ETS WG meeting 6-7 September 2006

Slides:



Advertisements
Similar presentations
United Nations Economic Commission for Europe Statistical Division Applying the GSBPM to Business Register Management Steven Vale UNECE
Advertisements

Development of metadata in the National Statistical Institute of Spain Work Session on Statistical Metadata Genève, 6-8 May-2013 Ana Isabel Sánchez-Luengo.
24-25 September 2009Meeting of the European Directors of Social Statistics Update on Lifelong Learning and Education Systems statistics Agenda point 4.8.
15 May 2009 WG Core variables in social surveys 1 Point Educational attainment.
COORDINATING GROUP FOR STATISTICS ON TRANSPORT
education and training systems (UOE)
Adult Education Survey Implementation
Structural Business Statistics Data validation
Working Group on Population and Housing Censuses
LAMAS Working Group 7-8 December 2015
Adult Education Survey
Education and Training Statistics Working Group – June 2014
Rolling Review of Education Statistics
Strategic development group Update on education and lifelong learning statistics 17/6/2009.
Item 10 – Conclusions of the meeting
Item 4.2 – Implementation of the Adult Education Survey
LAMAS Working Group 7-8 December 2015
Draft EP/Council Regulation for processes, standards and
European Safety Survey (SASU) item 7 of the Agenda
Orestis Tsigkas ESTAT-F5
Giuliano Amerini Unit E6 (Transport)
Adult Education Survey : recommendations of the TF AES
Classification of learning activities
ETS WG 6-7 September, 2006 Point 6: UOE quality report History
Marine Strategy Framework Directive (MSFD)
Task Force on Environmental transfers of the Working Group on
Item 9.1 – Implementation of the Adult Education Survey (AES)
Item 7 - Roadmap and mandate for the Task Force on UOE Education Expenditure Data Eurostat Education and Training Statistics Working Group - Luxembourg,
Item 11 – Conclusions – ETS 2018 WG meeting
Education and Training Statistics Working Group – 2-3 June 2016
Item 7.1 Implementation of the 2016 Adult Education Survey
Item 8.1 Implementation of the 2016 Adult Education Survey
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Classification of learning activities
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
TG EHIS January 2012 Item 4.1 of the agenda EHIS wave 2 Implementing Regulation Bart De Norre, Eurostat.
Education and Training Statistics Working Group Meeting of 17 November 2010 Item 3 – Lifelong learning and outcomes of education Sylvain Jouhette Eurostat.
Education and Training Statistics Working Group
ESQRS implementation in the in Labour Force Survey
Draft main conclusions
Jakub Hrkal ESTAT Unit F-4
Mapping Data Production Processes to the GSBPM
Adult Education Survey progress report Point 6
Agenda item 5.3 EHIS - Implementing Regulation
Item 4.3 – Repeal of CVTS legal acts
Eurostat ETS Working Group - Luxembourg, April 2013
The EPSS (European Programme of Social Surveys) project
ETS Working Group: January 2006 Item 10
ETS WG, 30 January-1 February 2006 Agenda Item
Conclusions of the meeting
Item 5.1. Learning Mobility in Higher Education
EUROSTAT –Unit F3 Living conditions and social protection statistics
Education and Training Statistics Working Group – June 2014
Education and Training Statistics Working Group, May 2011
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Education and Training Statistics Working Group, May 2011
Adult Education Survey Anonymisation Point 6
European Statistical System Network on Culture (ESSnet Culture)
COMITOLOGY ITEMS (Point 4. on the agenda)
Education and Training Statistics Working Group – 1-2 June 2017
Item 8 - Disability statistics
Education and Training Statistics Working Group, May 2011
LAMAS Working Group 7-8 December 2015
Stuart McAllister ESTAT F4
Prodcom Working Group Item Quality reporting and indicators
2.7 Annex 3 – Quality reports
EU SASU legislative process
Item 2.2 Scientific Use Files for the Time Use Survey
Draft implementing act on Monthly Unemployment Rate (MUR) Item 3
Item 9 Validation in UOE data collection
Presentation transcript:

