Institutionalizing the Business Planning strategy in Water Utilities of the Montenegrin Coast 18 May 2017, Vienna.

Slides:



Advertisements
Similar presentations
Governance of Disaster Reduction Priorities and Organizational Arrangement for the Implementation of HFA Martin Owor Assistant Commissioner Head of Disaster.
Advertisements

MRC Strategic Plan. Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain.
WATER REGULATORY AUTORITY OF ALBANIA ARJAN JOVANI, VICE – CHAIR OF NATIONAL COMMISSION OF W.R.A FLORENCE, 28 NOVEMBER 2013 OVERVIEW ON ALBANIAN WATER SECTOR.
Illinois RC & D Introduction to R esource C onservation & D evelopment Module 2: Who are the players?
MAKING USE OF IPA IN CROATIA – OPERATIONAL PROGRAMMES UNDER COMPONENTS III AND IV 13 November 2007.
Public Utility for water supply and sewage „Naissus“ Niš City of Niš, Serbia Local governments: helping each other?
Build and maintain democratic and decentralized local government institutions that are capable to participate in the development of social and economic.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
NAVIGATING THE WATERS: USING ASSESSMENT TO MAKE A DIFFERENCE Amy Harper, Area Coordinator, Fordham University Greer Jason, PhD, Assistant Dean of Students,
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
0 Kestutis Rekerta Strategic Planning Division, Government Office of Lithuania World Bank Workshop, Bratislava, September 6, 2006 STRATEGIC PLANNING IN.
Alexander Martusevich, Environment Directorate Env&Globalisation Division National policy Dialogue on Financing Strategy for Rural Water Supply and Sanitation.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
National Development Plans Review Saudi Arabia 3 rd and 7 th National Development Plans For: Professor Habib Alshuwaikhat By: Ahmad A. Alkadi CP202 – Planning.
ORGANIZATIONAL DEVELOPMENT GROUP FOR CAPACITY DEVELOPMENT IN SWHISA CONTEXT B.D June 2006 H.R.D I.D O.D.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
MONGOLIA MONGOLIA Urban Sector Operation 4 June 2014 Tuul Badarch, Senior Project Officer (Infrastructure) Mongolia Resident Mission Asian Development.
The implemented reforms and progress on developing a strategy for the WSS sector in Armenia The implemented reforms and progress on developing a strategy.
14/10/2015European Agency for Reconstruction1 Water & environment.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
WATER AND SANITATION SECTOR (WSS) IN ESTERN EUROPE AND CAUCASUS Strategic Approach of KfW Development Bank Dr. K. Gevorgyan KfW Representative in Armenia.
Priority Environmental Investment Programme (PEIP) – CARDS Regional Regional Meeting for Senior Officials from SEE and Donors’ Community 19-20th June Budva,
Egyptian Environmental Affairs Agency Nature Conservation Sector CBD.
Working Group on Training: From Challenges to Opportunities Vienna, May With the financial support of:
The World Bank’s Experience with Country Environmental Analysis (CEA) Sub-Regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
The implementation programme for the 2008 SNA and supporting statistics UNSD-Regional Commissions Coordination Meeting on Integrated Economic Statistics.
Priority Environmental Investment Programme National Workshop Montenegro Priority Water Projects on the PEIP List Budva, 13 th May 2008 Ruslan Zhechkov,
National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON SPORT AND RECREATION MUNICIPAL INFRASTRUCTURE GRANT By Molatelo Montwedi Date: 14 June 2005.
ORGANIZATION CAPACITY ASSESSMENT (2013) Produced in April 2013.
Strategic approach to national implementation programmes for SEEA by UNSD Sixth Meeting United Nations Committee of Experts on Environmental Economic Accounting.
2016 SWA Meeting of Ministers of Water, Sanitation and Hygiene: Technical Meeting Addis Ababa, Ethiopia, 17 March National accountability mechanisms in.
Chapter 5 5 Planning C H A P T E R. Outcomes Differentiate between strategic planning and master planning. Understand the strategic and master planning.
MONTENEGRO Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change Bilateral.
Ministry of Regional Development and Public Works Vienna May 2016 Water and Sewerage Sector in Bulgaria Challenges and Vision.
1 Financing in water sector - times of change Antti Tooming Ministry of the Environment / Water department, Head of Project bureau 19/05/2016.
SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING AND RESULTS SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING.
Case study of Velika Kladusha (B&H), Lipjan (Kosovo) and Kochani (Macedonia) Vienna, 13 May 2016.
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
Danube Water Conference 2017, Vienna
Donor Coordination Process
Local Leaders in South East Europe: Lead for Change
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
TRADITION OF IGNORING CONTINUOUS NON-REVENUE WATER MANAGEMENT IN WATER UTILITIES IN SOUTH-EAST EUROPE Vienna, 13 May 2016.
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
Pacific Region Infrastructure Facility
Utility Benchmarking for Improvement
Danube Water Conference, Vienna, May 2017
WATER SUPPLY & SEWERAGE AUTHORITY Bethlehem-Biet Jala-Biet Sahour
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Use of National Strategies for the Development of Statistics
The EU WATER POLICY.
progress of the water reform in bulgaria
Strategic Boards Toolkit
Importance of Law and Policies in the Environmental Management System
Organisational NRW Management
North Iowa Community Action
Perspectives on Financing of Water Services
Association for Water and Environmental Protection Sector
Instrument za pretpristupnu pomoć
Mandate of Department of International Cooperation and European Integration MGSC March 2013.
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
IMPLEMENTATION PROGRAMME OF SNA 2008 (Dominica)
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
ZIMBABWE - VISION Focus for
Director-General: Mr. E Africa
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Presentation transcript:

