ArcWorks Process Improvement P08008

Slides:



Advertisements
Similar presentations
HNC/D Business Review Overview, Objectives and Key Tasks David Marshall.
Advertisements

Software Quality Assurance Plan
John A. Bers John A. Bers Associate Professor of the Practice Management of Technology Program Nov. 5, 2003 Vanderbilt University School of Engineering.
Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Potential Sponsor Letter / Example John Smith (Quality Manager), Thank you for your interest in our company. The purpose of this letter is to summarize.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Creating a PMO Charter Dr. Gary J. Evans, PMP
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
MSD-II Project Review Modular Motion Tracking Sensors 1.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Mitun PatelMXP07U. Organisational structure Top management; this includes the organisation’s general manager and its executives Department managers; this.
ERGONOMICS 101 AND INFORMATION SYSTEMS (I.S.). Edit the text with your own short phrases. The animation is already done for you; just copy and paste the.
Presented To: September 9, 2015 CONFIDENTIAL Copyright 2007, TopCoder, Inc. Sean Campion [scamp] 27 June 2007 TopCoder Open, Las Vegas TopCoder Component-Based.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Wayne County High School Interventions for Student Achievement Marlene Griffith Mathematics Department Chair Wayne County High School (912) , ext.
Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations The.
Tools for Bridging the Distance Using Technology in Distance Teams Part 3 of the Distance Series.
Systems Level Design Review P15010: Arc Wheelchair Swing Maggie Bates, Sean Kennelly, Owen Breese, Elizabeth Cutolo.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Total Productive Maintenance (TPM)
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
— Customer Success Team August / 2015 Remedyforce Enablement Kit Migration from CMDB 1.0 to 2.0.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Project Final Presentation Joe Featherall.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
This material is based upon work supported by the National Science Foundation under Award No. BES Any opinions, findings, and conclusions or recommendations.
P11008 ArcWorks Straw Cutting Device May 13, 2011 Ian Balbresky-ME/Pneumatics Lead Tyler Banta-ME/Design Lead Matthew Estock-ISE/Project Manager Mark Vaughn-ME/Fabrication.
EDGE™ Project Status Update P09023 – Air Muscle Artificial Limb Next Generation Jim Breunig (ME)
MGT 437 Week 4 Learning Team Project Planning Human Capital Paper To purchase this material click below link
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
ITEC 630 Final Examination Spring 2015
4.4 Monitor and Control Project Work
Turbomachinery Flow Visualization P08453
C2- How Businesses Use Information Systems
Software and Systems Integration
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
ArcWorks Process Improvement P08008
Copyright Scott Bloss, All rights reserved.
Quality Quality is “a characteristic or attribute of something.”
Software Development Life Cycle
Systems Level Design Review P15010: Arc Wheelchair Swing
EHS beyond Compliance Presenter : Saurabh Srivastava
[Project Name] Project Report
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
SENIOR DESIGN PROJECT P08455
[Project Name] Project Report
CSSSPEC6 SOFTWARE DEVELOPMENT WITH QUALITY ASSURANCE
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
PROCESS TRAINING.
Team Members: Sagar Sheth Leonardo Silva Stephen Bennice
<Project Name> Milestone Summary Report
SENIOR DESIGN PROJECT P08455
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Final Status Update P09006 – Upper Extremity Exerciser
Final Project Plan P09004 – Eye Movement Tracking Device
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Project Iterations.
Project Management Methods
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Driving Successful Projects
Presentation transcript:

ArcWorks Process Improvement P08008 Project Lead: Eric Meinecke (ISE) SD1 start: Winter 2007-2 SD2 start: Spring 2007-3 Thursday, February 21, 2019

Project Review Objective: Develop a method by which the bottle top assembly can be assembled faster and with less ergonomic stress on the user. Also analyze and correct any supply chain issues. Primary/ Secondary Stakeholders: Arc Works of Monroe County, Nelge Nunc, ISE department, ME department, senior design team Staffing Requirements: 3-4 MEs & 1-2 ISEs Past senior design teams: P07008 and P06208 Budget: $1,500 Thursday, February 21, 2019

Update on task being looked at Prior information assumed assembly shown below Actually task is automated the task below with multiple assemblies being performed simultaneously. Thursday, February 21, 2019

Three Week SD1 Plan Thursday, February 21, 2019

Team Values and Norms Current values and norms on EDGE template Fit most of all needs for this project Additional Values/Norms AWARENESS This project requires team members to be conscientious about who they are working for The workers have various disabilities and the high respect must be shown, as well as maturity. A lack of maturity will not be tolerated. Thursday, February 21, 2019

Grading For SD1 and SD2 Thursday, February 21, 2019

Required Resources Thursday, February 21, 2019

Identify Customer Needs 7.1.a 7.1.b 7.1.c Thursday, February 21, 2019

Identify Target Specifications Comply to OSHA Specifications Time to failure of tool Number of defects created Operator touching parts during assembly Number of top sizes accepted Setup time for different size tops Force required to perform task Takt time Can visually tell stage of production of any part Provide Process instructions for product Can count number of assemblies Yes/No # Parts till failure # defects Yes/ No # of tops accepted Seconds Newton's Thursday, February 21, 2019

Risk and Concerns Pneumatics will need to be learned by ME, or an ME with prior experience must be found Was told that pneumatics is not taught in classroom Addressing the needs of each disability Being able to replicate disabilities when testing the tool in SD2. Thursday, February 21, 2019

Outstanding Items Confirm availability of space in Ergonomics lab, TPS Lab, and also possible SD floor space Review needs hierarchy with Dr. Marshall, and then John Syrkin Schedule appointment for SD team to have a walk through at ArcWorks during first week of SD1. Thursday, February 21, 2019