HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM

Slides:



Advertisements
Similar presentations
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
Advertisements

HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
North American Profile Briefing FGDC Coordination Group May 1, 2007 Sharon Shin, FGDC Metadata Coordinator.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
WP3 Task 3.2 Adaptation of the Training Material.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
AR Meeting - 27 January 2011, ESA (Frascati) HMA FO Task 1 : EO Metadata Extensions Frédéric Houbie, ERDAS Steven Smolders, GIM Andrew Woolf, STFC Dominic.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
A Liaison Report from ISO TC211 to CEOS WGISS Dr. Liping Di
HMA Follow On Activities
HMA AWG Configuration Management Status 1 December 2008
HMA Follow On Activities
Heterogeneous Missions Accessibility HMA Architecture Working Group
HMA FO Task 1 : EO Metadata Extensions
CEOS OpenSearch Project II
HMA Follow On Activities
Ordering Services for EO Products SWG ATS / ETS
IMAA-CNR activity report
EO Profile of GML and HMA Product Catalog for VITO CVB
HMA Follow On Task 1 Standards evolutions
WP1 INERTIA Framework Requirements, Specifications and Architecture
Ordering Services for EO Products SWG ATS / ETS
GeoJSON(-LD) Encoding of Granule Metadata
CEOS OpenSearch Project II
HMA Follow On Activities
DocTeam SC Report to TC 94th OGC Technical Committee Barcelona Spain
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-FO Task 1 EOP Metadata
Overview of HMA/DAIL Overview of HMA ICDs HMA implementation at ESA
HMA Follow On Activities
Contributions to Testing and Reference Data
HMA Follow On Activities
Standardisation Status Update
HMA for Science Cataloguing of ISO Metadata (CIM) using the ebRIM
CIS work programme Ad-hoc activity on Economics
CountrySTAT Platform Overview of the
CITE tests for and HMA-T Phase 2 Progress Meeting
Ordering Services for EO Products Abstract Test Suite (ATS)
HMA Follow-on Kickoff Meeting
HMA-T: “EO GML” and “EO ebRIM CSW” for VITO CVB
OGC and activities HMA-T Phase 2 KO Meeting
Questionnaire on progress in preparing reports under Nature Directives
CITE tests for and HMA-T Phase 2, FP Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
Pier Giorgio Marchetti - European Space Agency
SWE 2.0 – Current Status of Standards
(Minimal and INSPIRE Conformance Levels)
WG Title Goes Here Name (s), Organization, CEOS Affiliation
HMA-Testbed Project Call
Review plan of the nature reporting – update 6
Hydrographic Services and Standards Committee
HMA for Science Task 1 – Project Management
9th meeting of the Expert Group on Reporting (22 March 2011)
5.b3 Monitoring & Reporting 2019
WG standards for data access/exchange
AIXM – Work in Progress AIXM CCB – Webex, 14 MAR 2014.
QoS Metadata Status 106th OGC Technical Committee Orléans, France
EO profile for WMS progress report
Presentation transcript:

HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM Andrew Woolf, Dominic Lowe, STFC

Task 1 Structure WP1000 – Project Management (ERDAS) WP2000 – Analysis of the extension and Update of the EO GML Task 2100 – ERDAS contribution: document update and OGC submission process Task 2200 – GIM contribution: synthesis and systematic products Task 2300 – STFC contribution: radar altimeter, limb looking products, new schemas WP 3000 – Test Task 3100 – SSE (GIM) Task 3200 – CITE (ERDAS) WP 4000 – OGC process (ERDAS) Slide 2

Task 1 Planning We are here Slide 3

WP 1000 WP 1000: Project management Progress reports uploaded Slide 4

WP 2000 WP 2000: Analysis of the extension and update of the EO GML WP2100: Catalog TN No new update WP2200: Synthesis and systematic products Comparison of code lists for variable names Liaison between Task 1 and Task 3 on handling of metadata Finalisation of metadata TN and schema extensions Compilation of questionnaire WP 2300 : Radar altimeter, limb looking products, new schemas Finalising of Altimetry and Limb-looking metadata proposal, including further feedback, with revision of TN as appropriate. Metadata harmonisation with GIM and Systematic/Synthesis products. UML changes to reflect updated metadata. Preparation of Questionnaire. Collaborated with Simon Cox to ensure O&M XML satisfies HMA-FO requirements  Slide 5

WP 3000 WP3000 Tests Training at IGN next week to use their framework Slide 6

WP4000 WP4000 OGC Process CS-W ebRIM SWG Waiting for Carl for the announcement Portal ready, Meeting at the next TC to discuss and validate all the CR Charter members are : ERDAS GALDOS CNES IGN NGA Cubewerx Slide 7

Questionnaire Questionnaire Ready later than expected Comments from DLR at the very last moment Objective is to receive feedback by 3 weeks (mid May) Slide 8

Action MOM25 a19 - Documents to be aligned with ECSS-E-ST-40C Closed Not relevant for technical notes or OGC standards Closed Slide 9

Action MOM27 Raise/support CR to have full Filter Syntax not mandatory. Discussed during last CS-W telecon when dealing with FE 2.0 support Leave it open until concrete CR is written Slide 10

Action MOM28 Change term "ad hoc query" into more appropriate term. Open : To be discussed in the CS-W ebRIM AP 2.0 Slide 11

Actions MOM 33,34,35 Use O&M "metadata field" as per MoM. Use O&M "Observed Property" as per MoM. Use O&M "resultTime" as per MoM. Implemented in the TN Closed Slide 12

Action MOM41 analyse Spotimage EO metadata requirements TN and impact on EO GML EO Products Element analyzed Administrative MD (ISO 19115) mapped to metadata property of O&M is used Left as open as some points might still be discussed after the questionnaire feedback. Slide 13

Actions JM01  JM05 Addressed in last update of the TNs Closed Slide 14