WLTP-DTP Subgroup Additional Pollutants VP2 Results & Open Issues

Slides:



Advertisements
Similar presentations
WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP14 - Status Report and Open Issues, Geneva June 2013 WLTP-DTP-AP Status Report and.
Advertisements

WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP13 - Status Report and Open Issues WLTP-DTP-AP Status Report and Open issues TOKYO,
WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants DTP12 - Status Report and Open Issues WLTP-DTP-AP Status Report and Open issues.
WLTP-DTP DTP Meeting 1 Wrap-up Reviewed general considerations, methodology and timing Reviewed proposals Created initial working subgroups Preparations.
WLTP DRAFTING TF, "RECORDED" BMW, Christoph Lueginger DISTINGUISH BETWEEN MEASURED AND RECORDED.
WLTP-DTP-AP Validation of N 2 O measurement WLTP-DTP-AP Subgroup Additional Pollutants Validation of N 2 O measurement.
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
WLTP-DTP Subgroup Additional Pollutants Progress Report June 2012 WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants Progress report Date:
WLTP - 5h DTP Meeting Zuerich DTP Subgroup LabProcICE slide 1 LabProcICE issues on DTP level Zuerich, April 2011.
WLTP-DTP Subgroup Additional Pollutants September 2011 WLTP-DTP Additional Pollutants Subgroup Validation phase 2? 2011 Bern, EU-WLTP 7 th DTP Meeting-13.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
DTP 10 th meeting – Geneva 6 th June 2012 Update on the execution status of Validation Phase 2 Validation Task Force WLTP-DTP
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
NEDC/WLTP correlation process Meeting of TCMV on 17 November 2015
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
WLTP-DTP Subgroup Additional Pollutants VTF-Meeting WLTP-DTP-AP, Mörsch/Astorga WLTP-DTP Subgroup Additional Pollutants VTF-Meeting Brussels Date: 12/13.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Summary of 3 rd Informal Group on WLTP 11 June 2009 Palais des Nations, Geneva Informal document No. GRPE (58th GRPE, 9-12 June 2009, agenda item.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Welcome to the 7th Meeting of.
WLTP-DTP Results from DTP Session 1. WLTP-DTP First Test Procedure Meeting Overview  Hosted by USEPA in Ann Arbor on the 13 th, 14th, and.
WLTP - Validation Phase 2 (acceptability of the new test procedure)
PMP IWG Progress Report
WLTP Phase 2 Durability Task Force Update
PMP IWG Progress Report
Particle Measurement Programme - Report
76th UNECE GRPE session PMP IWG Progress Report
WLTP-DTP Subgroup Additional Pollutants Progress report
DTP12 Report to GRPE 17th January 2013 Palais des Nations
Air Pollution Control and NIR Division
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
WLTP DTP PM-PN Subgroup Activity Report
WLTP-DTP Subgroup Additional Pollutants Progress report
GTR VERSION: Benchmark ECE-TRANS-WP and Corr AP TF 20 May
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Positions on open points WLTP DTP subgroup LabProcICE
Idea of family CO2/FC family criteria
NO2 Measurement Method proposed by Japan 9 ~ 10 December 2010.
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Development of World-wide Light-duty Test Cycle
test results and second proposal by Japan
WLTP-DTP Subgroup Additional Pollutants Progress report
WLTP-DTP Subgroup Additional Pollutants Progress report
WLTP-DTP Subgroup Additional Pollutants VP2 Results
Correlation Improvements
WLTP-DTP Subgroup Additional Pollutants Progress report
Lab Process Internal Combustion Engines
Work plan and next steps – RDE-LDV working group
Instruments used HORIBA AIA721 NDIR online analyzer
1. Summary # items RESULTS status remarks EV_1 HEV system power
WLTP-DTP Open issues.
Lab Process Internal Combustion Engines
Additional Pollutants Subgroup 7th DTP Meeting-13 September
Status report of the cycle and gearshift issues task force (GSTF)
GRPE/WLTP-IG/ DHC subgroup
WLTP-DTP Subgroup Additional Pollutants Progress report
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
WLTP-DTP Subgroup Additional Pollutants Progress report
DTP Lab Process ICE: Open Issues
WLTP-DTC Air Pollution Control and NIR Division
Status Report Cop Taskforce
WLTP-DTP Subgroup Additional Pollutants Progress report
ACEA and JRC PMP meeting 7/11/2018
Palais des Nations, Geneva
UNECE WLTP COP task-Force Revision on testing Frequency
Presentation transcript:

WLTP-DTP Subgroup Additional Pollutants VP2 Results & Open Issues Date: 12. Dec. 2012 WLTP-DTP-AP, Mörsch/Astorga

Data is sufficient to close open issue Validation NO2 Measurement Additional data from 6 labs received: 11 Vehicles 157 Tests with modal and bag results for NO All labs used CLD Data is sufficient to close open issue   Analysis Vehicles Repetitions UTAC VP2 CLD 6 3 IAV GM ACEA 2 TÜV no modal data DEKRA EMPA Bosmal no data Maruti Korea WLTP-DTP-AP, Mörsch/Astorga

NO2: measurement from bag versus modal measurement Measurement from bag systematically yields higher concentration of NO2 This is due to the reaction of NO to NO2 in the bag  modal measurement should be required to avoid error WLTP-DTP-AP, Mörsch/Astorga

Validation NH3 Measurements Only few labs have submitted data Only few measurements of two systems in parallel, no correlation Data is not sufficient to close open issues WLTP-DTP-AP, Mörsch/Astorga

NH3-Measurement Issue: Available Proposals: Measurement from raw exhaust influences subsequent CVS measurements Not sufficient results from VP2 Available Proposals: Limit sample flow and return bypass ( influence on small displacements may still be too high) Additional test for NH3 ( workload) Measurement from diluted exhaust ( so far no experience, difficulties expected)

Necessary for decision: NH3 Measurement Necessary for decision: Postpone finalization of GTR for NH3 measurement till end of 2013 Way out: Evaluation of diluted measurement Include in AP validation Sept 2013

Validation N2O Measurement Only few labs have submitted data No measurements of two systems in parallel Data is not sufficient for validation but no open issues WLTP-DTP-AP, Mörsch/Astorga

Issue: Way out: N2O Measurement No technical issues foreseen But not sufficient results from VP2 In industry evaluation has been performed Way out: Use data from industry programs to validate draft GTR

Measurement of EtOH and Aldehydes Issue: No data from VP2 New measurement methods not yet available Necessary for decision: Postpone finalization of GTR for EtOH and Aldehydes measurement till end of 2013 Way out: Validation will be performed separately in Sept. 2013

Validation of measurement of EtOH and Aldehydes Additional measurement campaign necessary At least two weeks, ca. sept. 2013 (depending on availability of instruments) JRC will host the campaign Instrument manufacturers methods: AVL Horiba Innova (to be verified) MAHA Sensors GC-Method FTIR Call for instruments (on CIRCA) Vehicles: 2 different FFV, 2 Gasoline WLTP-DTP-AP, Mörsch/Astorga