PC21 Coal Retirement Study

Slides:



Advertisements
Similar presentations
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Advertisements

Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Rocky Mountain Area Transmission Study RMATS Economics Reference Cases Economic Comparisons Distribution of Economic Gains and Losses RMATS Steering Committee.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Data Work Group(DWG) TEPPC 2026 Common Case - Fuel Prices November 17, 2015 Jamie Austin, PacifiCorp.
Fuel Prices TEPPC 2026 CC Data Work Group January 26, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Contents Introduction Focus area Wind scenarios
Integrated Resource Plan 2016
4/23/2018 Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration 1 - Define Congestion.
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
What is POWERBALANCE?.
2017 Integrated Resource Plan
Outline Background Study Assumptions Study Results To Do
Zonal Electricity Supply Curve Estimation with Fuzzy Fuel Switching Thresholds North American power grid is “the largest and most complex machine in the.
Teaching The Duck To Fly
Keegan Moyer Interim Manager, Transmission Expansion Planning
Solar Eclipse Overview August 2017
MIT tour of the California ISO Control Center March 31, 2015
Key Findings and Resource Strategy
Reliability Assessment Committee Reliability Workshop Priorities
June 2018 Arne Olson, Senior Partner Kush Patel, Partner
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Western Electricity Coordinating Council
Patrick Cummins January 30, 2019.
RE Grid Integration Study with India
New England Electricity Restructuring Roundtable September 18, 2009
Byron Woertz, Manager—System Adequacy Planning
Study Results PC8-PC16 System Stress Tests
Tyler Butikofer, WECC Tom Carr, WIEB
Scenario Development Subcommittee January 4, 2018
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Byron Woertz, Manager—System Adequacy Planning
Study Results Drought Scenario Study
PDWG Validation of the 2028 ADS PCM V1.0
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

PC21 Coal Retirement Study TAS/TEPPC – Nov. 2015 WECC System Adequacy Planning Western Electricity Coordinating Council

Western Electricity Coordinating Council Study Requestors Center for Energy Efficiency and Renewable Technologies (CEERT) Natural Resource Defense Council (NRDC) PacifiCorp (PAC)* State and Provincial Steering Committee (SPSC) Scenario Planning Steering Group (SPSG) Western Grid Group (WGG) Western Interconnection Regional Advisory Body (WIRAB) *PAC later withdrew from study request when scope was changed to indefinitely postpone a reliability analysis. Western Electricity Coordinating Council

Western Electricity Coordinating Council Overview Study Description Scope Input assumptions Study qualifications Study Results Details Generation Paths Other Observations Western Electricity Coordinating Council

Western Electricity Coordinating Council Study Description Western Electricity Coordinating Council

Study Description - Purpose Model a scenario that approaches the 2024 trajectory of reducing carbon emissions to 80% below the 2005 levels by 2050. 248 in 2024 This trajectory has a 34% reduction by 2024 and a 44% reduction by 2030. Western Electricity Coordinating Council

Study Description - Assumptions Modeling assumptions include: Retirement of several high CO2 intensity coal-fired generators based on vintage and location Addition of renewable resources (wind + solar) Additional energy efficiency Addition of gas-fired generation Addition of energy storage resources More details on next slides Western Electricity Coordinating Council

Western Electricity Coordinating Council PC21 Additional Coal Retirements AB AZ CA CO MT UT WY Battle River 4,5 [537] Apache 2,3 [350] ACE Cogen [103] Comanche 1,2 [660] Colstrip 1,2,3 [1354] Huntington 1,2 [909] Dave Johnston 1-4 [762] Genesse 2 [390] Cholla 1,3 [387] Argus 8,9 [50] Craig 1,2 [863] Intermountain 1,2 [1800] Jim Bridger 1,2,3 [1581] Sheerness 1,2 [780] Coronado 1 [380] Casterville [1] Hayden 1,2 [446] NM KUCC 1-4 [175] Naughton 1,2 [357] Sundance 3 [362] H.W. Sundt 4 [156] Fellow M Drake 5,6,7 [254] Four Corners 4,5 [1540] Sunnyside [53] Neil Simpson 2 [80] Navajo 2,3 [1500] Jackson Valley [21] Nucla 1-4 [100] Wygen 1,2 [180] Lassen [22] R D Nixon 1 [208] NV WA Wyodak [340] Mt Poso [35] N Valmy 2 [268] Centralia 2 [688] Phillips Carbon [16] TS Power 1 [227] Portland Cement [28] Port of Stockton [44] Western Electricity Coordinating Council

