API Subcommittee 13 on Drilling, Completion and Fracturing Fluids

Slides:



Advertisements
Similar presentations
Sub-Committee 13 API SC13 Drilling Completion and Fracturing Fluids June 13, 2012 Westminster, Colorado Paul Scott, Chair Johnna Smith, Secretary David.
Advertisements

2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
SPEC 13A Sec. 16 Drilling-grade Starch
CONTENTIOUS MEETINGS Presented by: Ralph McMullen, MPA
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
TG2: Publications SC13 – Report on Work Groups and Publications Sheraton Chicago Hotel & Towers Chicago, Illinois June 19, 2014.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
SC13 API SC13 Drilling Completion and Fracturing Fluids Jan 26, 2011 Fort Worth, TX Paul Scott, Chair Johnna Smith, Secretary David Ekas Vice-Chair.
SC13 Summer 2011 API SC13 Drilling Completion and Fracturing Fluids June 29, 2011 San Francisco, CA Paul Scott, Chair Johnna Smith, Secretary David Ekas.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
1220 L Street, NW Washington, DC Executive Committee on Standardization of Oilfield Equipment & Materials (ECS) New Member Orientation.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API SC13 TG08 WG05 SPEC 13A Sec. 16 Drilling-grade Starch SC13 – Drilling Completion and Fracturing Fluids June 17, 2014.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
San Francisco, CA. SC8 Liaison Report
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
API FALL MEETING November , 2013 New Orleans, Louisiana
API SPRING MEETING May , 2014 Orlando, Florida
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API FALL MEETING November , 2016 New Orleans, LA
Task Group API 19SS Sand Screens
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
API SPRING MEETING April , 2015 Seattle, Washington
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
Brent Estes, Chair Carl Stouffer, Secretary Saleh Al-Amari, Vice-Chair
API FALL MEETING November , 2015 Long Beach, CA
API SPRING MEETING May , 2016 Chicago, IL
2017 API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
Task Group API 19SS Sand Screens
API FALL MEETING November , 2014 Denver, Colorado
API SC13TG 10 API 19C Meeting July 16, 2014
2017 Exploration & Production Winter Standards Meeting
Vertical Applications TAG Closing Report
IEEE s: ESS Mesh Networking Task Group
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2016]
2016 Exploration & Production Standards Conference Subcommittee 10
IEEE Task Group G Adopted Agenda for January 2001 Session
November 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [] Date Submitted: [7 November 2017] Source:
November 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2017]
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2014]
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
SC13TG08 Drilling Fluid Materials
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2017]
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2016]
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
<month year> doc.: IEEE < e> <September 2018>
ARC-agenda-report-minutes-july-2011
September 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2017]
Saleh Al-Ammari SC13 Chair
Saleh Al-Ammari SC13 Chair
API Subcommittee 13 on Drilling, Completion and Fracturing Fluids
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda January 2019 Interim] Date.
January 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2015] Date.
IEEE Task Group G Adopted Agenda for January 2001 Session
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2016]
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
Submission Title: [WG-TG3 Opening Report Jan02]
CSOEM Materials Advisory Resource Group
ARC-agenda-report-minutes-july-2011
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Upstream - Standards - Committee on Standardization of Oilfield Equipment and Materials (CSOEM)

Hyatt Regency San Antonio 2018 Exploration and Production Standards Conference on Oilfield Equipment and Materials January 22 – 26, 2018 Hyatt Regency San Antonio

Welcome Safety minute First time attendees Agenda SC 13 background API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Welcome Safety minute First time attendees Agenda SC 13 background

API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Tuesday, January 23rd, 2018 Time Subject/Group Chair 08:00 am 8:15 am Introduction Saleh Al-Ammari 08:15 am 9:00 am Task Group 2 - Publications Paul Scott 09:00 am 10:00 am Task Group 3 - OBM Procedures Kim Burrows 10:30 am Morning Break   10.30 am 11:30 am Task Group 4 - WBM Procedures David Breeden 13:00 pm Lunch 01:00 pm 02:00 pm Task Group 5 - Solids Control Sam Bridges 02:30 pm TG7/ TG9 status All 02:30 am 03:00 pm Afternoon Break 04:00 pm Task Group 6 - Testing of Heavy Brines Judy Guy-Caffey

API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Wednesday, January 24th, 2018 Time Subject/Group Chair 08:00 am 09:00 am Task Group 8 - Materials Specifications Mohd Abshar 10:00 am Task Group 10 - Proppants Ron Powell 10:30 am Morning Break   10.30 am 11:30 am Brainstorming session on SC13 activities All 1:00 pm Lunch 01:00 pm 04:00 pm SC 13 Meeting Saleh Al-Ammari

API Subcommittee 13 on Drilling, Completion and Fracturing Fluids 6:00 pm – 7:30 pm API Reception   Note: Refreshments will be available from 10:00 am to 10:30 am and 2:00 pm to 2:30 pm both days

Charge Committee Scope API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Charge Develop and Maintain Specifications and Recommended Practices for Drilling, Completion, Fracturing Fluids/Proppants, Fluids Processing Equipment and related subjects Committee Scope SC 13 develops and maintains 14 standards on: Drilling Fluids, Drilling Fluid Processing Systems, Testing of Heavy Brines, Completion and Fracturing Fluids and Proppants.

