Stefan Moeller – XES Manager May 14, 2009

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
NEH ARR PPS 11AUG09 LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
X-ray Pump-Probe Instrument
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
LTU/Undulator Installation Status
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Far Experimental Hall Hutches Civil Construction
John N. Galayda – Director of LCLS Construction March 30, 2009
Far Experimental Hall Hutches Civil Construction
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
Thomas Fornek Project Manager July 15, 2009
John N. Galayda – Director, LCLS Construction May 13, 2009
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstations Update
LUSI Controls and Data Systems W.B.S. 1.6
AMO Early Science Capability
Far Experimental Hall - Hutches
Project Management Issues John N. Galayda, SLAC April 24, 2002
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
LCLS Personnel Protection System and Beam Containment System
E-Beams Systems Manager
LTU/Undulator Installation Status
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
Linac Coherent Light Source Transition to Operations 11 July 2007
Installation Status & Operational Readiness Process
X-Ray Endstation Design & Management/Commissioning
Electron Beam Systems ETC and Methodology
LCLS Lehman Review February 7-9, 2005
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
CF Scope, Management & Organization
X-Ray Endstation Systems (XES) 2006 Schedule
LINAC System Engineering / Design Status C.E. Rago
LCLS e- Beams Systems Manager
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

Stefan Moeller – XES Manager May 14, 2009 XES Path to Close-Out Stefan Moeller – XES Manager May 14, 2009

Aligned XES organization and increased staffing Recent Developments Increased scope in XES Added SXR Instrument Michael Rowen and engineers Integration and Installation Aligned XES organization and increased staffing Added Jose Chan as CAM for AMO fabrication, procurement and installation Strengthened support from Eng Physics Div. Jean Charles Castagna, Michael Holmes Added Rich Atkinson as Installation Manager Added Zoe van Hoover as Safety Officer Adding Christopher Bostedt as AMO instr. scientist

Updates Design completed for all systems in XES (except SXR) Procurement, fabrication phase is nearing completion Working towards installation target dates Upstream stoppers installed on time in electron beam dump ST0 tank serves as first chamber for FEL beam diagnostics

XES Overview (WBS 1.6/2.6) 2.6.5 2D X-ray Detector for CXI 1.6.1 XES Management Stefan Moeller 1.6.2 Controls: Gunther Haller, Remi Machet, Perry Anthony, PPA Photon System Controls Global/Instrument/DAQ 1.6.4 Laser System in NEH Bill White, Greg Hayes LCLS Laser Group 1.6.7 Atomic Physics Instrument (AMO) Jose Chan, CAM Jean Charles Castagna, ME Michael Holmes, ME Engineering Physics Div. MFD-SLAC, LBL, LLNL, OSU John Bozek, Instrument Scientist 1.6.10 SXR Instrument Michael Rowen, Physicist Integration and Installation 2.6.5 2D X-ray Detector for CXI Niels van Bakel, Detector Physicist Sol Gruner Group at Cornell University PPA Mechanical and Controls Group 1.6.9 Mechanical Systems Stoppers, Infrastructure, Shielding Eric Bong, EPD Khalid Ahmed, Rich Maggie, LCLS CF MFD 1.6.6 Installation Jose Chan, CAM Ponce Rodriguez, PCD, Cable contracts Rich Atkinson, Installation Manager 2.6.3 Commissioning Hal Tompkins, XFD

Status AMO AMO Instrument: In house fabrication: Assembly at MFD Goal: June 2nd ready for install in hutch 1 June testing with Controls and alignment Start Commissioning with beam July 16 User Operations starting mid September External components provided by: KB focusing system @LBL due July 16 Energy Detector @LLNL due July 7th Magnetic Bottle Spectrometer @ Ohio State University due Aug 5th

Status Hutch 1 Hutch 1 utility contracts: Overhead crane installation May 15 complete PPS sliding doors approved by BIO, install by May 22th Laser sliding doors- complete by June 8th Hole drilling complete by June 8th Piping for PCW, compressed air, hutch exhaust system exhaust start install May 18 – June 8 Coordinate activities within hutch and with AMO and SXR installation Daily status from LCLS CF, MFD Weekly installation meetings

Safety Upcoming Dates: AMO Hazard Analysis Document finalized Review Process with Safety Oversight Committee (SOC) is nearing completion Approval of all committees planned by end of May NEH Laser SOP for hutch 1 approved Finalize in time for IRR for AMO Upcoming Dates: RSC for AMO design June 16 Radiation Physics Approval ARR for NEH July 1 Instrument Readiness Review for AMO July 14 PPS certification for NEH and recertification of FEE in July

NEH Laser System LCLS Laser Group NEH Laser system available for AMO Bill White, Greg Hays, see talk 5/14 9AM Tables installed in NEH 2/1/09 Commercial laser system accepted and installed 3/30/09 Transport to hutch is designed, commissioning 7/1/09 SOP for hutch 1 approved LSS near completion, ready to certify Start commissioning in laser room June 15 NEH Laser system available for AMO commissioning July 15 Laser to MBES by August 15

Laser transport through floor Basement Level Laser Hall AMO Hutch Sub-basement Level

Cornell 2D Detector Courtesy: Niels van Bakel

Cornell 2D Detector 2D pixel array detector for CXI instrument Collaboration with Sol Gruner Group at Cornell Univ. LDAC Review #8 in May 7-8, 2009 Revised plan to allow for detailed testing of prototype detector Extended contract from May to December 2009 On time for CXI experiments later in 2010 Eliminated several prototype fab runs and one full lot submission due to reliable prototype chip SLAC developed DAQ system and interfaces SLAC designed mechanical packaging Delivery of Final Detector at SLAC in December 2009

Mechanical Design Overview Light shroud (cover removed) Cooling coil Quadrant board Combines signals from 16 ASIC’s 1 FPGA/quadrant Double detector package 4 ASIC’s 2 pixel array detectors Martin Nordby, Matt Swift PPA Mech. Eng.

CXI Quadrant Board Interfaces Courtesy: Niels van Bakel

SXR Instrument Lead by Michael Rowen SXR is being integrated into LCLS Engineering group SXR is being integrated into LCLS With AMO in hutch 1 Similar designs Controls, Laser, utility contracts Safety Process Funding issues have been resolved Optical Systems are on critical path Steep ramp-up of design Adding SXR Instrument Scientist 1st call for proposals due SXR on path to be ready for beam by end of February 2010.

Level 3 Milestones

Installation of X-ray tunnel and FEH cable contracts Other Close out dates Installation of X-ray tunnel and FEH cable contracts PPS, network and timing system 11/09 Install of Tunnel and FEH stoppers 9/09 Delivery of LBL timing system in June 09 Installation early July Commissioning by LBL and SLAC team XES complete by end of 2/10

XES is working on schedule to complete: Summary XES is working on schedule to complete: the AMO instrument for first science in 7/09 the SXR instrument for 2/10 the Cornell Detector for CXI 12/09 Supporting systems are on schedule XES is transitioning to LCLS Operations