Western Electricity Coordinating Council PC01 Common Case Coal Retirements [6418 MW] AB AZ CA CO MT UT WY Battle River 3 [148] Cholla 2 [262] RioBravo Jasm [35] Arapahoe 3,4 [153] JE Corette [153] Carbon 1,2 [172] Neil Simpson 1 [18] HR Milner [144] Four Corners 1-3 [560] Cherokee 3 [152] Osage 1-3 [30] Sundance 1,2 [576] Navajo 1 [750] Lamar 4,6 [38] NM Valmont 5 [184] San Juan 2,3 [839] WN Clark 1,2 [40] NV WA Reid Gardner 1-4 [587] Centralia 1 [688] Valmy 1 [254] OR Boardman [610] Western Electricity Coordinating Council

PC21 Coal Retirements by State/Province These are summations by state/province of the capacity and energy from the PC01 Common case v1.5. The lower capacity factor of the Utah retirements is related to the direct impact of AB32 on the Intermountain Generating Station. Western Electricity Coordinating Council

Western Electricity Coordinating Council Replacement Sources The Retired MWh represents the energy produced by the PC21 retired coal resources in the 2024 v1.5 common case. The EE energy was modeled as a load reduction and resulted in a total reduction of about 1700 GWh. The estimated energy values for CC, CT, and ES are based on the assumed capacity factors in the bottom table. Note that the replacement assumptions only replace 53% of the energy that was retired. Will there be any unserved load? Western Electricity Coordinating Council

Western Electricity Coordinating Council Study Qualifications Path Ratings: The WECC paths associated with a few of the retired generators and their replacements would likely need to be re- rated through the path rating process. No changes in path or branch ratings were assumed for this study. Constraints: Other operating constraints and nomograms were also not modified. Flexibility Reserves: The flexibility reserve adders for each reserve area are derived from the loads and amount of variable generation. The flexibility reserve adders were not recalculated for this study. Resource Adequacy: A check of the peak planning reserve margins was not done. System Stability: Tests of system stability were not conducted. Western Electricity Coordinating Council

Western Electricity Coordinating Council Results Western Electricity Coordinating Council

Western Electricity Coordinating Council Dump Energy Generation that is chosen by the PSM model for commitment and dispatch for a least-cost solution may be dumped if its dispatch will break a modeling constraint regarding generation, transmission, reserves, and/or nomograms. Reserves Nomograms Cost Deliverable Constraints Western Electricity Coordinating Council

Western Electricity Coordinating Council From New Gen 269,923 2,409,645 1,801,747 Load side 18,820,604 38,636,263 61,938,182 -1,731,070 This is a summation of the annual generation by category for the PC01 (common case) and the PC21 (coal retirement case), showing the differences between the two cases. The table on the right (blue heading) provides the portion of the change that came from the PC21 replacement resources. Keep in mind that additional EE was applied to reduce the loads in AZ, NM, NV, UT, and WA. 629,356 Western Electricity Coordinating Council

Category Change – Estimated/Actual This is a graphical comparison of the change for a few categories relative to the PC21 replacement units and the PC01 units that were carried forward. The floating blue marker shows the estimated energy for the replacement units; the red bar shows the resultant energy from the replacement units; and the green bar shows the change from the “carried forward” units. Western Electricity Coordinating Council

