0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Transmission Workstream 6 January 2011
EU Tariffs Code Update Based on Refined Draft as of 30th October
Entry Capacity Overrun price calculation
Modification Proposal 0283 Update
User Pays Funding – Potential Licence Mechanism
Transmission Workstream, 01 October 2009
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workstream 4th July 2007
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Trader User – Licence obligations
Proposer: National Grid NTS Panel Date: 17th April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
Assignment of NTS Entry Capacity – Background and UNC Obligations
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Modification 0117 – Additional Considerations
Publication of Zonal Flex Data
Transmission Workgroup June 7th 2012
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
UNC Modification Proposal 0201 National Grid Distribution
DSC Credit Committee DSC Credit Committee – Present
MOD Deemed applications – User pays initial thoughts.
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream – Partial Assignment
Proposed Transitional Gas Exit Arrangements
Entry Overrun Calculation
Reinstatement of NTS Interruption
Review Group 0334 User Pays update – Modifications 288, 289, 290.
Transmission Workstream - EU 3rd Package Update
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
Transmission Workstream 1st February 2007
Stefan Leedham Transmission Workstream 2nd November 2006
Review Group 221: Review of Questions from Session 2
Offtake Workstream : 19 March 2012
Assignment of NTS Entry Capacity – Work currently being Undertaken
Assignment of NTS Entry Capacity – Previous Work Undertaken
Transmission Workstream, 1 Mar 07
Transmission Workstream 4th December 2008
Transmission Workstream 05 November 2009
Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix.
Gas Customer Forum 28 July 2008
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley

0332 Removal of a users ability to allow Quarterly NTS Entry Capacity to lapse Modification Proposal 0332 was discussed at the October Transmission Workstream 0332 has been amended to reflect discussions at October Workstream and other feedback received NTS were also asked to consider the implications of looking at a User’s exit and entry capacity credit position at the same time and to present back to the November Workstream

Combining exit and entry credit checks – NTS Analysis Analysis has been carried out to assess the impact of combining the entry and exit credit processes Estimated Exit Capacity Charges 2012/13 Current entry capacity charges The revised level of credit has been calculated in accordance to Section V (exit capacity credit process). Results are a rough estimate

Analysis Results 44 active Entry Shippers 2 Shippers will be affected by exit reform and required to provide additional credit/security to National Grid NTS 4 Shippers (9%) would be required to provide extra credit/security if the 2 credit processes were combined £14.75m in total* Is there a benefit of combining the 2 credit processes? * The cost of providing this additional credit/security depends on which tools are used by the affected shippers