Value of contract: Length of contract: Contract start date:

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

Capital developments at SFX
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Jim McElwain College Architect SETTING UP A LABORATORY.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Educational qualifications and experience required from the technical staff of contracting activities # Activity code Activityeducational qualification.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
1 Sustainability & Environmental Management System (SEMS) Contract Specialist Focus Wednesday, July 18, 2012 Colorado Room Call-In #: ______________ Passcode.
Computing Laboratory Building & Facilities Overview Role of Building & Facilities Manager Helping you Cleaning Reporting problems Interface with the Estates.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
We provide and maintain all utilities such as Electricity, Water, Waste Water, Heating and Cooling Services, Refuse Collection, and the Garrison Recycling.
FOR SALE 132 Park Road Blackpool Lancs FY1 4ES 3 Bedrooms Rear porch/ conservatory PVCu Double Glazing Gas Central Heating Price: £74,950 Middle Terraced.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
THE CRANBEL COURT CITIVIEW AREPO. We are pleased to announce the launch of our new and elegant product, the Cranbel Courts Apartment, Citiview, Arepo.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
1 Ukraine Higher Education Final conference Kiev 12 November 2015 European Investment Bank 03/02/2016.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Fox Construction Group has over 20 years experience in providing infrastructure, support services and construction throughout.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
INFORMATION ABOUT ASBESTOS EDMS No General, 2.Materials, 3.Risks, 4.Effects on health, 5.Prevention at CERN, 6.Work management, 7.Your role as.
Minor Works & Plant Hire Meet the Buyer Event Tyrone 21st June 2017
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Pre-Contract Cost Control
“kicking on to the finish”
EDENSVILLE ESTATE SIMAWA.
1, sq m (20,067 sq ft) Property Highlights
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
TO LET (MAY SELL) Former HSS Hire Unit Wakefield Road Bradford BD4 7LX
Pre-Contract Cost Control
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
20 Chestnut Drive, Mansfield
INFORMATION ABOUT ASBESTOS
Hopewell Valley Regional School District
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
KOMPLEX Investors Report – Q
1315 E. Cary Street FOR LEASE First Floor Suite Richmond, VA 23219
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Wbs, CONTRACTORS & GIVING A BID
Value of contract: Length of contract: Contract start date:
Value of contract: Length of contract: Contract start date:
Presentation transcript:

Ardagh Metal Packaging, Sutton In Ashfield Office, canteen & welfare redevelopment Value of contract: Length of contract: Contract start date: Completion date: £1,000,000 12 months November 2012 November 2013 Works/services provided: Asbestos survey and extensive removal Demolition Ground remediation Structural steelwork Curtain walling Flat and pitched roofing Glazing Access controls Car parks and surfacing Underground drainage Commercial kitchen and canteen fitting Design of building services Landscaping Suspended ceilings Partitions Sanitary ware External rendering Waste removal & recycling Heating, Heat recovery, ventilation and cooling Electrical, Data cabling & Fire alarm installation Soundproofing Dry-lining Kitchen and bathroom installation Flooring Decoration Detailed description of contract: Demolition & alteration of existing building, circa 1925, to create new Reception, Canteen, Changing Facilities, Office Suite, Dedicated Meeting & Conference Rooms. The project was executed under JCT minor works incorporating elements of contractor design. The contract involved extensive asbestos removal, mechanical & hand demolition, new build, extensive refurbishment and installation of moveable wall systems. Particular challenges to be overcome: Contact details: Phased programming to enable business continuity of the production facility (Circa 30m Units per week) Achieving key completion dates to enable ‘business critical’ staff re-location Containment of extensive demolition works directly adjacent to occupied offices and production lines Containment of asbestos fibres during strip out works alongside live production lines Partial strip out and alteration of ‘Live’ building services and production control equipment whilst maintaining continued service in all adjacent areas Mr Neil Palmer (Project Co-ordinator) Ardagh Group Plc, Forest Works Coxmoor Road, Sutton In Ashfield Nottingham. NG17 5LA Tel: 01623 518030