Western Electricity Coordinating Council

Generation Comparison Western Electricity Coordinating Council

Difference in Annual Energy - WECC Western Electricity Coordinating Council

2024 CO2 PC21 Coal Retirement Case Western Electricity Coordinating Council

Generation Change by State and Fuel Provides the changes from the retirements, the replacements, and the redispatch. Western Electricity Coordinating Council

Western Electricity Coordinating Council

Western Electricity Coordinating Council The chart shows the relationship of the pump storage operation with the LMP price. Negative denotes pumping and positive denotes generating periods. This was the only replacement ES unit that had any significant operation. The others didn’t seem to reach the price thresholds. Western Electricity Coordinating Council

Western Electricity Coordinating Council WECC Paths Western Electricity Coordinating Council

Top 15 Heavily Utilized in PC21 General practice is to ignore paths 52 and 60 since they are low voltage and controllable via phase shifters. The minor congestion on path 83 is from Alberta to Montana. Western Electricity Coordinating Council

Comparison of Net Annual Flow – Top 15 U90 Note that a few paths had a reversal of net annual flow. Western Electricity Coordinating Council

PC-21 Heavily Utilized Paths P83 Montana Alberta Tie Line Path 75% 90% 99% P60 Inyo-Control 115 kV Tie 38% 25% 18% P52 Silver Peak-Control 55 kV 34% 23% 0% P83 Montana Alberta Tie Line 20% 11% 7% P52 Silver Peak-Control P60 Inyo-Control Western Electricity Coordinating Council

Western Electricity Coordinating Council Path 8 The retirement of the base load generation at Colstrip 1,2,3 had an impact on the Path 8 flows. It is also possible that the path rating would be reduced. Western Electricity Coordinating Council

Western Electricity Coordinating Council Path 65+66 (COI plus PDCI) Western Electricity Coordinating Council

Western Electricity Coordinating Council Path 27 In the past a nomogram has been used to define a relationship between generation and path 27 flows. The nomogram was not modified to specify how the replacement generation in Utah would be treated with respect to southern California. Western Electricity Coordinating Council

Western Electricity Coordinating Council Path 46 Western Electricity Coordinating Council

Western Electricity Coordinating Council More Results Western Electricity Coordinating Council

Western Electricity Coordinating Council WECC Peak Week Interesting here how much the simple-cycle combustion turbines were dispatched. Next slide shows the percentage breakdown for the peak hour. Western Electricity Coordinating Council

Western Electricity Coordinating Council WECC Peak Hour – PC21 Western Electricity Coordinating Council

Western Electricity Coordinating Council WECC Early April Windy month. A lot of ramping of base-load coal units. Late peaks = 8:00 pm or 9:00 pm Western Electricity Coordinating Council

Western Electricity Coordinating Council Dump Energy 4/7/24 – PC21 Western Electricity Coordinating Council

Peak hour on April 2 – WECC PC21 Western Electricity Coordinating Council

Western Electricity Coordinating Council California Peak Week Western Electricity Coordinating Council

California Early April The dump energy here is likely from over-generation due to must-take generation and generator constraints in California and also in the interconnected regions. The gaps between the demand and generation represent energy imports. The hours where the generation exceeds the demand represents exports. Western Electricity Coordinating Council

Western Electricity Coordinating Council Imports are negative; exports positive. Western Electricity Coordinating Council

Western Electricity Coordinating Council Observations The PC21 study had no unserved load. PC21 CO2 was 29 million metric tons short of goal Overall energy from PC01 CC and CT units increased Overall energy from remaining coal units increased Share of annual energy from renewable resources is 23.1% in PC21 vs. 17.7% in PC01 Poor performance of PC21 pump storage projects except for project added in SRP area Western Electricity Coordinating Council

Western Electricity Coordinating Council Contact Stan Holland Western Electricity Coordinating Council Senior Engineer stan@wecc.biz (801) 883-6858 Western Electricity Coordinating Council