shipper Workgroup meeting 28 th February 2011.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Theft Detection Incentives
Gas Performance Assurance Framework March 2013
Options for Mod 640 Replacement
Performance Assurance Framework Risk Register Consultation Summary
Changes to the Business Unit Settlement Risk Rating (BUSRR) criteria
PRIDe in Gas Model workshop
Industrial Training Provider ,
Indicative PRIDe Project Plan
Theft: Information sharing
Reconciliation of Shipper and Supplier Theft Data – April 2018 PAC
Chris Warner Network Code Manager
Incentives 26 September 2018.
PAF Risk Register and PARR mapping
OPERATION OF THE BSC PERFORMANCE ASSURANCE BOARD – information for Gas Performance Assurance Workgroup Sasha Pearce, 4th March 2014.
Connected System Exit Points Administration Options
MOD 232 Proposal, Richard Dutton 16th December2008
Theft on Shipper-less Sites
Consideration of issues raised by UNC Modification Proposal 0244
Connected System Exit Points Administration Options
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
UIG Task Force Progress Report
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
Connected System Exit Points - Update
Consideration of issues raised by UNC Modification Proposal 0244
Proposer: Debbie Brace Panel Date: 20th March 2014
Theft: Shipperless Arrangements
Modification 421 – Updates and Benefits Case
Gas Performance Assurance Framework February 2013
Performance Assurance Framework (‘PAF’):
UIG Task Force Progress Report
Modification 440 Project Nexus iGT Single Service Provision
PN UNC Workgroup (AQ topic)
UIG Task Force Progress Report
UIG Task Force Progress Report
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

Gas Performance Assurance Edd Hunter

Potential Performance Assurance Measures Proposed Performance Assurance Framework for gas - 2012 Duties? Vires Ofgems role Final measures? Code removal ? Funding? Xoserve role? Option C – Cooperative model Escalation Board (PAB?) Governance SPAA / UNC? Membership Remedial Techniques Remedy? Education Qualification Charges? Support (OSM?) Incentives Breach? Preventative Techniques Assistance Liquidated Damages Training Reporting Xoserve? Sanctions Qualification Compliance Potential Performance Assurance Measures Detective Audit Peer Comparison Scope of reports AQs Publication and discussion Where? Frequency? Meter Read Performance Standards MAM/Meter Qualification Theft Metering Errors Shipperless Sites Reconciliation Performance

Benefits: Maintain integrity of gas settlement data Improves allocation of gas Allows for a transparent governance framework on common industry issues Why not?