Recap Recap construction site plan

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
Pricing Excavation and Backfill
Bidstreet’s Distributor Agent Program BidstreetUSA.com, LLC 801 International Pkwy., 5th Floor Lake Mary, FL Tel: Cell.
 WHAT THE TASK FORCE COMMITTEE DID ?  WHY DOES ANDOVER NEED A NEW TOWN YARD?  WHAT ARE THE COST IMPACTS OF NOT DOING ANYTHING?  WHAT ARE THE BENEFITS.
Low Cost Housing Development on Devils Peak. Tender Low cost housing development on Devil’s Peak Low cost housing development on Devil’s Peak Investigate.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Fatality Assessment Control Evaluation May 25, 2005.
Urban, Suburban & Rural. Urban People often define urban areas, or cities, as land occupied by buildings and other structures used for residences and.
Elements of Artwork What moves in these paintings?
Project Update August 2008 Richard Rife Deputy Project Manager.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
EMERGENCY FACILITIES AND EQUIPMENT. Facility: Any equipment, structure, system, process, or activity that fulfills a specific purpose Site: The area over.
Second Street Closure for Construction of B21 1/16/16 – 1/31/16.
VIA / TCU 4th semester workshop S2016 Intro BPM VIA University CollegeTCU-VIA Workshop – S2016 JMOG1 Agenda What is BPM? The wedding party – The processes.
FINAL PROJECT 7TH SEMESTER ARCHITECTURAL TECHNOLOGY AND CONSTRUCTION MANAGEMENT M ARTA G AGO P ENALBA PROJECT : 32 DWELLINGS IN VEJLEVEJ.
VIA / TCU 4th semester workshop S2016 Soil work and machines VIA University CollegeTCU-VIA Workshop – S20161 Factors to remember in the working process.
Best 20 jobs jobs sites.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
What happens when technology changes?
Governmental Maintenance Division, Department of General Affairs
Highveld Industrial Park Workshop No. 2 Information Memorandum
Highveld Industrial Park Storage Warehouse No. 3
AERIAL/LOCATION MAP N Old Kings Rd. Town Center Blvd. 10 Peylo Place
Highveld Industrial Park Workshop No. 21 Information Memorandum
Cambrian School District Project Update June 4, 2015 Board of Trustees Meeting Jason Vann, CFO Will Robertson, Kramer Project Development Co.
Highveld Industrial Park Workshop No. 3 Information Memorandum
(Refer to Chapter 2 of the textbook)
Construction site plan
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
Civil Engineering Construction Technology and Organization
CIS 210 Innovative Education-- snaptutorial.com
Decisions and considerations of choosing or building a new home.
Shed exercise VIA / TCU 4th semester workshop S2016
Personal planning and portfolio
Registration assignment
Time schedule for implementation as main contractor
Recap Recap construction site plan
Recap Recap construction site plan
Intro BPM VIA / TCU 4th semester workshop S2017 Agenda What is BPM?
Civil Engineering Construction Technology and Organization 1/2
Why do we use the WBS method Common assignment – Eat project Examples
Soil Mechanics Assignments
Final exam VIA / TCU 5th semester workshop VIA University College
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Welcome to the 5th semester
Construction site plan

Contract and tender form Phases of designing Phases of implementation
Recap QUANTITIES Taking out quantities

Product Mix, Equipment, Design
Final exam 3rd semester A2018
Budgeting at the State Level
Geographic Conditions and Connections
Health and safety VIA / TCU 5th semester workshop
Welcome to the 4th semester Intro to S2017
Health and safety VIA / TCU 5th semester workshop
Shed exercise VIA / TCU 4th semester workshop VIA University College
Exercise : Making a wedding cake
Health and safety VIA / TCU 5th semester workshop
Wbs, CONTRACTORS & GIVING A BID
Construction site plan
CASE 2 : Two-storey building
Renting equipment VIA / TCU 4th semester workshop Agenda The 4 Ms
Machinery and equipment continued
Things You Need to Know about Underground Utility Contractors Dalton GA.
Presentation transcript:

Recap Recap construction site plan VIA / TCU 6th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 1

Recap construction site plan VIA / TCU 6th semester workshop S2017 What is a construction site plan? Purpose of a plan? Who will use this plan? Why will they use the construction site plan? When do we use the construction site plan? Who will keep the plan(s) updated? VIA University College TCU-VIA Workshop – S2017 2

Recap construction site plan VIA / TCU 6th semester workshop S2017 What do you think should be on the construction site plan for our project? 1 – Site managers wagon 2 - Canteen 3 – Bathroom/toilet 4 - Water 5 -Storeroom 6 - Sewer 7 – Power – how many Amp? 8 – Fire/first aid control center 9 - Dormitory 10 – Crane 11 – Other equipment VIA University College TCU-VIA Workshop – S2017 3

Starting up the Recap construction site plan VIA / TCU 6th semester workshop S2017 Know the area where to build. Visit the place. Go there. Drive there… When visiting the site, investigate: Different heights at the ground (can the machines drive there?) Waterholes (do we need to empty it first?) Trees, bushes on the site? Old houses on the site? Ancient monuments? Rare animal spices? Soil density, contamination, former use of the ground? How to secure the area from public (safety/theft/secret)? Others things? Basic for the construction site plan Access to water Infra structure, roads and entrance Space to work and deliver materials Water, electricity and sewers Maybe neighbors if the building is close to them VIA University College TCU-VIA Workshop – S2017 4

New shopping center in Aarhus, Denmark VIA / TCU 6th semester workshop S2017 What do you think this construction site plan needs? 1 – Soil depotize 2 – Space for materials 3 – Canteen 4 – Toilet/bathroom 5 – Sewer 6 – Water 7 – Powerline and Amp? 8 – Internal roads 9 – Fence and entrance 10 - First aid 11 - Crane VIA University College TCU-VIA Workshop – S2017 5

Site Excavation VIA / TCU 6th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 6

Continuing the construction site plan VIA / TCU 6th semester workshop S2017 What kind of information should be in the construction site plan? Haw many site plans should there be? The level of informations? High/low/many/few? The minimum demands for the plan? Who will be using the construction site plan: The building owner The contractor The different trades The neighbors The fire department The authorities Others….who Or a mix from above? VIA University College TCU-VIA Workshop – S2017 7

Starting up the Recap construction site VIA / TCU 6th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 8

Starting up the Recap construction site VIA / TCU 6th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 9

Starting up the Recap construction site VIA / TCU 6th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 10

Assignment VIA / TCU 6th semester workshop A2017 Make a sketch for the site planning for the site on paper. The site plan should fit the contractors needs of information, include safety Decide what crane you shall use on site for your job Calculate price for the site plan VIA University College TCU-VIA Workshop – A2017 11

Assignment VIA / TCU 6th semester workshop A2017 VIA University College TCU-VIA Workshop – A2017 12