Production Part Approval Process

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

PQR / PPAP GUIDE Teaching Aid Last Revised March 17, 2014 (SCARs are not addressed in this guide)
Teaching Aid Last Revised February 18, 2015
Final/Shipout Inspection Approved for Public Release.
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
First Article Inspection Report
Guardian Tier 2 PPAP Guidelines
8-Aug-15 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work.
Auditing OEM Customer Specific Requirements under ISO/TS 16949
First Article Inspection
From Research Prototype to Production
Instructions for Completing the P rint A ttribute R esults Form Last revised 3 January 2005.
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
A JSJ Business Production Part Approval Process AIAG PPAP 4 th Edition Supplier Production Part approval process GHSP.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Supplier Performance Development Process
External Provider Control
Production Part Approval Process
Process engineering Quality controls.
How to apply APQP APQP is comprised of one pre-planning stage and five concurrent phases. Once begun, the process never ends and is often illustrated in.
Production Part Approval Process (PPAP)
Part Approval / Compliance Data Submission via Jotform.com
Control Plan Training.
Integrating QS9000 Requirements
Supplier Production Part Approval Process (PPAP)Training
How to Implement an IG Manufacturing Quality Procedure System
Low Volume Non-Standard Shipments Packaging Requirements
ExTAG Training Workshop Calgary 2012 QAR related Issues
First Article Inspection
DSQR Training Supplier Quality Manual
Appearance Approval Report (AAR)
First Article Inspection Report (FAIR) Training
Part Approval / Compliance Data Submission via Jotform.com
Global Supplier Quality Early Production Containment Training
Appendix A AESQ Standard Interconnection Overview
First Article Inspection (Per AS9102)
Introduction to PPAP 4th Edition
GMP Inspection Process
Supplier Performance Development Process
Product Development Scenario Overview
SQA01 Guidance Material: FAI Review
  Aptiv Global Supplier Quality Early Production Containment Training.
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
This PPAP File Is Under Construction
Process Name ___________________
PRODUCTION PART APPROVAL PROCESS Based on PPAP Manual 4 edition
RISK REDUCTION PROCESS
CVG Global Phased PPAP Process
First Article Inspection
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Advanced Product Quality Planning 2nd Edition
DPAR Training Material Nordin Mimouni – Supplier Quality Manager Rev
Strategic Quality Consulting Process Excellence Architects
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Supplier Performance Development Process
Integrating TS Requirements
Global Supplier Quality Early Production Containment Training
SUPPLIER ELECTRONIC PCR TRAINING
Company X Process Mapping Training
First Article Inspection (Per AS9102)
Advanced Product Quality Planning 2nd Edition
1 ADVANCED PRODUCT QUALITY PLANNING Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Presentation transcript:

Production Part Approval Process PPAP Supplier PPAP Expectations Production Part Approval Process An AIAG* standard used in the automotive supply chain for establishing confidence in component suppliers and their production processes. * Automotive Industry Action Group – 4th edition is currently released.

Supplier PPAP Expectations The intent of this presentation is to give the supplier a brief overview of the Production Part Approval Process and guide them to a successful PPAP submission to JTEKT.

expectation of quality product. Supplier PPAP Expectations PPAP belongs to YOU!!! (the SUPPLIER) It is confirmation that the supplier’s planning & processing is sufficient enough to meet the customer’s expectation of quality product. continuous

Supplier PPAP Expectations There are 3 distinct sections to PPAP… Guarantee/Warranty – PSW (Parts Submission Warrant) Quality Planning – Design Record, Process Flow Diagrams, PFMEA, Control Plan, Inspection Standard, Safe Launch plan, MSA (Gage R&R), Laboratory certifications and facility certifications, special checking aids and Supply Chain Map. Quality Data/Quality Evidence – Dimensional Results, Capability Studies, Material & Test Performance Results, IMDS submission to correct JTEKT ID#, Sample product and records of compliance with any other JTEKT requirements.      

Supplier PPAP Expectations There are a various “Levels” of PPAP depending on what step of the approval process is needed by the customer. As an automotive supplier, your company is expected to know the minimum requirements to satisfy various PPAP levels and when to apply them. Level 2 Level 3 Level 1 Level 4 Level 5

Level 1 – PSW Only Supplier PPAP Expectations This level is generally used for – Corrections (use comments section in PSW). Adding additional application (programs or platforms) to an existing production part. May be requested when being asked to ship already PPAP’ed parts to another location. PLEASE NOTE: All PSW’s MUST INCLUDE an approved IMDS Submission Number And submitted to the appropriate site ID of the customer.

