Addressing Highest Priority Facility Needs

Slides:



Advertisements
Similar presentations
MACCRAY Elementary Facilities Update meeting Tuesday, June 25, Maynard Community Center, 7:00 pm Wednesday, June 26, Raymond Community Center, 7:00 pm.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
1 Zero Tax Increase Referendum: Community Information Session.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Cathedral of the Immaculate Conception Project Information Session.
Bronze Award: Library/Media Center
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Summer DEPARTMENT ORGANIZATION Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental Management 2.3 millionsquare.
Blissfield Community Schools Strategic Plan Facilities Team.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Bartholomew Consolidated School Corporation Additions and Renovations to Columbus East and North High Schools Additions and Renovations to Columbus East.
SCHEMATIC DESIGN PRESENTATION
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Learning, Health, and Safety Capital Project Alternates and Change Order
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Facilities Focus Group
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Building Services Summer 2016 Update
OABCIG General Obligation Bond Referendum Presentation
Capital Projects Requests
Addition of Fire Alarm system. None existing.
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
UNION GROVE ELEMENTARY REFERENDUM
Troy School District Bond Program – Series 1 Construction Update
2018 Bond Review and Proposal
2007 Bond Issue Capital Improvement Program
CV Futures Task Force Report May 8, 2017
Building & Property Committee
Charter Oak Unified School District
Capital Outlay Workshop
Facility Advisory Committee Meeting
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Stoughton Public Library
EAST PENNSBORO AREA SCHOOL DISTRICT
Dixon Middle School Project Update
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

Addressing Highest Priority Facility Needs 2013 Facility Improvements Proposed Facility Improvements 1028 Hearing April 8, 2013 Maintaining our Facilities: Addressing Highest Priority Facility Needs

CSA Fodrea Renovations 2013 Facility Improvements CSA Fodrea Renovations Project Scope and Priorities: Improve building security Convert community room and old office area on second floor to two classrooms Renovate media center and music room Renovate student restrooms Convert two first floor classrooms to Pre-K classrooms Add small restrooms for Pre-K Renovate and add staff restrooms Add ramp for access at gym floor level Add entrance canopy Bid Alternates: Renovate cafeteria CPF Work: Replace two rooftop HVAC air handlers Upper Level Floor Plan Project Budget: Total Project Costs $1,350,000 Main Level Floor Plan

Clifty Partial Main Level Floor Plan 2013 Facility Improvements Building Security and Miscellaneous Improvements Project Scope and Priorities: Clifty Creek Elementary School Improve entrance security and building security Create better access to east pair of classrooms from main building Exterior wall repairs CSA Lincoln Elementary School Richards Elementary School Bid Alternates : Replace classroom doors hardware with intruder lock sets CPF Work: Improve entrance security and building security at Northside Middle School Clifty Partial Main Level Floor Plan Project Budget: Total Project Costs $450,000

Southside Elementary Renovations 2013 Facility Improvements Southside Elementary Renovations Project Scope and Priorities: Improve entrance security and building security Renovate main and upper level classrooms (new flooring, and display boards) Add BCSC standard classroom technology systems Replace floor finishes in classroom support spaces Replace casework in two art rooms New finishes and toilet partitions in student restrooms on main and upper levels Replace floor finishes in media center and support spaces Replace flooring in administration area Bid Alternates/CPF: Minor renovations to lower level classrooms Renovate SW lower level student restrooms Upper Level Floor Plan Project Budget: Total Project Costs $1,200,000 Main Level Floor Plan

Johnson HVAC Renovations 2013 Facility Improvements Johnson HVAC Renovations Project Scope and Priorities: Existing HVAC equipment and infrastructure are mostly original from 1952. Replace unit ventilators Replace steam boiler Replace all HVAC piping Most major piping runs are in the crawl space that is under most of the building Temperature control improvements Replace original 400 amp electrical switchgear Rework classroom window wall shelving and ceilings as required for HVAC renovations Project Budget: Total Project Costs $600,000 Floor Plan

Mount Healthy Elementary Renovations 2013 Facility Improvements Mount Healthy Elementary Renovations Project Scope and Priorities: Improve entrance security and building security Renovate classrooms (new flooring, wall repairs, casework, coat cubbies, and display boards Add BCSC standard classroom technology systems Major renovation of student restrooms Replace oil fired boilers with propane gas fired boilers Bid Alternates: Enclose and renovate cafeteria Repair southwest building corner with settlement issues New flooring in computer lab, music, art and LGI CPF Work: Replace exterior spandrel panels at window walls Upper Level Floor Plan Project Budget: Total Project Costs $2,000,000 Main Level Floor Plan

McDowell Education Center Phase II Renovations 2013 Facility Improvements McDowell Education Center Phase II Renovations Project Scope and Priorities: Replace unit ventilators and associated piping Replace fire alarm system Repair trellises and paint exterior steel Repair sidewalks, and renovate courtyards Improve building security (access control, camera system, classroom door hardware) Renovate 4 classroom pods (new flooring, painting, casework, display boards) Add BCSC standard classroom technology systems to six remaining rooms Renovate old small classroom toilet rooms to storage rooms Add student restrooms in SE pod Remodel east office area Renovate main building corridor Replace original interior doors and hardware Additional work with other funds: Shingle and membrane roofing replacement Floor Plan Project Budget: Total Project Costs $1,950,000

