Analysis of Network Outage Reports

Slides:



Advertisements
Similar presentations
The FCCs Disaster Information Reporting System (DIRS) July 14, 2009.
Advertisements

1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014.
Federal Communications Commission Public Safety and Homeland Security Bureau Public Safety Communications Update “View from the FCC” David G. Simpson,
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy February 2015.
Index Values NATIONAL STATISTICAL COORDINATION BOARD.
No. 100 Comparison between AMS700TM CX and ColoplastTM Titan inflatable penile prostheses for Peyronie’s disease treatment and remodelling: Clinical outcomes.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
OECD Short-Term Economic Statistics Working PartyJune Analysis of revisions for short-term economic statistics Richard McKenzie OECD OECD Short.
PCT Statistics Meeting of International Authorities Twenty-Second Session Tokyo, February 4 to 6, 2015.
Review of Power Blackout on Telecom P. J
Internet Outage Trends Sean Donelan Equinix Inc NANOG 21 Atlanta, Georgia.
Scorecard Tool Steve Kisiel, MS Vince Placido, BSE Jeffery K. Cochran, PhD James R. Broyles, BSE.
Web-centric BusinessNRIC V – February 27, 2001 NRIC V Council Meeting - February 27, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy September 2014.
1 Recent Economic Developments Strong growth in exports so far in Little change in standards for C&I loans to small firms over the past three months.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy May 2015.
Statistics Division Beijing, China 25 October, 2007 EC-FAO Food Security Information for Action Programme Side Event Food Security Statistics and Information.
Wireless Telecommunications Bureau Wireless Telecommunications Overview January 2009.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Building Control System (Metasys) Project Status David J. Ritchie CDO/Operations March 18, 2003.
Statistics on Frequency Departure from 60 Hz in The Eastern Interconnection Priority-based Control Engineering (PCE) Tel:
Working Group 8 – E9-1-1 Best Practices December 16, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2015.
Network Reliability and Interoperability Council Focus Group 3 April 14, 1999 Ray Albers- Bell Atlantic Focus Group III Chair.
Web-centric BusinessNRIC V – June 26, 2001 NRIC V Council Meeting - June 26, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
Wholesale Local Service - Planned Outages November 2014.
Performance Measurement Workgroup 12/16/ Update on CMMI Waiver Target Metric  HSCRC and CMMI have agreed to Version 5 of readmission measure,
The Effects of Electronic Prescribing Implementation on Patient Safety, Customer Satisfaction, and Prescription Recapture CPT Nicole Robinson, Pharm D.
CLI 2016 Budget Survey Results FINANCE COMMITTEE.
30% • 30-day Treasury bills • Intermediate-term government bonds
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Performance Measurement Workgroup
Copyright Assure911.net, LLC All Rights Reserved.
CHU HAI COLLEGE OF HIGHER EDUCATION DEPARTMENT OF COMPUTER SCIENCE Preparation of Mid-Term Progress Report Bachelor of Science in Computer Science.
Measures of Labor Underutilization from the Current Population Survey
Date of download: 12/31/2017 Copyright © ASME. All rights reserved.
ROAD SAFETY STATISTICS FROM 1 JANUARY -26TH APRIL,2016
Analysis of Network Outage Reports
Solar City: Effect of Solar Technologies on Network Performance
and Amended Calendar Proposal(s)
15EEE287 Electronic Circuits & Simulation Lab-II
Analysis of Network Outage Reports
PCT Statistics Meeting of International Authorities Twenty-Third Session Santiago January 20 to 22, 2016.
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
Asthma in Australia 2008 Mortality
Ossi Nurmi 15th Global Forum on Tourism Statistics, Cusco, Peru
Behavior Modification Report with Peak Reduction Component
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Director Dennis P. Butler
SOE Retreat Data Summaries Report 2010
Performance Measurement Workgroup
Differential gene expression in whole blood from SJIA patients and healthy controls. A. Data were normalized in Beadstudio using the "average" method and.
Restructuring Roundtable June 29, 2001 David Schlissel
2nd Joint Workshop Pesticides Statistics 2005 Transition Facility Statistical Cooperation Programme Phare Programme Further steps.
Analysis of Network Outage Reports
Director Dennis P. Butler
and Amended Calendar Proposal(s)
Tropospheric Ozone Assessment Report (TOAR)
Atlantic Coast Operations
Modular Edge-connected data centers
ISDS Service Support Performance – May 2019
Climate Change Statistics for Agriculture, Forestry and Fisheries
Practical Solutions Analysis of Variance
Presentation transcript:

Analysis of Network Outage Reports Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy February 2018

Data Source Database snapshot as of February 6, 2018 NORS Final Outage Reports through December 2017 were used in the analysis

Frequency Trend Analyses Estimate past trend and seasonality effects Estimates used in trend chart Based on 3-year window (4Q14 – 3Q17) Estimate most recent trend Comparison with past trend Based on 3-year window (1Q15 – 4Q17) Calculate 4Q17 average monthly frequency Test if significantly different from expected frequency based on past trend and seasonality effects

Frequency of Outages by Month Monthly Trend 0.9% (down from 1.1%) 4Q17 Monthly Average 1988.3 (significantly lower than expected)

Outage Index – For All Outages Except DS3-Simplex See ATIS-0100021 Analysis of FCC-Reportable Service Outage Data for a description of the method used to calculate the outage index.

