HTC 34; 5656 AE Eindhoven, the Netherlands

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Advertisements

Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
IEEE TGv March 2010 Agenda Date: Authors: March 2010
TGax March 2017 Closing Report
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
HTC 34; 5656 AE Eindhoven, the Netherlands
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
TGs San Diego Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
TGs Atlanta Closing Report
TGz Beijing May 2010 Closing Report
TGs Waikoloa Closing Report
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGs Waikoloa Closing Report
TGs LA Closing Report Date: Author: January 2011
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Los Angeles, CA, US 802 Interim
TGs Waikoloa Closing Report
TGs Dallas Closing Report
Joint Meeting with 802.1AVB Date: Authors: July 2011
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGs Singapore Closing Report
TGn Closing Report – September 24 ‘09
PAR Extension Motions Date: Authors: July 2016 Name Company
IEEE mc Closing Report for September 2016
January 2012 doc.: IEEE /0179r1 Jan 2012
TGae Closing Report – November 2011
TGs San Diego Closing Report
TGax November 2017 Closing Report
Presentation transcript:

HTC 34; 5656 AE Eindhoven, the Netherlands September 2009 doc.: IEEE 802.11-08/xxxxr0 January 2011 P802.11s timelines Authors: Name Affiliation Address Phone email Dee Denteneer Philips HTC 34; 5656 AE Eindhoven, the Netherlands +31 40 2749743 Dee.denteneer@philips.com Discuss TGs timelines, in relation to the timelines of REVmb Dee Denteneer (Philips) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

TGs Timeline, from Doc 11-10/895r6 January 2011 Open Close Fourth recirculation (TGs draft 7.0) 24-Jul-10 12-Aug-10 Professional editing + MEC 30-Sep-10 Pool formation 22-July-10 12-Sep-10 First sponsor ballot 1-Oct-10 1-Nov-10 Second sponsor ballot 13-Dec-10 12-Jan-11 Third sponsor ballot 24-Jan-11 13-Feb-11 Fourth sponsor ballot 1-Mar-11 16-Mar-11 Fifth sponsor ballot 1-Apr-11 16-Apr-11 EC to RevCom Jul-11 RevCom to SB Sep-11 Dee Denteneer (Philips)

TGs Timeline, from Doc 11-10/895r6 January 2011 Open Close Fourth recirculation (TGs draft 7.0) 24-Jul-10 12-Aug-10 Professional editing + MEC 30-Sep-10 Pool formation 22-July-10 12-Sep-10 First sponsor ballot 1-Oct-10 1-Nov-10 Second sponsor ballot 13-Dec-10 12-Jan-11 Third sponsor ballot 24-Jan-11 13-Feb-11 Fourth sponsor ballot -> third 1-Mar-11 16-Mar-11 Fifth sponsor ballot -> fourth 1-Apr-11 16-Apr-11 Fifth Sponsor ballot 1-May-11 16-May-11 EC to RevCom Jul-11 RevCom to SB Sep-11 Dee Denteneer (Philips)

January 2011 Question Are we bold enough to claim that recirculation 5 is the clean recirculation, or do we need to make changes during Recirculation 5, necessitating another recirculation? In the following, I assume that to be the case Also, I assumed that we do not make a recirculation out of this meeting Also this needs confirmation from the TG Dee Denteneer (Philips)

Plan In the following slides we provide a more detailed mapping January 2011 Plan In the following slides we provide a more detailed mapping Depending on 11s completes before REVmb 11s completes after REVmb; for this case, we assume that REVmb completes its clean recirculation by Oktober 17 Goal: to agree on a timeline for discussion with REVmb and the editors meeting Dee Denteneer (Philips)

TGs recirculations; TGs before REVmb January 2011 TGs recirculations; TGs before REVmb Draft 8.0 recirculation completed January 10, 2011 Draft 8.0 Comment Resolution completed February 17, 2011 Draft 9.0 recirculation completed March 8, 2011 Draft 9.0 Comment Resolution completed March 21, 2011 Draft 10.0 recirculation completed April 5, 2011 Draft 10.0 Comment Resolution completed April 18, 2011 Draft 11.0 recirculation completed May 3 2011 Draft 11.0 Comment Resolution completed May 21, 2011 Draft 11.0 Clean recirculation completed June 6, 2011 Dee Denteneer (Philips)

TGs recirculations; TGs after REVmb January 2011 Draft 8.0 recirculation completed January 10, 2011 Draft 8.0 Comment Resolution completed February 17, 2011 Draft 9.0 recirculation completed March 8, 2011 Draft 9.0 Comment Resolution completed March 21, 2011 Draft 10.0 recirculation completed April 5, 2011 Draft 10.0 Comment Resolution completed April 18, 2011 Draft 11.0 recirculation completed May 3 2011 Draft 11.0 Comment Resolution completed May 21, 2011 Draft 12.0 recirculation completed November 2, 2011 Draft 12.0 Comment Resolution completed November 22, 2011 Draft 12.0 Clean recirculation December 7, 2011 Dee Denteneer (Philips)

Scenario 1 January 2011 This corresponds to the following sequence of events, assuming TGs goes before REVmb Scenario 1, current date Recirculations February-May, 2011* Request EC Unconditional Approval to go to Revcom July 2011 Get on September Revcom agenda August/Sept 2011 Revcom approval September 2011 Publication *Note: there is room for some more recirculations to meet the September REVcom agenda Dee Denteneer (Philips)

Scenario 2 January 2011 A speed up was suggested, still assuming TGs goes before REVmb, however, this is ok only with the original timeline Scenario 2, sped up date Recirculation (Draft 9) February 2011 Request EC Conditional Approval to go to Revcom March 2011 final recircs, Draft 10 and 11 April-May, 2011* Get on June Revcom agenda May 2011 Revcom approval June 2011 Publication July 2011 *Note: Fitting in two recirculations plus a clean recirc is very tight. Dee Denteneer (Philips)

Scenario 3 January 2011 REVmb expects to complete Comment Resolution by 17 Oktober 2011, so if we go after REVmb Scenario 3, 11s after REVmb date Recirculations February-May 2011 REVmb and 11s Request EC Conditional Approval to go to Revcom September 2011 final recirculation REVmb completed 17 Okt 2011* Final recircs 11s 18 Okt. – 7 Dec. 2011** Revcom approval of REVmb November 2011 Revcom approval of 11s February 2011 With this completion date, REVmb gets on the November REVcom agenda; TGs will meet the Feb. 17 deadline to be on the february REVcom agenda Dee Denteneer (Philips)

Conclusion In the best estimates: January 2011 Conclusion In the best estimates: Waiting for REVmb will delay publication of TGs from September (June) 2011 to February 2012 According to an analysis by Adrian Stephens, waiting for TGs will delay publication of REVmb from November 2011 to publication in February 2012 Dee Denteneer (Philips)