Telecommunication Rooms

Slides:



Advertisements
Similar presentations
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CONSTRUCTION BLUEPRINT READING
7 | Means of Egress (Life Safety Code)
INTRUSION ALARM TECHNOLOGY
1 Chapter One Introduction to Computer Networks and Data Communications.
1 Telephone Connection. 2 Introduction The section instructs you on how to install a required phone line to every receiver.
Cabling system components
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Let’s watch a DVD… DVD Instructor Notes
ABC Technology Project
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
25 pair color code and high count cables
Residential Telecommunications Infrastructure Standard
Old Telephone cabling 4 wire Used in commercial and residence NEW
Antonio González Torres
111 © 2002, Cisco Systems, Inc. All rights reserved. Finish Phase Overview Testing Troubleshooting Certification Documentation.
1 Recognize Any Hazard(s)?. 2 Yes No employer shall permit a worker to work in such proximity to any part of an electric power circuit that the worker.
Squares and Square Root WALK. Solve each problem REVIEW:
Telecom Cabling Cable installation.
Chapter 7: Intranet LAN Design
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
Complete Quiz You have 10 minutes to complete the quiz The Quiz is Open-Book (use it) Get help from your neighbor.
Telecom Cabling Grounding and bonding.
Chapter 4 – Cisco Semester I
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
CIT 470: Advanced Network and System Administration
1 Telecom Cabling Documentation and labeling. 2 Telecom Cabling Documentation remains a major stumbling block for most networks. Many end-users inherit.
Telecom Cabling Cable pathways.
Structured Cabling Overview
CONSTRUCTION BLUEPRINT READING
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
1 PBX installation considerations BASIC TELECOMMUNICATIONS.
Design Considerations for Telecommunications Pathways and Spaces
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Chap 9 Structure Cabling Project Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
INTRUSION ALARM TECHNOLOGY
HORIZONTAL SUBSYSTEM. CABLING SYSTEM Horizontal Subsystem The Horizontal cabling subsystem is the part of the Signamax Cabling System that extends from.
1 Guide to Network Cabling Fundamentals Chapter 5.
Chapter 9 Review Structured Cabling Project. Chapter 9 Focus The focus of this chapter is standards for networking media. You read that when RJ-45 jacks.
Cabling Project. Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.
1 Structured media enclosure (distribution device) Structured media enclosure (distribution device) BASIC TELECOMMUNICATIONS.
1 Telecom Cabling Residential cabling. 2 Telecom Cabling Approximately 1.6 million new homes are being built in the United States each year, and a surprisingly.
CABLING SYSTEM BACKBONE SUBSYSTEM.
Structured Cabling Hassan Alowaid Michael Chaix Reza Saputra.
CABLING SYSTEM ADMINISTRATION. Administration Concept.
Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.
SIGNAMAX CABLING SYSTEM. Signamax Cabling System The Signamax Cabling System Design Principles and Installation Practices are based on the requirements.
BACKBONE SUBSYSTEM. CABLING SYSTEM Backbone Subsystem The Backbone cabling subsystem is based on cabling segments, which link such connection centers.
TELECOMMUNICATIONS SPACES. WORK AREA WA Work Area Work Area (WA) Telecommunications Outlet (TO) Horizontal subsystem cables Equipment and patch cords.
TELECOMMUNICATIONS SPACES
CABLING SYSTEM PROTECTION. Screening/Shielding  1 In the Signamax Cabling System for the efficient screening of the telecommunications systems, the screen.
SIGNAMAX CABLING SYSTEM. Signamax Cabling System The Signamax Cabling System Design Principles and Installation Practices are based on the requirements.
Drafting 2 (Arch) Quiz Review #3 Quiz Review. 1.Dashed lines that follow the counters in a kitchen floor plan most likely represent: A dishwasher Upper.
COMMUNICATION SYSTEMS IN BUILDINGS/CAMPUSES
Data centre network map
Copper-Based System Residential Cabling Topologies & Standards 8
Structured cabling What, why & how.
Conductors and Cables 2017 NEC
Horizontal and Back Bone Cabling
Engineering Project Cable Management.
Computer Systems Department.  Introduction  Course Objectives  Grading Policy  Lab Policy  Structured Cabling.
Presentation transcript:

Telecommunication Rooms Telecom Cabling Telecommunication Rooms

Telecom Cabling Telecommunications rooms (TR) are covered under TIA/EIA 569, these used to be called TCs (telecom closets). On many new construction sites the TRs usually do not have design details included in the blueprints, this means you may have to design on site. Today it is more common to have TR room details than ever before.

Telecom Cabling So far, we have started at the device, attached a patch cord to it, ran that to a wall outlet, then onto some UTP cable. Where does this cable go? The WAO horizontal cable will normally go to some sort of closet.