Level 2 – PSW, Sample Parts & Limited Data Supplier PPAP Expectations Level 2 – PSW, Sample Parts & Limited Data This level is generally used for – Minor revision changes to parts that have existing approved PPAP’s. Minor changes in the method of production of parts with existing approved PPAP’s. “Limited Data” would be determined by your customer.

Level 3 – PSW, Sample Parts & Complete Data Supplier PPAP Expectations Level 3 – PSW, Sample Parts & Complete Data This level is generally used for – All new parts being PPAP’d for the 1st time. Major engineering changes where part configuration or manufacturing method deems necessary. Must include ALL elements of quality planning. (i.e.: PFMEA, Control Plan, Flow) and evidence of PV Testing acceptance.

Level 3 – Continued Supplier PPAP Expectations Data collection requires supplier to – Complete a 300 pc. production run. Ensure process capability of 1.67 Ppk on features deemed key or critical on drawing (N=50 pcs. sampling). 100% Layout verification of all dimensions and drawing notes (ballooned drawing). Submit 3 sample parts* tagged to layouts. Material certifications for all components. Gage R&R (repeatability & reproducibility). Other JTEKT requirements per SQAM * Multi-Cavity tooling requires samples from each cavity.

Level 4 – PSW and Other Customer Requirements Supplier PPAP Expectations Level 4 – PSW and Other Customer Requirements This level is generally used for – Significant revision changes to parts that have existing approved PPAP’s. Significant changes in the method of production of parts with existing approved PPAP’s. And where quality planning is unchanged.

Level 4 – Continued Supplier PPAP Expectations Data collection requires supplier to – Complete a 50 pc. production run. Ensure process capability as deemed by the customer. (i.e.: 1.67 Ppk or as noted) 100% Layout verification of all dimensions and drawing notes (ballooned drawing). Submit 3 sample parts* tagged to layout. Material certifications for all components. * Multi-Cavity tooling requires samples from each cavity.

Level 5 – PSW & Sample Parts, but Data on Record Supplier PPAP Expectations Level 5 – PSW & Sample Parts, but Data on Record This level is generally used for – Same expectations as a Level 3, but with on-site verification at the supplier. Performed when there is proprietary information involved or when special processes require to be validated.

Example of PPAP document package Supplier PPAP Expectations Example of PPAP document package Ref: FSQM-017

PPAP Document package is to ship WITH the tagged PPAP sample parts. Supplier PPAP Expectations Remember PPAP Document package is to ship WITH the tagged PPAP sample parts. In a well packed box that is labeled with the JTEKT sample parts label. GOOD EXAMPLE

Successful PPAP submission relies on YOU! Supplier PPAP Expectations Successful PPAP submission relies on YOU! KNOW THE JTEKT SQAM!!!! Ship the PPAP samples AND paperwork package TOGETHER! Label PPAP shipment properly to ensure receipt (use FSQM-013). Don’t forget IMDS, it’s required for final PPAP approval on all levels. Use a checklist (FSQM-080) to ensure all requirements are addressed. Use early shipments (ITO, TTO, OTOP) to prepare for PPAP. Include plans for Safe Launch to ensure Zero Defects for 90 days. Thank You!

Prototype > Off-Tool > Off-Tool Off-Process Pre-Production Part Requirements A few notes about Pre-Production samples… Prototype > Off-Tool > Off-Tool Off-Process All sample shipments need to be labeled per the SQAM using FSQM-013. (SQAM 2.3) All sample shipments must have specified dimensional & test data. (SQAM 2.2) Various sample shipments require capability studies on key features. (SQAM 1.5 & 2.2)

Lessons Learned No PPAP sample label applied to box. The following are examples of incomplete or improper PPAP shipments that resulted in parts being put on hold, or worse yet…lost! No PPAP sample label applied to box. No PPAP documentation included with parts. PPAP sample parts not tagged inside of box. No PSW submitted in PPAP package. IMDS number not listed on PSW. Critical characteristics not addressed in control plan. Capability studies not performed. No Inspection Standard submitted. “Safe Launch” plan not submitted. Ballooned drawing does not address ALL characteristics on drawing.

https://portal.koyobearings.com/portal/ Information Location JTEKT Supplier Quality Assurance Manual (SQAM) Is available on the JTEKT Supplier Portal… https://portal.koyobearings.com/portal/ Do not hesitate to contact your JTEKT Buyer or SAE for assistance. Automotive Industry Action Group (AIAG) – 4th edition PPAP guideline publication is available at… https://www.aiag.org/products/products-list/product-details?ProductCode=PPAP-4