TGac Status and Timeline January 2009 doc.: IEEE 802.11-yy/xxxxr0 March 2009 TGac Status and Timeline Date: 2009-03-09 Authors: Osama Aboul-Magd, Nortel Networks Osama Aboul-Magd, Nortel Networks
TGac Status March 2009 Functional Requirements Selection Procedure Submission 09/0071 presented a set of questions related to TGac functional requirement Hopefully will have the first draft for discussion in this meeting Selection Procedure Submission 09/0035r1 describes a proposed selection procedure. Further discussion on conference call, Feb. 12. Usage Models Submission 09/0161 describes Usage Models specific to TGac. The document is accepted as the TGac Usage Models baseline document. Need a formal motion. Channel Models Two submissions on Channel Models (09/0088 and 09/0179) were presented. The two presentations agreed on the use of the 802.11n channel models for TGac and incorporate changes as needed. Expect at least one submission this week Specification Framework Submission 09/0086 provided an initial straw man to stimulate discussion Osama Aboul-Magd, Nortel Networks
Proposed Timeline March 2009 We are Here 2009 2010 2011 WG April May June July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Aug Sept Oct Nov Dec Usage Models Functional Requirements Selection Procedure Specification Framework Comparison Criteria/Simulation Models WG Letter Ballot TGac Draft First Draft Osama Aboul-Magd, Nortel Networks