Denver Fire Alarm Test Prep

Slides:



Advertisements
Similar presentations
Code Analysis:Accessibility Colleen MacEachern & Stephanie Novak.
Advertisements

International Building Code
Classroom Safety. Fire & Life Requirements as per State Education Dept The following list relates to the classrooms and adjacent areas. They are provided.
OSHA Office of Training and Education
7 | Means of Egress (Life Safety Code)
Determining the Occupant Load
Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
Regulations (Standards - 29 CFR) Flammable and Combustible liquids
Flammable and Combustible Liquids
Flammable and Combustible Liquid & Compressed Gas Handling and Storage
ADA Enhanced Condo Client: Kelly Heller Blind 48 years of age Sculptor
Floor-Plan Dimensions and Notes
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
Telecommunication Rooms
Denver Fire Alarm Test Preparation Speed Drill © Ted Smitty Smith 2013.
NFPA 72 - National Fire Alarm Code Chapter 4 - Notification Appliances
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
Fired And Unfired Pressure Vessels
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Aspirated Smoke Detection
LOUISIANA DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
Local Application Total Flooding System: (NFPA 12) A system consisting of a supply of carbon dioxide arranged to discharge into, and fill to the proper.
N.F.P.A. 13R Justin Bohlmann FIR-204.
NICET Exam Prep Level II, Class 3.
Chapter 4: Air Leakage Control: Materials and Techniques
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
Patrick Thornton, SNS/FPE June 9, 2008
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Insulation and Infiltration
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
code calculations, construction drawings
Fire-Resistant Materials & Assemblies Part 2 Chapter 5.
Subpart F - Fire Protection & Prevention ( ) Flammables/combustibles - Approved containers Fire protection program/equipment 2A fire extinguishers.
Plumbing Radiant Heating & Cooling Turf Conditioning Permafrost Ice and Snow Melt Ecoflex ® SupportSustainabilityEngineered PolymerCommercial SystemsIntroductions.
Fire Detector Placement
Sprinkler Loads on Trusses Educational Presentation.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Steep Slope Roofing Systems. Based on the 2007 C.B.C. Presented by Oscar Davalos.
Flammable Liquids Directorate of Training and Education
Competency: Draw roof plans
NICET Fire Alarm Tech Level 1 Practice Test
Competency: Draw roof plans
Fire Alarm Systems for Emergency Operations of Elevators
NICET Fire Alarm Tech Level 1 Practice Test # 6
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Smoke Detector Installation Guidelines
NICET Fire Alarm Tech Level 1 Practice Test # 13
Calculations: Transformers and Service Conductor Calculations
NICET Fire Alarm Tech Level 1 Practice Test # 10
Two Minute Drill Number 29- Conductors and Raceways
Fire Alarm Tech Practice Test # 16 NICET
Competency: Draw roof plans
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
FIRE ALARM DRILL 26 © Ted Smith 2017.
Presentation transcript:

Denver Fire Alarm Test Prep Initiating Devices and Notification Appliances Ted “Smitty” Smith 2013

17.4 Initiating devices shall be protected from mechanical damage Protective guards must be listed for use with the device Duplicate terminals provided for the express purpose of supervising the wire Detectors installed in concealed locations above 10’ AFF shall be provided with remote alarm indicators Remote alarm indicators must in an accessible location and clearly marked for function and associated detector

17.5 General Requirements for Smoke and Heat Detectors Can not be recessed unless specifically listed for recessed mounting. Partitions and walls that extend to 15% of the ceiling height effective divide the room and the locations on each side shall be considered separate rooms

17.5.3.1 Total or Complete Coverage includes All rooms Storage areas Attics and lofts Other subdivisions of the building Inside all closets Enclosed stairways

17.5.3.1 Total coverage does NOT include inaccessible areas Exception: Not required in a blind inaccessible area if one of the following apply: Ceiling is attached to the underside of a combustible roof Space is entirely filled with non combustible insulation Spaces over room which do not exceed 50 square feet Spaces between facing studs which are closer than 6”

17.5.3.1 Total coverage does not require detectors below open grid ceilings if: Grid openings are ¼” or larger Material thickness does not exceed least dimension Openings account for at least 70% of the surface area Total coverage does not require detectors in plenums above suspended ceilings when each connection from the plenum to the HVAC system has a detector.

