Sustainability Study of Burton Elementary School

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects July 2009.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Locking Down & Linking In Southgate Community Schools Security and Technology Bond Plan.
Tam Valley School Modernization - Phase 1 Summer 2011.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Safety Training Safety First. EXITS All exit doors shall be maintained in operable condition. Exit doors shall not be locked, chained, bolted, barred,
Cathedral of the Immaculate Conception Project Information Session.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Welcome to the Grafton Village Town Hall Meeting! March 14, :30-7:30 pm.
Addressing Highest Priority Facility Needs
Bronze Award: Library/Media Center
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Blissfield Community Schools Strategic Plan Facilities Team.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
What is Cornice?.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Proposal for School Closure and Consolidation – Saint John West November 2014.
Civil Engineering & Architecture 2.3 Residential Design.
ACCESSIBILITY: A CODE COMPLIANCE AND EXISTING CONDITIONS ASSESSMENT AND SURVEY OF THE LIMERICK TOWN HALL MAIN STREET LIMERICK, ME ttl-Architects LLC 28.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
SCHEMATIC DESIGN PRESENTATION
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Schools (2/2) March 22 nd Context Administration facilities Staff facilities Safety and security measures.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Sustainability Study of Burton Elementary School October 13, 2015.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
COZYEON Residence Main facilities gallery. Corridor of each floor.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
Facilities Focus Group
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Cornwall Central School District
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
Electrical Gas Plumbing Heating & Cooling
Green Homes Carrie Harmon.
2018 Bond Review and Proposal
Capital Outlay Workshop
Capital Construction Project
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Capital Construction Project May 21, 2019 Voter Referendum
Mount Vernon Community School
Community Practice Asset Management.
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

Sustainability Study of Burton Elementary School Revised: May 11, 2011

Public Meeting #1 - Agenda Introductions Review of Provincial Policy 409 Multi–Year School Infrastructure Planning Presentation of Facts – Burton Elementary School Question and Answer What’s Next? Online Resources and Feedback Next Meetings Explain what “sustainability” means. Maintain the status-quo at Burton Elementary School Invest dollars into the infrastructure/programming at Burton Elementary School Close Burton Elementary School and move the students to another school for their continued education

Enrolment

Number of Students Enroled School Year

Enrolment by Grade Level

Health and Safety Building Assessment

Building Summary Constructed in 1961 with a wood frame structure, a wood roof and interior wood walls on steel support beams. Renovations have included: Stairwell enclosures (fire integrity) Washroom upgrades Roof, window and siding replacement Boiler upgrade Gym wall upgrades (reduction of flame spread rating) All schools (pre 1980) in the Province are currently under structural review.

Classrooms The school was constructed with 5 classrooms. Presently: 3 classrooms are being used for classroom teaching spaces 1 classroom is being used for an office area 1 classroom is being used as a library space

Stairwells and Corridors A 2001 renovation provided stairwell enclosures complete with fire doors to meet National Fire Code. A 2010 renovation was completed to reduce the flame spread rating of the gymnasium. The building is not accessible due to stairs at all entrances. An elevator has been identified as a project on the Capital Improvement list.

Fire Protection A Cerberus Pyrotronics fire alarm system is installed, however, the building does not have a sprinkler system. Fire extinguishers are located throughout the building and fire alarm pull stations are located at exits from the building.

Domestic & Waste Water Water from a private well passes through a Sterilight ultraviolet water sterilizer and a filter before entering the distribution system. Hot water is heated with a Giant Cascade 40 gallon hot water heater. There is currently a septic system complete with a drainage field. Presently, a Natech Environmental Services Inc. report recommends that the system be replaced with 1 or 2 new septic tanks, sewage lift pump and a disposal field.

Heating & Ventilation An oil fired Weil-McLain boiler complete with a Riello burner and two pumps circulate hot water heat. Relies on air infiltration and operable windows to bring fresh air into the school and exhausts through gravity vents found in the classrooms and gymnasium. Washroom upgrades provided mechanical exhaust from the washroom spaces.

Controls & Communications In 2004, the controls system was replaced with new Delta Direct Digital Controls (DDC). The controls are accessible remotely through modem. Washroom exhaust, boiler and circulating pumps are on the controls system. In 2002, a Bogen MCP35A public address system was installed.

Electrical & Lighting There is a 400 amp entrance through an overhead connection. An electrical distribution upgrade has been identified as a Capital Improvement Project. New fluorescent lights in the corridor. Original fluorescent lights in the classrooms. An upgrade to ceilings and lighting in classrooms has been identified as a Capital Improvement Project.

Exterior Exterior windows and siding were replaced in 1990 with masonite siding and aluminum framed windows. The attic is vented with periodic soffit vents and gable vents. The siding has been identified to be replaced in the Capital Improvement list.

