APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)

Slides:



Advertisements
Similar presentations
Mercury Quality Center 9.0 Training Material
Advertisements

ILD Quality Center Overview.
What is Test Director? Test Director is a test management tool
IOTAP Software Build Process Author: Aman Choudhary Draft Version – Work In Progress.
Performing Test Best Practices By Gabriel Rodriguez.
Copyright © 2006 Help Desk Systems, Inc. All rights reserved. Overview of Help Desk Systems Inc. (HDSI) HDSI offers a hosted, web based trouble ticket.
Program Management Portal: Overview for the Client
KX-TVM50 KX-TVM200 V2.0 (Edition 1.1 2nd November, 2007)
Defect Tracking and Management
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
HP Quality Center Overview.
Lesson 17: Configuring Security Policies
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Mercury Quality Center Formerly Test Director. Topics Covered Testdirector Introduction Understanding the Testdirector Interface. Understanding Requirement.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Introduction to Hewlett Packard (HP) Application Lifecycle Management.
Maintaining and Updating Windows Server 2008
Testing in SDLC. COURSE CONTENT - Summary Part 1 – Life Cycle / Processes / SDLC Part 2 – LC Management in Turkcell.
Module 16: Software Maintenance Using Windows Server Update Services.
QC 9.2 Prepared By  Sriraman K. 2 Objectives Test Management Tool – What, Why, Benefits etc To make participants aware of Test Process and controlling.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
Software Enhancements Operations keeps the lights on, strategy provides a light at the end of the tunnel, but project management is the train engine that.
VERSION 7 What’s to Come?. Workflow – Lifecycle Definition  Ability to define custom Lifecycles NEW BEING WORKED IN REVIEW WAITING FOR APPROVAL APPROVED.
Learn & Master - HP Quality Center Certification Exam Code HPO-M15
Software Testing Life Cycle
Web Based Inventory Site Building Room Asset Number Category Type Description Serial Number Manufacturer Model Vendor Name Acquired Date P O Number Budget.
DMS Training 2017年4月22日(土) Instructor:
Software testing basic. Main contents  Why is testing necessary?  What is testing?  Test Design techniques  Test level  Test type  How to write.
1 Copyright ©2004 TAC. 2 T-WorMS Adding Sanity to Your Process Jamie L. Mitchell CTO TAC.
Introduction to Quality Center
RMsis – v Simplify Requirement Management for JIRA.
Introduction to Test Director
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
RMsis – v now with JIRA 5.0 support Simplify Requirement Management for JIRA.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
Authored by Frank Hamelly, Microsoft MVP Regional Chapters.
Maintaining and Updating Windows Server 2008 Lesson 8.
Software Testing-STLC
Target Audience All QA members Objective: This presentation aims to deliver the following: Writing Test plans. Managing test cases repository as per.
SOFTWARE TESTING TRAINING TOOLS SUPPORT FOR SOFTWARE TESTING Chapter 6 immaculateres 1.
Source-to-Pay (S2P) Initiative Coupa Supplier Network Training
(Required for DTCs, Recommended for STCs)
Architecture Review 10/11/2004
Introduction to the new robust security system from SCC.
SaralTA Batch-07 Software Testing Presented By - Chittaranjan M.
Essentials of UrbanCode Deploy v6.1 QQ147
James Blankenship September , 2016
James Blankenship March , 2017
TurnKey Lunch and Learn: ALM/UFT Best Practices
Get to know SQL Manager SQL Server administration done right 
Basics and Navigation Module 2.
Web-based MAP Help-Desk Training From the Technical Consulting Group
Software Testing With Testopia
UNIT-1 SOFTWARE TESTING FUNDAMENTALS
RemoteLaunch - Overview
Quality Center, QuickTest Pro 10
UNIT-1 SOFTWARE TESTING FUNDAMENTALS
Engineering Processes
Introduction to Software Testing
Quality Center (QC) 11 Training Global IT QA Testing Team 2013
MAX Warranty Tracking Vince Stefanetti, Exact MAX Americas Trainer.
Exploring the Power of EPDM Tasks - Working with and Developing Tasks in EPDM By: Marc Young XLM Solutions
Distributor Want aka. Dis-WAnt
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
LESSON 01 Hands-on Training Execution
HP ALM Test Lab Module To protect the confidential and proprietary information included in this material, it may not be disclosed or provided to any third.
HP Quality Center 10.0 The Test Plan Module
Testing Workshop.
T-FLEX DOCs PLM, Document and Workflow Management.
Presentation transcript:

APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC) Consult America Technology Consulting Services

ALM /QC What is software testing? Why testing is important? Software testing is a process to identify and correct/fix any bugs/problems of an application or software. In other words, software testing is an activity to check whether the actual results match the expected results and to ensure the software is bug free. Why testing is important? Software testing is very important because of the following reasons: To point out the defects and errors that were made during the development phases. To make sure of the Customer’s reliability and their satisfaction in the application. Testing is required for an effective performance of software application or product. It’s important to ensure that the application should not result into any failures because it can be very expensive in the future or in the later stages of the development.

ALM /QC What is manual testing ? What is the goal of manual testing ? Manual testing is the process of manually testing software for defect. What is the goal of manual testing ? The goal of manual testing is to ensure that the application is error free and is working according to the functional requirements. Functional requirements means a requirement that is created for functional element. i.e.: there is no start menu in windows 8 version. So the start menu should be implemented in the next version of windows 10. so, building start menu is the main functional requirements of SDLC.

ALM /QC What is Quality Center? HP Quality Center, a test management tool is now popularly known as Application Life Cycle Management Tool(ALM) as it is no longer just a test management tool but it supports various phases of the software development life cycle such as-  Planning (initiation & requirements)  Design  Development  Integration & testing  Implementation (production)  Operations (maintenance & disposition)  User Acceptance Testing (UAT) happens after production

ALM /QC History of QC? Quality Center was formerly known as Test Director, a product of mercury interactive. The below table provides us a better insights about the version history of QC:

ALM /QC What is ALM? Application Lifecycle Management refers to the capability to integrate, coordinate and manage the different phases of the software delivery process. From development to deployment, ALM is a set of pre-defined process and tools that include definition, design, development, testing, deployment and management. Throughout the ALM process, each of these steps are closely monitored and controlled.

ALM /QC Modules in ALM: Different roles of manual tester:  Requirement: To track the customer requirements  Test Plan: To store the test scripts and design the test cases  Test Lab: To track the results and execute the test cases  Defect: To track down the logged defects and log a defect Different roles of manual tester: There are 3 different roles of manual tester: 1. Site Admin: Site Admin is the actual owner. He can create Project Admin ,user. He can do anything like create, update, delete etc 2. Project Admin: Project manager is the Project Admin. He is assigned by the site admin for any individual project. He controls or owns project. A PA does not have the same privileges as Site Admin but he is admin of his project. 3.User: QA testers are assigned as user. They are like regular users. They have limited privileges. He can create certain things or do certain things that a PA gives him a permission to do. They are also responsible for creating test cases, test plans and execute the test, generating reports and retesting if needed.

ALM /QC As A Site Administrator: Installed Quality Center/ALM Software  Create Domain-PIIT_TRAINING  Create Project- PIIT_FORUM  Activate Project  Create Users for Quality Center/ALM  Assign Users to the Projects  Create Project Admin or making user as Project Admin for the Projects  Create Password for the Users  Delete User  Create a User as a Site Admin  Configure Wait Before Disconnect features  Configure Mail Interval.  Configure Mail Format.