17.5.3.1 Total coverage does not apply to under open loading docks and shall not be required in accessible under floor spaces when: The space is not accessible for storage or entrance The space contains no equipment, pipes, wires or conveyors Floor over the space is tight No flammable liquids are on the floor above the space

17.5.3.2 and 17.5.3.3 Partial, Selective and Non0required coverage Intent is to protect against special hazards When installed must comply with NFPA 72 requirements as if it was a required area

HEAT DETECTOR GENERAL

17.6.1 Heat Detectors- General Heat detection design docs has to include the performance objective of the system Must be marked with a color code or numerals at least 3/8” to indicate temperature Temperature of the detector shall be at least 20 degrees F above the maximum expected temperature at the ceiling.

17.6.3 Heat Detector Location and Spacing Can not exceed their listing Detectors shall be located ½ their listed spacing from walls and partitions within the top 15% of ceiling height All points on the ceiling shall have a detector within .7 of the listed spacing Ceiling mount detectors shall NOT be mounted within 4” of the sidewall Wall mounted heat detectors shall be mounted between 4” and 12” of the ceiling Line type heat detectors shall be mounted within 20” of the ceiling unless mounted on the bottom of joists and beams

17.6.3.2 Solid Joist Construction Joists project down more than 4” and are spaced 3’ or less Requires heat detectors be mounted on bottom of joists Spacing perpendicular to the joists shall be reduced by 50%

17.6.3.3 Definition: Beam project down more than 4” and spaced more than 3’ A ceiling is considered to be a smooth ceiling if the beams project no more than 4” from the ceiling Spacing at right angles to beam travel not more than 2/3 listing for 4.1” to 18” More than 18” and more than 8’ on center: Each bay considered a separate area

17.6.3.3 Beams less than 12” and less than 8’ on center detectors can be mounted to the bottom of the beam Ratio rules: D/H Beam depth to Ceiling Height greater than .10 in Beam Pocket, Less than .10 on beam bottom W/H Beam spacing to Ceiling Height greater than .40 in Beam pocket, less than .40 on beam bottom

17.6.3.4 Sloped Ceiling (Peak and Shed type) Less than 30 degrees, all detectors spacing using height at ceiling 30 degrees plus: all detectors, except those at peak, spaced using average slope height or height of peak Row of detectors first placed at or within 36” of the peak

17.6.3.5 Ceiling Heights up to and including 10’ shall use heat detector listed spacing Ceiling Heights above 10’ and up to and including 30’ shall reduce spacing using table Minimum spacing for heat detectors shall not be required to be less than .4 times the height of the ceiling

SMOKE DETECTORS

17.7.1.11 During construction if installed for signaling shall be cleaned and verified to be within listed sensitivity During construction if not operational must be protected and then verified to within listed sensitivity or replaced Where detection is not required during construction they should not be installed until AFTER clean up

17.7.3 Detectors installed on the sidewall shall have some portion of the detector within 12” of the ceiling Smoke detectors installed under raised floors shall be mounted in their listed orientation Default spacing listing is 30’ unless otherwise marked All points on the ceiling shall a detector within .7 times the selected spacing

17.7.3.2 Solid Joists and Beams Beam depth less than 10% of ceiling height shall be considered a smooth ceiling Detectors permitted either on ceiling or on bottom of beam 10% or greater 40% or greater detectors in pockets Smooth ceiling in parallel to beam ½ smooth ceiling perpendicular to the beams

17.7.3.2 Sloped Ceiling with Beam Parallel For sloping ceilings with the beams running parallel up the slope Detectors shall be located within the pocket The ceiling height is the average height over the slope Smooth ceiling shall be permitted within the beam pocket parallel to the beams

17.7.3.2 For beam depths less than or equal to 10% of the ceiling height detectors shall be located with smooth ceiling spacing perpendicular to the beams For beam depths greater than 10% of the ceiling height the following applies for perpendicular spacing to the beams: Where beam spacing is equal to or greater than 40% of the ceiling height, detectors shall be located in each pocket Where beam spacing is less than 40% of the ceiling height detectors shall not be required to be in the pocket but shall be spaced not greater than 50% of smooth ceiling spacing

17.7.3.3 Sloped Ceiling (Peaked and Shed) For sloped ceilings with solid joists, smoke detectors shall be located on the bottom of the joists For peaked ceilings, smoke detectors shall be located within 3’ of peak For shed ceilings, smoke detectors shall be located within 3’ of the high side For both peaked and shed ceilings, spacing shall be based on a horizontal projection of the ceiling (measured horizontally, not down the slope)