Property There is an entrance and an exit onto Route 102 Highway. Staff and visitors share the school parking lot which has been identified on the Capital Improvement list to replace the asphalt and provide curbing. The driveway is shared by the bus loading zone and parent drop off. There are 2 swing sets, a play structure and a ball diamond along with green space for alternate activities.

Capital Investments Year Scope of Work Cost 2010 Gym wall upgrade $12 000.00 2004 Replace Control System $5 280.00 2003 Playground Upgrade $2 500.00 2002 P A Upgrade $2 996.00 Replace leak Sensor $2 095.00 2001 Fire Integrity-Stairwell $24 127.00 2000 Washroom Upgrade $52 339.00 $3 872.00

School Physical Plant Status Building Exterior and Site Description Estimated Cost Building Envelope Other Replace siding on building. 4,000 sqft @ $9.25/sqft. NOTE: Estimated costs updated Sept ’09. $37 000.00 Site Site Improvement Curbing and driveway refinishing. Paving 11,500 sqft @ $3.00 (34,500) and 400L/ft of curbing @ $37.00. NOTE: Estimated costs updated in Sept ’09. $50 000.00

School Physical Plant Status (continued) Building Interior and Additions Description Estimated Cost Interior Accessibility Lift Elevator and Access to building. NOTE: Estimated costs updated in Sept ’09. $220 000.00 Interior Finishes Ceilings Upgrade all old ceilings and lighting. 5 classrooms @750 sqft ea = 3,750 sqft @ $4.50 for ceiling and $3.00 for lighting. $28 000.00

School Physical Plant Status (continued) Mechanical and Electrical Systems Description Estimated Cost Electrical Electrical Supply and Distribution Electrical system upgrade. Power distribution, panels, receptacles ($25,000 + $21,825 + $8,370). NOTE: Estimated costs update in Sept ’09. $55 000.00 Heating and Ventilation Ventilation System New Ventilation system. 8730 sqft @ $18/sqft. NOTE: Estimated costs updated in Sept “09. $157 000.00 Water Supply and Sewer Sanitary Sewer Systems New sewage treatment system. NOTE: Estimated costs upgraded in Sept ’09. $154 000.00

School Physical Plant Status (continued) This item was completed in March 2011 Fire Codes Description Estimated Cost Fire Prevention Other Remove carpet and paneling from gym walls and replace with gypsum board, crackfilled and painted as per Fire Prevention Order November 12/09. $12 000.00 School Total: $713 000.00 Therefore……. New Total: - $12 000.00 $701 000.00

Quality of Education Programs and Services

Quality of Education Programs and Services Provincial staffing formula calls for: 3.3 FTE for classroom teachers 0.2 FTE for administration <0.1 FTE for guidance (not assigned at Burton; emergency services available) No formula for literacy/resource; we staff at 0.2 FTE and 0.2 FTE, respectively Total is 4.0 FTE teaching staff, including principal of the school

Quality of Education Programs and Services (continued) Student-teacher ratio is projected to be 15.3:1 for Burton Elementary in 2011-12 Likewise, it is projected to be: 19.0:1 in the K-2 Town of Oromocto elementary schools 20.1:1 in the Town of Oromocto elementary schools 19.4:1 in the School District 17 elementary schools K-2 students from Burton feed into Hubbard Ave. Elementary for grades 3 to 5 for both English and French Immersion

Maximum class sizes Grade Level Maximum Students K-2 21 3 26 Combined K-3 16 Combined 4-5 23

Other Staff 1.0 Teacher’s Assistant Administrative Assistant: 25 hours a week Library Assistant: 5 hours a week Cleaning staff: Burton School is cleaned by Empire Maintenance Industries for 7 hours per day. 

Delivery of Programs Physical Education offered ½ hour each day; principal relieves K- teacher who teaches PE to all classes Mentors visit on occasion Clusters 2 sessions per year (thematic and interspersed; would like to do more) Literacy support – currently serves a small number of students; principal carries this 0.2 FTE load Resource and Methods – currently serves a small number of students; principal carries this 0.2 load Guidance – largest piece missing; emergency services available; proactive measures need to be covered by classroom teacher Strong volunteer commitment from parents

Provincial Assessment Data Last 4 Years Grade 2 Reading Burton District Province 2006 -2007 88.9 80.0 72.0 2007 - 2008 66.7 82.7 76.1 2008 - 2009 92.9 87.0 82.0 2009 - 2010 75.0 84.0

Provincial Assessment Data Last 4 Years Grade 2 Writing Burton District Province 2006 - 2007 77.8 71 57 2007 - 2008 66.7 67 59 2008 - 2009 85.7 72 60 2009 - 2010 75.0 75

Parent Perception Data A favorable response to questions on the Positive School Environment at Burton. 94.5% Burton 87.9% for School District 17 Elementary Schools 88.4% for Provincial Elementary Schools

Parent Perception Data Favorable response to questions on Effective Instructional Practice at Burton. 91.2% Burton 79.3% for School District 17 Elementary Schools 80.9% for Provincial Elementary Schools