ETS WG meeting 6-7 September 2006 Adult Education Survey progress report ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Implementation TF meeting (16-17 March 2006) AES quality report scheme IT infrastructure AES document update ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Implementation TF meeting 16-17 March 2006 Exchange of experiences as for: ways of asking questions on participation in formal, non-formal education and training and informal learning; problems with implementation of CLA concepts; different methods of interviewing; ways of dealing with the long reference period, recalling problems and overlapping; ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Implementation TF meeting 16-17 March 2006 Discussion on: result tables imputation and editing post coding of fields of education and learning importance of interviewers training data confidentiality dissemination rules ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Implementation TF meeting 16-17 March 2006 conclusions TF members agreed to: share information on the difficulties with classification and distinction between formal, non-formal education and training and informal learning (which appeared during the interviews), provide to Eurostat a list of difficult cases in coding fields of education and training (learning) and proposal for classification. This lists will be merged and circulated for the consultation so, that when approved, the list can be used by all the countries in post-coding the same way. All the Countries are invited to exchange their experiences (Circa, and later Quality Report) This was already included in the Quality Report Scheme ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Implementation TF meeting 16-17 March 2006 conclusions Imputation and editing Experience of social survey interviews shows that respondents normally participate during the whole interview so the item non-response should not be significant. AES is conducted for the first time and using assumptions for the imputation rules this may destroy or wrongly modify real correlations between variables. The TF recommends: avoiding any imputation of the item non-response. reporting the non-response for all variables when publishing the data. ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Implementation TF meeting 16-17 March 2006 conclusions Data dissemination The first results will be published after receiving data from half of the countries (covering approximately half of the EU population) - end of 2007, beginning of 2008. Countries having conducted survey before that day may already publish their national results. ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Implementation TF meeting 16-17 March 2006 conclusions Next meeting After arrival and validation of first data sets. Not earlier than late November or December 2006 could be January 2007 ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 Confidentiality TF members see no danger of disclosure in case of the AES data and strongly support the micro data availability for the research purposes with the respect of effective rules. Current consultation on adding Adult Education Survey to the list of surveys or statistical data sources to which Community authority may grant access to confidential data included in the Commission Regulation (EC) No 1104/2006 Deadline for the ETS coordinators 2.10.2006 . ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 Quality Report Scheme Quite typical as for the Eurostat’s quality reports but also heavy. IX Problems encountered and lessons to be learnt Problematic modules and variables/questions Problems with the definition of different types of learning activities which appeared during the interviews Category "other" In principle, whenever category "other" is one of the options in the variables/questions, it should be formulated: Other/please specify. What were the questions with significant number of answers that could constitute separate not already existing category, proposal for a missing category/ies. . ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 IT Infrastructure AES data (csv. files, coma separated values) are foreseen to be delivered through the EDAMIS System. All NSIs have a contact point for EDAMIS In addition other institutes may deliver data via the EDAMIS WEB interface https://webgate.cec.eu.int/edamis - Access will be fully operational before January 2007. “Checking Tool“ is being developed, but it’s distribution to countries is around January 2007. ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Document update The main changes done in the documents are the following: Concerning the survey itself: Addition of the results of the Swedish cognitive tests Concerning variables: Update of the variable NFE7Y (NFECER1-NFECER3) and additional explanations concerning this variable, Update of the categories for the variable NFE20Y (NFEPROV1-NFEPROV3), Changes were discussed via e-mail. ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Document update Concerning code book and checking rules: Addition of some checking rules (helpful for checking information already during an interview or at the data editing process), as recommended at the TF meeting Variables for which no missing values are allowed (otherwise it is a unit non-response) were marked more visibly ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Document update A set of technical variables needed for calculation of variance. Countries are asked to provide quality indicators (CV or confidence interval) for a limited number of indicators included in the Quality Report Scheme. but the AES is a completely new survey and it might happen that there will be a need of calculation of the quality of some other indicators, checking the variance for some variables, etc. To facilitate possibility of doing so we added a set of technical variables. This should reflect the sampling process, calibration and correction of non-response (if applicable). It is not necessary that the codes provided there are the same as in the real process. They can differ. It is also possible that not all of them will be provided (for example not all sampling stages will be relevant for different countries). ETS WG meeting 6-7 September 2006

ETS WG meeting 6-7 September 2006 AES Document update Simplified coding of some variables (e.g. ISCOFATH1D, ISCOMOTH1D), NFERAN1-NFERAN3, FRLGSKIL1, FRLGSKIL2) Some changes in the names on variables on obstacles to better define the possible values of these variables (which in fact is the name of one of the obstacles reported before) and harmonise their length. More strict limits put on the values of variables FEDLEN1-FEDLEN3, NFELEN1-NFELEN1, NFETRAW1-NFETRAW3, as recommended at the TF meeting Update of the list of languages Annex5 and some small changes in the list of countries (Annex1). These changes were made as a result of some political changes and correction of mistakes. ETS WG meeting 6-7 September 2006