API Subcommittee 13 on Drilling, Completion and Fracturing Fluids API Website: Standards – Committee Info - CSOEM – SC13 Sign-in: Email address & 1st time Password: FirstnameLastname or “Forgot Password”

Chair: Saleh Al-Ammari Vice Chair: Brent Estes API Subcommittee 13 on Drilling, Completion and Fracturing Fluids Chair: Saleh Al-Ammari Vice Chair: Brent Estes Secretary : Carl Stouffer Members 36 Alternates 11 Mailing List and Website 97

API Subcommittee 13 Task Groups Title Work Group Publication 2 Publications 1 3 OBM Procedures 4 WBM Procedures 5 Solids Control 6 Testing of Heavy Brines 12 7 Rheology & Hydraulics 8 Materials Specifications 9 Comp, Stim, Frac Fluids 10 Proppants Total 32 16

API Subcommittee 13 Work Groups TG Title Documents Work Group Status Chair 3 OBM Procedures RP 13B-2 1 OBM Chemical Analysis Hibernation Jose Perez 2   PSD Test Method For OBMs/SBMs Active Scott Klasner 4 NAF Activity Modifiers Brent Estes WBM Procedures RP 13B-1 RP 13I Simulated Drill Solids for Fluid Testing Vacant PPT Procedure Revision PSD LCM Fred Growcock 5 Solids Control RP 13C SCE Determination Screen Certification or Monogram Program Mike Morgenthaler Screen RP to Auditable Standard La Tosha Moore

API Subcommittee 13 Work Groups TG Title Documents Work Group Status Chair 6 Testing of Heavy Brines RP 13J 1 Revisions to Testing of Heavy Brines Hibernation Judy Guy Caffey 2 Brine Buffer Capacity   3 PCT Test Procedures 4 Corrosion Update 5 Future Projects Return Permeability 7 Displacements Active Ed Rapp 8 Hydrates 9 Scale 10 CRA Testing Program JIP Paul Agosta 11 Emulsion Technology Gianna Pietrangeli/Katrina Schultz 12 Brine viscosity

API Subcommittee 13 Work Groups TG Title Documents Work Group Status Chair 8 Materials Specifications Spec 13A RP 13K 1 WG Reference Materials Active Vacant 2 Xanthan, Starch & Guar Tests Hibernation   3 Barite 4.1 4 Update on Barite Chemical Analysis 5 Starch Specifications 6 Alternate Methods for Density Determination Mohad Abshar 9 Comp, Stim, Frac Fluids RP 13M-1 RP 13M-2 RP 13M-4 RP 13M-5 Measurement of Fluid Loss Under Dynamic Condition Mahmoud Asadi Regain Permeability Asadi & McElfresh Co Friction of non Newtonian fluids Shah/Reinaldo 10 Proppants RP 19 C RP 19 D Physical Properties Testing S. Schilling/J. Jackson Long-term Conductivity Testing D. Goloschchapova 15 33 18 13

Proposed as TR 13M-6 (ISO 13503-6) API Subcommittee 13 Publications No. Title Number Responsible TG 1 Drilling Fluid Materials Spec 13A  TG08 2 Field Testing Water-based drilling fluids RP 13B-1 TG04 3 Field Testing Oil-based Drilling Fluids RP 13B-2 TG03 4 Drilling Fluid Processing Systems Evaluation RP 13C TG05 5 Rheology & Hydraulics of Oil-well Fluids RP13D TG07 6 Laboratory testing of drilling fluids RP 13I 7 Testing of Heavy Brines RP 13J TG06 8 Chemical analysis of barite RP 13K 9 Training & Qualification of Drilling Fluid Technologists RP 13L TG02 10 Measurement of Viscous Properties of Completion Fluids RP 13M-1 TG09 11 Testing the performance of friction reducers in straight, smooth conduits TR 13M-5 12 Measuring stimulation and gravel-pack fluid leakoff under static conditions  RP 13M-4 13 Measurement of Properties of Proppants used in hydraulic fracturing and gravel-packing operations, RP 19C  TG10 14 Measuring the long-term conductivity of proppants RP 19D 15 Stress Corrosion Cracking of Corrosion Resistant Alloys in Halide Brines Exposed to Acidic Production Gas 13 TR 1  TG6 16 ISO 13503-6:2014 – Completion fluids and materials – Part 6: Measuring leakoff completion fluids under dynamic conditions First edition 2014-03-15 Proposed as TR 13M-6 (ISO 13503-6) TG9

API SC13 TG & WG Agenda Checklist API Subcommittee 13 on Drilling, Completion and Fracturing Fluids API SC13 TG & WG Agenda Checklist I. Call the meeting to order and review agenda II. Read TG / WG Charge and designate someone to keep minutes III. Present / update membership, call roll and document attendance / quorum IV. Present previous meeting minutes, revise and approve V. Discuss progress on previous “action items” VI. Present new work & other major topics VII. Revise timeline / calendar for the work of this TG / WG VIII. Old Business IX. New Business X. Review current “action items” XI. Schedule next TG / WG meeting XII. Review / revise names for TG Chair succession XIII. Adjourn meeting

API Subcommittee 13 on Drilling, Completion and Fracturing Fluids TG Chairs Conference Call October 27, 2017 Utilize Monday to schedule work group meetings especially in the Winter meeting Conduct quarterly teleconference between SC 13 chair, vice chair, and task group chairs to go over the activities Encourage the participations of young/new members in your companies Propose more technical challenges that you may solicit/face at work Form a small team within your companies to review and comment on API projects