Telecom Cabling Normally, the horizontal cable ends up at an intermediary closet (IC), Intermediate distribution frame (IDF), or telecommunications room (TR) where it is cross-connected to a backbone system. Todays standards call for Telecom rooms (TRs) and they have very specific requirements.

Telecom Cabling IDF and MDF (main distribution frame) are terms used by the telephony industry in the days of the big monopoly company AT&T. IDFs can still be found in many old buildings and come in many sizes from an enclosure in the wall to a full fledged room. MDFs and IDFs historically only supported voice services, during the 1990s network switches were added to provide network services over CAT 3 cable operating at 10MHz.

Telecom Cabling Eventually as technology evolved so did the standards and the advent of telecom closets replaced IDFs. Today TCs are now telecom rooms (TR) because of their sophistication and the amount of equipment they house to support our high speed data networks. For many corporations and universities this meant finding an existing room to convert to a TR.

Telecom Cabling The TR will support hundreds if not thousands of cables which means an extensive ladder rack system will need to be installed. Rack systems will be discussed in another lecture. Per TIA/EIA 569 there should be a TR on every floor of a multi-story building and should be centrally located so that the distance to any work station does not exceed 295 feet.

Telecom Cabling One of the most important considerations for designing a TR is future proofing (future expansion and growth). Some of the design requirements established from the TIA/EIA 569 standard for TCs are: Dedicated to telecommunications function. Equipment not related to telecommunications shall not be installed, pass through or enter the telecommunications room.

Telecom Cabling Multiple closets on the same floor shall be interconnected by a minimum of one 78mm (trade size 3) conduit, or equivalent pathway. Minimum floor loading (50 lb/ft2). Minimum one closet per floor to house telecommunications equipment/cable terminations and associated cross-connect cable and wire. Located near the center of the area being served.

Telecom Cabling Horizontal pathways shall terminate in the telecommunications room on the same floor as the area served. One wall should have 20mm (0.75 in.) A-C plywood 2.4m (8 ft.) high. Lighting shall be a minimum of 500 lx (50 foot candles) at 1m (3 ft.) above finished floor (AFF). False ceilings shall not be provided.

Telecom Cabling Minimum of two dedicated 120V nominal non-switched duplex electrical outlet receptacles or equivalent, each on separate branch circuits. Additional convenience duplex outlets placed at 1.8m (6 ft.) intervals around perimeter, 150mm (6 in.) above floor. Access to the telecommunications grounding system as specified by ANSI-J-STD-607-A.

Telecom Cabling HVAC requirements to maintain temperature the same as adjacent office area. A positive pressure shall be maintained with a minimum of one air change per hour or per code. These are some of the general requirements for designing a TR, the technician on site will be responsible for the lay out of the equipment and space allocation of the termination fields. You may be asked by an electrician what the power requirements are for this space, refer to the above requirements.

Telecom Cabling Depending on floor space a TC might be located in the center of the space served, here we see the vertical riser system from the entrance facility up to the TCs.

Telecom Cabling The main cross connect (MC) is either a data center or a voice node (PBX room), voice and data services are patched into the building served. On a campus environment one data room may serve several buildings or a 100 buildings, like wise with the PBX room. The network services enter the building in the entrance facility (EF) historically known as the MDF.

Telecom Cabling The EF is also the intermediate cross connect point (IC) to the TC/TR which is the horizontal cross connect point (HC) to the WAO.

Telecom Cabling Lets take a closer look at the inside of a TR. The one of the things that needs to be addressed are the backboards that we will mount termination hardware to. The plywood specified by TIA/EIA 569 is AC (finished on both sides) ¾” fire retardant treated which must also be painted on all sides with two coats of light colored fire resistant paint.

Telecom Cabling The plywood will be used for mounting termination blocks and cross connect fields as well as other low voltage systems such as a PBX or security system. The voice and data equipment will be in close proximity to each other and the ladder rack system will anchor to the plywood.

Telecom Cabling The plywood starts just above the mop board (3”) off of the floor and extends the full 8 feet up.

Telecom Cabling Additional termination blocks can be added below the existing blocks for future growth.

Telecom Cabling Relay racks will be anchored to the floor in front of the termination fields and a ladder rack will “T” off the ladder rack mounted to the plywood.

Telecom Cabling Notice there are three locations where 4” sleeves enter the TR, you will have to consider how you are going to manage and route cable to the designated locations on the backboard and relay racks.

Telecom Cabling Small TR in progress.

Telecom Cabling Here is a TR design.

Telecom Cabling Remember to always consider future proofing in every thing you install, consider this if you fill up the sleeves on one side of the room then you need to add another 4” sleeve for future MACs (moves, adds and changes).