17.7.3.4 Raised Floors and Suspended Ceilings Spaces above suspended ceilings and beneath raised floors shall be considered separate areas for smoke detector spacing Smoke detectors located in concealed areas shall not be a substitute for open air detectors

17.7.3.6 Air sampling Detectors Each port of an Air Sampling type smoke detector shall be treated as a spot type smoke detector for the purposes of location and spacing Max transport time from the farthest sampling point shall not exceed 120 seconds Air sampling detectors shall give a trouble signal when air velocity is outside manufacturers specified range

17.7.3.6 Air sampling system piping shall be labeled with SMOKE DETECTOR SAMPLING TUBE. DO NOT DISTURB Air sampling tubes shall be labeled: At changes in direction or branches of piping At each side of penetrations At intervals of piping not greater than 20 feet

17.7.3.7 Projected Beam Detectors Projected beam detectors using mirrors shall be installed according to the manufacturer’s instructions (normally reduce spacing by 1/3) A projected beam-type detector shall be considered equivalent to a row of spot-type smoke detectors ***On smooth ceilings, spacing of not more than 60 feet between beams and 30 feet from a sidewall should be used as a guide

17.7.3.7 ***Projected beams may be suspended from the ceiling instead of wall mounted, with the transmitter and receiver no more than ¼ the selected spacing from the end walls

17.7.4 Heating, Ventilating, & Air-Conditioning (HVAC) Plenum areas require the use of smoke detectors listed for such use, (HVAC) Smoke detectors in ducts or plenums are not a replacement for open area detection ***Detectors should not be located closer than 36” from an HVAC supply or return opening

17.7.5.5 Duct Smoke Detectors Detectors installed in the air duct systems shall not be a substitute for open air detectors NFPA 90A – Detectors approved for air duct use shall be installed on the supply side of the air handling system per NFPA 90A (greater than 2000 cfm supply), return side duct detectors for greater than 15,000 cfm (return serving 2 or more floors)

17.7.5.5 Detectors installed in air ducts hall obtain a representative sample of airstream Detectors may be mounted: Rigidly with the duct On the wall of the duct with the sensing element protruding into the duct Outside the duct with sampling tubes protruding into the duct, through the duct using projected light beam

17.7.5.5 The location of all detectors installed in HVAC duct system shall be clearly and permanently recorded Detectors mounted outside the duct shall allow verification of airflow through the detector All penetrations of the air duct in the vicinity of a detector shall be sealed

17.5.5.6 Door Release Detectors Open area detectors can be used for door release service When door release is accomplished directly from the smoke detectors, they shall be listed for door release service For door release service, when the door header is 24’ or less from the ceiling 1 ceiling mounted or 2 wall mounted detector(s) shall be required

17.5.5.6 For door release service, when the door header is greater than 24” on one side only 1 ceiling mounted (on higher side) or 2 wall mounted detectors shall be required For door release service, 2 ceiling or wall mounted detectors shall be required 1 on each side of the door when the door header is more than 24”, on both sides, from the ceiling For door release service when using detectors specifically listed for door frame mounting; only one detector shall be required

17.5.5.6 When using integral door closer/smoke detectors 1 detector shall be required When door release is intended to prevent smoke transmission in one direction only, 1 detector shall be required on the side of smoke confinement Where multiple doorways exist and the distance between them exceeds 24”, they shall be treated separately

17.5.5.6 Where ceiling mounted detectors are installed for single or double doorways they shall be installed: On the centerline of the doorway No more than 5’ measured along the ceiling and perpendicular to the door Away from the door a distance equal to or greater than the depth of the door header or 12” whichever is greater

18.3 Nameplates for notification appliances shall include electrical requirements Nameplates for appliances shall include rated audible or visible performance or both Nameplates for appliances shall include their operation parameters or reference their installation documents which have that information

18.3 Appliances used in special environments shall be listed for such use Appliances used for signaling other than fire shall not have the word “FIRE” or any fire symbol on it Appliances shall be mounted and supported independently of their conductors Appliances shall be provided with terminals or leads such that connections are monitored for integrity (supervised)

18.4.1 An average ambient sound level of 105 dBa shall require a strobe The total sound pressure shall not exceed 110 dBa anywhere in the occupied area Sounds from normal or permanent sources lasting more than 60 seconds shall be included in ambient sound level measurement, sounds from temporary or abnormal sources are not required to be included Voice/comm. Systems shall be prerecorded, synthesized , or live and have voice intelligibility