Parent Perception Data Favorable response to questions on Communication Between School/Parents. 91.0% Burton 80.8% for School District 17 Elementary Schools 82.1% for Provincial Elementary Schools

School Benefits Strong knowledge of individual students, their needs, and their histories Effective transition between grades and to Hubbard Strong sense of collaboration among staff Strong parent support

School Challenges Lack of an appropriate gymnasium Lack of human resources for ability to expand on clusters and other educational opportunities Lack of common planning time within the instructional day Less opportunities for educational field trips Lack of accessibility for students with exceptionalities

Burton Elementary School Transportation Burton Elementary School 412 Route 102 Burton, NB

Transportation The Burton School zone has boundaries stretching from #175 Route 102 to #767 Route 102, a distance of 11.3 kms. It takes in all subdivisions and roadways off of Route 102 between those numbers.

Current Bus Route # 64 Insert Map!

Transportation (continued) The current bus schedule picks up the first students at 7:55 a.m. The bus starts at #175 Route 102 and continues down towards the school. It goes by the school at 8:08 a.m. rather than making a drop at that time and continues towards #767. The bus gets back to the school at approximately 8:30 a.m. and drops the complete group off in one drop.

Transportation (continued) There are very few, if any, walking students at Burton School and all students are entitled to take the school bus. On average, there are between 8 to 10 cars dropping students off. This certainly varies on different days.

Finances

Salaries Actual Costs Cost Centers Fiscal Year 2009-10 2008-09 2007-08 Administration 11,879 7,257 1,053 Teacher 247,654 197,325 147,862 Admin.Assist/Library Assist 19,743 16,180 19,834 Teacher Assistant 18,278 18,284 16,602 Total 297,553 239,046 185,350

Assigned Budgets Actual Costs Cost Centers Fiscal Year 2009-10 2008-09 2007-08 Assigned Budgets Regular Instruction 7,467 6,918 4,923 Admin.Support 1,450 1,389 1,407 Library 500 245 257 Teachers Working Conditions 1,539 1,427 1,440 Nutrition 1,215 1,206 1,213 Positive Learning 1,000 700 Co/Extra Trips 871 873 1,060 PSSC 540 400 Total 14,742 13,098 11,400

Facilities Costs Actual Costs Cost Centers Fiscal Year 2009-10 2008-09 2007-08 Facilities Costs Contracted Cleaning 19,467 19,009 17,700 Electricity 4,135 3,654 3,472 Heating Fuel 5,832 8,815 7,786 Water and Sewage - Ground Maintenance 2,000 1,967 Minor Repairs 1,259 902 2,945 Total 32,693 34,379 33,870

Total Costs TOTAL COSTS 344,988 286,523 230,621 School: Burton Actual Costs Cost Centers Fiscal Year 2009-10 2008-09 2007-08

Impact on the Community of Burton Parent participation in school activities would require travel to Oromocto A loss of partnerships between community service groups and the local community school Possibility of projected growth this summer as new development has started this spring; however, there is no indication that these potential homes would have school-aged children

Impact on Other Schools With Hubbard Elementary School serving as the receiving school for Burton Elementary School students entering grade 3, Assiniboine Elementary School would be the natural choice should a decision be made to relocate students from Burton; there is capacity for this move Distribution of FTE’s Teachers moving into different settings Teamwork Combination of resources (inherit P.E., technology, literacy, and math manipulatives, etc.)

Economic Development Consultations Business New Brunswick Enterprise Fredericton Enterprise Central

Economic Development Several businesses exist in Burton; no dramatic expansion in employment is detected Burton is largely a commuter area with daily travel into Base Gagetown and points beyond Burton residents appear to shop and spend moneyin the Town of Oromocto or points beyond Burton residents appear to seek out recreational opportunities in Oromocto or points beyond New housing starts give no indication of the number of school-aged students per household

Provincial Policy 409 Determination made by School District 17 Education Council to review the sustainability of Burton Elementary under Policy 409 – February, 2011 Timeline was created to conduct the study in a fair, open and responsible manner Policy 409 can be found online: www.gnb.ca Choose Education and Early Childhood Development under Departments Choose “Policies” from categories along the left hand side Choose Policy 409

Questions and Answers

www.district17.nbed.nb.ca Burton Sustainability Study Sustainability Study Timeline Parent Letters April 4th May 10th Burton at a Glance Link to Policy 409 Public Meeting #1 – Presentation Advertisement Feedback can be given via email at Burton@nbed.nb.ca through our blog at Burton Sustainability Study mail to Cathy Buck, School District 17, 17 Miramichi Road, Oromocto, NB E2V 2P6 Reminder of what “sustainability” means: Maintain the status-quo at Burton Elementary School Invest dollars into the infrastructure/programming at Burton Elementary School Close Burton Elementary School and move the students to another school for their continued education

Thank You For Coming