East High School Performing Arts Addition 2013 Facility Improvements East High School Performing Arts Addition Project Scope and Priorities: New addition to consist of the following program spaces: New band room, and support spaces New dressing rooms at stage level Elevator to provide handicapped access to stage level and upper performing arts level Student restrooms Other improvements include New vehicle ramp to stage level Screening of dumpsters and loading dock (City zoning requirement) Bid Alternates: Renovations to existing P.A. spaces Existing Building Addition Addition Floor Plan Project Budget: Total Project Costs $2,000,000

Home Bleachers with Press Box 2013 Facility Improvements North High School Outdoor Improvements Project Scope and Priorities: Replace/expand the home side bleachers to +2,600 seats Replace the press box Replace fencing around track and improve access to visitors side Add outbuilding with restrooms, concession and storage Bid Alternates: Renovate/expand visitor side bleachers 1,500 seats Replace/expand visitor side bleachers to 1,500 seats Renovate existing restrooms Renovate shed on visitor’s side Home Bleachers with Press Box Visitor Bleachers Out Building Existing Restrooms Project Budget: Total Project Costs $2,000,000 Existing Building Stadium Aerial Photograph

Existing PE Locker Rooms 2013 Facility Improvements East High School Interior Renovations Project Scope and Priorities: Renovate locker rooms Replace main gymnasium bleachers Replace student academic lockers and flooring on locker level Renovate main gymnasium HVAC systems Bid Alternates: Replace single pane glazing at main gymnasium Install fire sprinkler system in existing parts of building Existing PE Locker Rooms Project Budget: Total Project Costs $2,000,000

North High School Pool & Gyms 2013 Facility Improvements North High School Pool & Gyms Project Scope and Priorities: Replace east & west bleachers in main gymnasium Electrical renovations/upgrades in gymnasiums Renovate plumbing and fixtures associated with main gym Renovate pool HVAC system Repair north and east exterior pool walls Renovate pool filtration system Lighting renovations in pool Renovate pool spectator seating area Bid Alternates: Replace wood gym floor in main gym Upgrade pool deck ceramic tile Renovate PE locker rooms Main Gymnasium Project Budget: Total Project Costs $2,000,000 Swimming Pool

Parkside Elementary Renovations 2013 Facility Improvements Parkside Elementary Renovations Project Scope and Priorities: Improve entrance security and building security Renovate original 1961 classrooms (new flooring, painting, casework, and display boards) Renovate 1989 classrooms (new flooring, painting, and marker boards) Add BCSC standard classroom technology systems Add coat cubbies to classrooms and remove from corridors Renovation of student restrooms Complete corridor flooring renovations Replace 1961 doors and hardware Replace 52 year old HVAC piping Improve acoustics in gym and cafeteria Administration area painting and new flooring Main Level Floor Plan Bid Alternates: Replace additional door hardware Project Budget: Total Project Costs $2,000,000

Smith Elementary School HVAC Renovations 2013 Facility Improvements Smith Elementary School HVAC Renovations Project Scope and Priorities: Improve entrance security and building security Replace unit ventilators with vertical units like those installed at North High School Replace 1968 boiler and consolidate two boiler plants into a single plant Add central condensing unit (air conditioning) and install chilled water piping throughout classroom wings This will replace all the individual condensing units on the roof System change offers vastly improved humidity control and energy efficiencies Replace remaining pneumatic actuators with digital Rework classroom casework and ceilings as required for HVAC renovations Bid Alternates: Classroom flooring replacements as budget allows Project Budget: Total Project Costs $2,000,000 Main Level Floor Plan

A B Northside Middle School Reroofing Project C 2013 Facility Improvements Northside Middle School Reroofing Project Project Scope and Priorities: Area A: Complete tear-off and replacement of existing adhered EPDM roofing system over original 1960 building (44,850 sq. ft.) Repairs at stone copings. Area B: Replacement of existing ballasted EPDM roofing system over 1990 building addition (54,750 sq. ft.) Metal coping replacements as needed Bid Alternates: Area C: Smaller roof section (7,260 sq. ft.) A B C Aerial Photograph Project Budget: Total Project Costs $2,000,000

Taylorsville Elementary HVAC Renovations 2013 Facility Improvements Taylorsville Elementary HVAC Renovations Project Scope and Priorities: Improve entrance security and building security Replace unit ventilators throughout building Convert HVAC system from two pipe to four pipe by adding chiller water piping throughout building. System change offers vastly improved humidity control Replace remaining pneumatic actuators with digital Bid Alternates: To be determined Project Budget: Total Project Costs $2,000,000 Main Level Floor Plan

2013 Facility Improvements Project Schedule

Proposed Project List with Cost and Debt Service Tax Rate Impact 2013 Facility Improvements Proposed Project List with Cost and Debt Service Tax Rate Impact Scope Categories Building security, safety & code compliance Entrance security, A-phones, camera systems & access control Fire alarm system updates ADA accessibility improvements Building Infrastructure protection Roofing replacement Replacement of HVAC equipment and piping past normal lifespan Finish and equipment replacements Improving the educational environment Updating classroom technology to BCSC standards (wall mounted smart board & projector, extron controller and sound enhancement system) Changing chalk boards to marker boards Replacing worn carpeting with sheet flooring Improving temperature and humidity control Additions and renovations to address educational needs