ECE 477 Final Presentation Group 9  Spring 2005

Slides:



Advertisements
Similar presentations
ECE 477 Final Presentation Team 03 - Spring 2013 Ryan Pawling Spencer Julian Josh Hunsberger Robert Harris.
Advertisements

ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
MDR ECE 415 Team Advisor: Professor Marinos Vouvakis Douglas Imbier EE Team Leader Edmons Zongo EE Treasurer Nicholas Ferrero EE Website Administrator.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
Eye Detector Project Midterm Review John Robertson Roy Nguyen.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
Do you have control? Mr. Caudy Systems and Computer Control.
ECE 477 Final Presentation Team 7  Spring 2011 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 20  Spring 2013 Jordan Wagner Justin Spencer Mark Sears John Jachna.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design.
ECE 477 Final Presentation Group 9  Spring 2005 Nathan Smith, Omar Shaikh, Ryan Koors, Jeff Huston.
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 21 - Spring 2013 Team Members: Duncan Swartz, Jacqueline Greer, Tom Pansino, Mark Tubergen.
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Final Presentation Team 1  Spring 2012 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE477 Midterm Design Review: Team #
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
Daredevil Robot Direction Module (DRDM) Senior Design II Midterm Presentation.
ECE 477 Final Presentation Team 2  Spring 2010 Caleb Ayew-ew Josh Long Katie Schremser The Digi-Brush.
1 © 2008 RoboRubik ECE 477 Final Presentation Team 11 – Spring 2008 Tyler Heck Dave Bukiet Erik Carron Casey Kloiber.
A.M.E.N. Autonomous Meteorological Embedded Network for Fire Fighting Fan Zhang, Dmitry Stomakhin, Flavio Sira, Brian Hansen.
ECE 477 Final Presentation Team 3  Fall 2012 Daniel Carolyn Jonathan Mihir Stein McMican Kuntzman Shah.
ECE 477 Final Presentation Team 4  Spring 2011 Petra M. Alex B. Alex G. Kim S.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE 477 Final Design Review
ECE 477 Final Presentation Team 13  Spring 2008 Varun Srichand Anvesh Madhu.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
<Add team picture or relevant project picture here>
ECE 477 Design Review Team 13  Spring 2007
Investigating the Design Context.
<Add team picture or relevant project picture here>
Electrical candle ECE 411 Practicum Project Dung Vo Duc Phan
ECE 477 Final Presentation Team 04  Spring 2010
ECE 477 Digital Systems Senior Design Project  Spring 2005
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Final Presentation Group 2  Spring 2005
ECE 477 Design Review Team 8  Spring 2007
ECE 477 Final Presentation Team 8 Spring 2013
ECE 477 Final Review: Team #
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Senior Design Group 7  Spring 2006
ECE 477 Senior Design Group 4  Spring 2006
Group 11.
ECE 477 Senior Design Group 13  Spring 2007
ECE 477 Senior Design Group 1  Fall 2006
ECE 477 Final Presentation Group 5  Spring 2005
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Final Presentation Team 4  Fall 2011
ECE 477 Senior Design Group 8  Spring 2007
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
ECE 477 Final Presentation Team 2 Spring 2012
ECE 477 Final Presentation Team 10  Spring 2008
ECE 477 Senior Design Group 11  Spring 2006
ECE 477 Final Presentation Team 4  Fall 2010
ECE 477 Final Presentation Team 1  Spring 2008
ECE 477 Senior Design Group 5  Spring 2011
ECE 477 Senior Design Group 14  Spring 2006
ECE 477 Senior Design Group 3  Spring 2011
ECE 477 Design Review Team ??  Fall 2012
ECE 477 Final Presentation Team 15  Spring 2010
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
ECE 477 Final Presentation Team 13  Spring 2011
ECE 477 Final Presentation Group 10  Spring 2005
Presentation transcript:

ECE 477 Final Presentation Group 9  Spring 2005 Nathan Smith, Omar Shaikh, Ryan Koors, Jeff Huston

Outline Project overview Design challenges faced ECE 362 knowledge used Project demo

General Informative Medical Prosthetic Project Overview: General Informative Medical Prosthetic Gait sensory feedback system for existing lower limb prosthetic devices. Modes: “Direct Map” “Training” “Upload”

Challenges Faced: PCB size and packaging Learning tools: OrCad, CodeWarrior Finding components: “learning” Digikey Keeping LCDs from catching fire Communication of interfaces Learning how to solder

PCB Layout Board designed to fit into 5”x7” container

Success Criteria Demonstrations Project-specific success criteria #1

Success Criteria Demonstrations Project-specific success criteria #3

Success Criteria Demonstrations Project-specific success criteria #4

Project Summary: Lessons Learned Look for parts early—this really helped us Layout should be completed & bread-boarded almost immediately Understand software environment almost immediately Multiple revisions on PCB Come to ECE477 with project ideas Choosing members by mutual interest Brainstorming ahead of time Equal parts EE/CompE Mutual responsibility-everyone must be a leader “Grinder nights”

Project Summary: Version 2 Suggested Changes Smaller Design, actually integrated into an existing prosthetic leg No status LEDs needed—results in less power consumption Less “power hungry” LCD More data management (additional forms) Higher resolution for sensors and motors Sound feedback Use a more compact clinometer Wireless connectivity

Questions / Discussion