Helen Boyer OHS group leader

Slides:



Advertisements
Similar presentations
Health and Safety - an update Ian Gillett Safety Director.
Advertisements

ESO Documentation and Considerations for Major Emergencies
Monitor a Safe Workplace BSBOHS407A By Amorntip IM-UM ID : C62151.
WHS Management Plans.
Permit to Work Procedure Document Number: KOC.SA.004
Health and Safety Awareness Low Risk Areas Lawrence Dickson Training and Audit Co-ordinator Health and Safety Department.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
OH&S Management System
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
Health and Safety Department
School of Physics Safety Seminar for Honours Students.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
Safety Management System
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
OH&S Management System
National Food Control Systems
ESS licensing process and Readiness Reviews
Health and Safety Self Assurance Toolkit 2017
Environmental Services Training Group
Preparations for a Formula One Race C Whiting
Safe Field Research …advice from EHS.
HSE rules & regulations
EET 422 EMC & COMPLIANCE ENGINEERING
OH&S Management System
This code should be read by:
Life Saving Rules-Do it Right!
SHE Code 34: Electrical Safety
Armenia Training and Tutoring Feedback
Roadmap to COR.
Updates on ESS Handbook for Radiation Protection
Health and Safety! By jack Hughes.
Licensing update ESHAC #9, October 2018
Management System - update -
ESHAC #9 – 1/2 October 2018 Ralf Trant
Radiation protection organisation
Radioactive waste management - status
Mikael Jakobsson ESS Installation Manager
Legal and Regulatory Framework for Nuclear Installations in IRAN
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Installation Binder / IRR – an example
Continuity of Operations Planning
Mattias Skafar Head of Quality Division
Operations/Control room organization during commissioning
Scranton School District School Safety Update
Workshop commissioning Installation Coordination at ESS
Ian Evans SSRL Safety Office
Welcome and charge to the committee
PSS0 Design & Concept of Operations
Receiving Inspection on incoming goods
Presenter name Presenters title
Safety Culture Peter Jacobsson Environment, Safety & Health
ESS Handbook for Radiation Protection
ESHAC 9 Emergency Contingency Plan
ESS Management System SSM visit 24th October
Relevant Management System & Declaration of Conformity EU compliance
Internal Audits Management Review Meetings
Radiation Protection Handbook
ESH&Q General Information
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
Health and Safety Induction for Managers
DOE Review of the LCLS Project October 2006
Licensing update ESHAC #7, October 2017
ESS Handbook on Radiation Protection Chapter 5 – Radioactive material
ESHAC Meeting # Peter Jacobsson Head of ESH
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
FARID Abdelmounim National Centre for Radiation Protection Morocco
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

Helen Boyer OHS group leader ESHAC 9 OHS group update Helen Boyer OHS group leader www.europeanspallationsource.se 22 February, 2019

Occupational Health and Safety Structure of group Peter Jacobsson ESH Division Head Radiation safety Environment Safety training Radiation protection Sigrid Kowielski Occupational Health and Safety Helen Boyer Two OH&S safety engineer – Michael and Nick 1 electrical safety engineer - Jörgen 1 fire safety engineer - Fredrik ESHAC 9 – October 2018

Ways of Working Issued procedures/ plans for ways of working since ESHAC 8 Work environment incident reporting (separate presentation) Emergency contingency plan (separate presentation) Site evacuation plan New Risk Assessment Method Statement (RAMS) process on trial in Accelerator division (separate presentation) Finalized the underlaying documents to ESS Rules for Electrical Safety Rules for writing Operating order, Permit-to-Work, Certificate of commissioning, Electrical LOTO, Supervision of Electrical Installation, Self-inspection programme for Electrical Installation Work, Inspection of Specific Electrical Equipment . ESHAC 9 – October 2018

Key ESS activities with OHS support Office move Training of fire brigade Ion source and LEBT Electrical work Safety Communication ESHAC 9 – October 2018

Office Move Over 500 people moved from Medicon village to site in May and June. Safety inspections carried out and active feedback from safety delegates Fire Safety – Evacuation leaders in all areas appointed and trained. Assembly point evacuation leaders appointed who are responsible for co-ordinating the information from the evacuation leaders and reporting this to the rescue services in an emergency ESHAC 9 – October 2018

Training the Fire Brigade Every working day from the 16 April to the 18 May an on-site orientation training to the Municipal Rescue Service MRS (RSyd) was provided Around 150 fire fighters trained The purpose of the tour of the site and in-depth stops at three specific points was to: allow members of the MRS to get familiar with the ESS site and its future operations; learn more about risks linked to the intervention, existing and planned emergency routines, provide logistic information, such as access routes and positions from where to lead an emergency intervention. ESHAC 9 – October 2018

IS&LEBT Support to work package leader to prepare risk assessment document Work carried out to support ATEX classification of area Assisting to get an approved declaration of conformity according to LVD-, EMC-directive and Swedish legalization regarding high-voltage for the Ion source and LEBT ESHAC 9 – October 2018

Electrical work Planning to hand-over the operation of Electrical Safety to Engineering and Integration Support division, and focus on govern that ESS follows ESH requirements regarding Electrical Safety according to host state regulations, EU directive, International standards and best practices.   Started development of an electrical safety awareness course; also started the development of training for Electrical Safety Leader and Electrical Operations Leader Checked and approved that Infrastructure for the Site´s new laboratories and follow electrical safety regulations. ESHAC 9 – October 2018

Safety communication ESHAC 9 – October 2018

Near Future Development Work permits Current system paper based and controlled by a variety of people. Require a system that has a focal point to guide people to what is needed and where to go. Final system will be linked to the new Engineering Asset Management system. Risk assessment Need to rationalise a number of different risk assessment procedures. Need to provide training and guidance in carrying out risk assessments. ESHAC 9 – October 2018