ALM /QC As A Project Administrator:  Change Password  Setup / Assign User to the Project  Create New Users for a Project  Add Existing user to the project  Assign default Role / Privilege (TD Admin, Developer, Project Manager, QA Tester and Viewer) to the user.  Set-up Groups / Create New Group role like Test Manager, Business Analyst, Test Lead, Configuration Manager, Program Manager etc.  Change permission of the New Role  Add Users to the New Role  Customized Project Entities- Defect field customization i.e. making a field as a required field like making ‘Assigned to:’ field as required field  Making ‘Status’ field as required field and adding statuses like ‘Fixed- Ready For Retest’, ‘Deferred’, ‘In Development’, ‘Retest Passed’, ‘Retest Failed’, ‘Works As Designed’ etc.

ALM /QC As A Project Administrator:  Create new Project Lists i.e. Test Environment (DEV, ALPHA, BETA, PROD, QUAL, UAT) in defect window.  Create new user field i.e. Test Environment (DEV, ALPHA, BETA, PROD, QUAL, UAT) in defect window.  Create new Project Lists i.e. Putting Issue Type (Defect, System Change Request, Suggestions/Comments) in the Defect section.  Create new user field i.e. Putting Issue Type (Defect, System Change Request, Suggestions/Comments) in the Defect section.  Adding new items in the Project Lists i.e. add new sub-items in the Software item of Requirement Type field (Functional, Non-Functional, Software Change Request, Performance and UAT) etc.  Configuring Auto Mail

ALM /QC As A Project Administrator: Set Traceability Notification/Alert Rules Traceability Notification Rules:  Rule#1: When a requirement changes, notify the Designer(s) of the associated test(s).  Rule#2: When the status of a defect changes to ‘Fixed’, notify the Responsible Tester of the associated test instance.  Rule#3: When a test runs successfully, notify those ‘Assigned to’ the associated defects.  Rule#4: When a requirement changes, notify the Designer(s) of the associated test(s) and all users.

ALM /QC As A USER:  Change Password  Create Requirement folder in the Requirement section (Parent requirement)  Create Child Requirement folder in the Parent Requirement section  Enter Requirements in the Child Requirement folder  Install Excel Ad-ins  Prepare excel sheets for Requirements to export in the Requirement field  Export Requirement using Excel in the Requirement folder  Convert Requirements from the Requirement section to test in the Test Plan section  Develop Design Steps or Test Cases in the Test Plan section  Attach the Screen Shot / Documents for the steps, if necessary , for instanceTest Data needed like user id, password, doc, gif, jpg, jpeg, pdf, png, txt, zip, rar, exe.

ALM /QC As A USER:  Call Template to the tests  Calling a manual test with parameters  Perform Requirement Coverage / Traceability or Linking Test to Requirement in the Test Plan section.  Prepare MS Excel sheets for design steps to export in the Test plan section  Export Design Steps to export in the Test Plan section  Create Test Sets in the Test Lab section  Import test cases in the Test Set  Execute Test Sets in the Test Lab section  Log Defect in the Test Lab section  Log Defect in the Defect section  Attach the Screen Shot as an attachment for the Defect

ALM /QC As A USER:  Attach the Screen Shot using snapshot for the Defect  Track / Filter Defect in the Defect section  Enter comments in the comment section after re-testing the Bug like ‘Retest passed’ recommending to close this Defect or Re-test Failed, recommending to Re-open the Defect.  Bug Life Cycle  Generate Graph and Reports in the Requirement section  Generate Graph and Reports in the Test Plan section  Generate Graph and Reports in the Test Lab section  Generate Graph and Reports in the Defect section-copy the graph and use it in the TAR-Test Analysis Report document  Schedule automated test to execute or running automated test scripts in batch mod

ALM /QC Bug Life Cycle: Definition: •Bug: Bugs are errors/flaws that are found prior to production. •Defect: Defects are errors/flaws that are found after the production. Stage of bug life cycle:

ALM /QC URL (Uniform Resource Locator): URL is an acronym that stands for Uniform Resource Locator and is a reference (an address) to a resource on the Internet. localhost : localhost is a hostname that means this computer. It is used to access the network services that are running on the host via its loopback network interface. a localhost is always designated as 127.0.0.1.

THANK YOU