(significantly lower than expected) Planned Maintenance Monthly Trend 5.2% (down from 5.4%) 4Q17 Monthly Average 383.0 (significantly lower than expected)

DS3 (Non-Simplex) Events Monthly Trend 0.9% (down from 1.1%) 4Q17 Monthly Average 1147.7 (significantly lower than expected)

Big DS3 Outages

Big DS3 Outages Monthly Trend 1.0% (down from 1.4%) 4Q17 Monthly Average 69.0

(significantly lower than expected) DS3-Simplex Monthly Trend 1.2% (down from 1.5%) 4Q17 Monthly Average 164 (significantly lower than expected)

Fiber Cut Monthly Trend flat 0% (unchanged) 4Q17 Monthly Average 213.3

E911 Monthly Trend flat 0.0% (down from 0.7%) 4Q17 Monthly Average 88.0

Very Large E911 Outages Monthly Trend flat 0% (unchanged) 4Q17 Monthly Average 1.7

(significantly lower than expected) E911 – Phase 2 Events Monthly Trend 2.0% (down from 2.8%) 4Q17 Monthly Average 21.3 (significantly lower than expected)

Wireline Monthly Trend flat 0% (unchanged 0%) 4Q17 Monthly Average 71.7 Wireline outages are all outages for which the Reason Reportable was at least 900,000 wireline user-minutes.

Wireless Monthly Trend 1.0% (unchanged) 4Q17 Monthly Average 215.0

VoIP Monthly Trend 5.5% (down from 6.0%) 4Q17 Monthly Average 280.7 (significantly lower than expected)

SS7 Monthly Trend -2.1% (unchanged) 4Q17 Monthly Average 13.0

Malicious Events Monthly Trend -3.0% (up from -3.5%) 4Q17 Monthly Average 9.3

Malicious Activity The figures for 2017 are through December.

(significantly lower than expected) Hardware Failure Monthly Trend 0.3% (down from 0.5%) 4Q17 Monthly Average 398.7 (significantly lower than expected)

Environmental – External Monthly Trend 0.5% (down from 0.7%) 4Q17 Monthly Average 232.7

Power Failure Monthly Trend flat 0% (down from 0.6%) 4Q17 Monthly Average 274.3

(significantly lower than expected) Diversity Failure Monthly Trend -0.6% (down from 0%) 4Q17 Monthly Average 50.0 (significantly lower than expected)

Duration Trends: DS3 Non-Simplex The duration of DS3 Non-Simplex outages has decreased from 2016 to 2017 (statistically significant using a Mann-Whitney test).

Duration Trends: E911 The duration of E911 outages is statistically unchanged in 2017 compared with 2016 (using a Mann-Whitney test). 7

Duration Trends: Wireline The duration of wireline outages is statistically unchanged in 2017 compared with 2016 (using a Mann-Whitney test).

Duration Trends: Wireless The duration of wireless outages is statistically unchanged in 2017 compared with 2016 (using a Mann-Whitney test).

Duration Trends: DS3 Simplex The duration of DS3 Simplex outages is statistically unchanged in 2017 compared with 2016 (using a Mann-Whitney test).

Duration Trends: VoIP The duration of VoIP outages has increased from 2016 to 2017 (statistically significant using a Mann-Whitney test).

Duration Trends: Other Special Facilities The duration of other special facilities outages is statistically unchanged from 2016 to 2017 (using a Mann-Whitney test).

Test for Trend in Event Duration Non-DS3-Simplex Outages Data from 1/2015 thru 12/2017 DS3-Simplex Events Only Data from 1/2015 thru 12/2017 Rank Correlation of duration with date is -.036 and is significant at the .0001 level Rank Correlation of duration with date is .062 and is significant at the .0001 level Conclusion: Durations of Non-DS3-Simplex Outages have shortened over the period from 1/2015 thru 12/2017. Conclusion: Durations of DS3-Simplex Events have lengthened over the period from 1/2015 thru 12/2017.

NORS Transition Monthly NORS Coordinators Meetings NORS User Manual FCC sent proposed changes to NORS manual to the NRSC for its feedback DS3 Simplex threshold change implemented in December 2017 Implemented going from DS3s to OC3s in January 2018