Institutionalizing the Business Planning strategy in Water Utilities of the Montenegrin Coast 18 May 2017, Vienna

Water Supply and Sanitation Adriatic Coast Project GoM KfW € 127 mil. loan € 19 mil. grant

Vodacom’s role in the Project Agency for implementation of infrastructural projects in water and waste water sector on the Montenegrin Coast Coordinator for raising organizational, technical and financial efficiency of the local water utilities

V Phases of the Project Infrastructure Investments Institutional capacity development Providing proper wastewater disposal system for the purpose of long term economic development and particularly tourism development Rehabilitation of existing and construction of new water supply systems so as to raise the quality of services that local water utilities provide to citizens and businesses Approximation to EU standards in the field of environmental protection

First capacity development program in 2006 Situation analysis WUs prepare only annual plans No decision making No systematic data collection-poor quality of data No action plans Resistance of management and sector to make long term plans Lack of controlling system No monitoring system by shareholders (Municipalities) First capacity development program in 2006

Vodacom as a coordinator Big investments should be made in water sector Capacity improvements of WUs were needed Employment structure Financial analysis Tariff structure Technical improvements Management of WUs Vodacom as a coordinator

Institutional capacity development Business Planning Institutional capacity development Commercial Efficiency Leak detection/ Reduction of NRW MIS Reporting/ Benchmarking Financial Management Accounting PR/Customer Relations Campain Operation and Maintenece

What is the Purpose of a Business Plan for the WUs? Strategic document Management tool for making decisions Defining the shortcomings of performance Pursuing defined goals and acivities Possibility to identify problems at an early stage Financial plan Investments plan Tariff adjustmensts Action plans Monitoring aspect

Vodacom as a coordinator Actions Form working group in each WU Coordination of activities Tariff adjustments Investment plans Improving communication between local governments and their water utilities regarding planning and implementation of investment priorities Difficulties Animate WU to make decisions, goals BP Define mission and vision of WUs Define strategic goal Develop a detailed action plans for each sector Monitoring Make BP as annual activity

Producing 3-5 year Business Plans serving as a company management tool for Vodacom and WUs Training staff to produce Business Plans through defining measures and activities for the planned period in order to implement defined goals Monitoring carried out activities defined by the BP Regular annual update of the BP by the management of the WU in coordination with Vodacom

Results Made guide for updating of BPs Financial model for financial planning Changed management staff of WUs Changed tariffs for water and wastewater services Reduction of NRW Improved collection and billing rates Trained staff Established monitoring system Ongoing support by Vodacom to five WUs

Monitoring of Business Plan Periodic monitoring Where are we? Achieved results Deviations (deviations from planned results/defined goals) What can be done to achieve desired results?

Monitoring of Business Plan_WU Kotor

Monitoring of Business Plan_WU Kotor Konto TROŠKOVI PLAN ZA 2014 UKUPNO OSTVARENO (jan-jun) OSTVARENJE % 52 Troškovi zarada, naknada zarada i ostalih ličnih rashoda 1,149,118.29 548,801.13 48% 520 Troskovi zarada i naknada zarada 999,168.29 475,102.01 521 Troškovi poreza na zarade i naknade zarada na teret poslodavca 128,000.00 62,046.87 522 Troškovi naknada po ugovoru o djelu 1,800.00 622.60 35% ? 526 Troškovi upravnog odbora 9,600.00 4,592.16 529 Ostali lični rashodi i nadoknade 10,550.00 6,437.49 61% Konto TROŠKOVI PLAN ZA 2014 UKUPNO OSTVARENO (jan-jun) OSTVARENJE % 51 Troškovi materijala 333,865.20 115,401.21 35% ? 511 Troškovi materijala za izradu 79,865.20 39,861.33 50% 512 Trošak kancelarijskog materijala, rezervnih djelova i sitnog inventara 13,000.00 3,888.02 30% 513 Troškovi električne energije i goriva 241,000.00 71,651.86 513000 Električna energija 200,000.00 56,950.49 28% 513300 Troskovi goriva 41,000.00 14,701.37 36%

Outcomes

Thank you for your attention Thank you for your attention! “Let’s take initiative ourselves to make improvements, rather than waiting to be led by others.” Sanja Bujisa Financial Analyst, Vodacom d.o.o., Tivat sanja.bujisa@vodacom.co.me www.vodacom.me