MOD 232 Proposal, Richard Dutton 16th December2008

Slides:



Advertisements
Similar presentations
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
Advertisements

PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Future Funding Allocation for Change Development  Action came about during discussions on BSC panel  The analysis of change and development of potential.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Distribution Network Interruption - Initialisation 28 September 2010.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
© Energy UK April 2012 Modification 435 Workgroup Alternative approaches to NDM Compensation 19 February 2013
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Background Current balance of LDZ System and Customer charges
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Market Operations Engagement Group EVSE Working Group – Principles
UNC Modification Proposal 0202 National Grid Distribution
Review of Demand Estimation Times for Modification Proposal 461
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
User Pays Funding – Potential Licence Mechanism
Transmission Workgroup 7th July 2011
Gas Performance Assurance Framework March 2013
MOD570 Obligation on Shippers to provide at least one valid meter reading per meter point into settlement once per annum 25th February 2016 Angela Love.
Energy Justice – the policy challenges
Mod 0621 Amendments to Gas Transmission Charging Regime
Review Group 178 SSP as Domestic only.
Modification th July 2008.
Connected System Exit Points Administration Options
Potential Nexus Topic: Universal Single Meter Point Supply Points
User Pays – Changed & New Services
Consideration of issues raised by UNC Modification Proposal 0244
Transmission Workgroup June 7th 2012
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Connected System Exit Points Administration Options
GTAC Workshop Block 1 10 July 2018.
Mod 0621 Amendments to Gas Transmission Charging Regime
SETS: Windfall Avoidance Measures
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
UNC Transmission Workstream 7th December 2006
Project Nexus Workgroup
Consideration of issues raised by UNC Modification Proposal 0244
Entry Overrun Calculation
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Project Nexus Market Differentiation Formal Market Separation
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Modification 421 – Updates and Benefits Case
Gas Performance Assurance Framework February 2013
Overview of RbD Risk Modelling 31 March 2008
UNC Modification Performance Assurance Framework Incentive Regime
APX OCM Collateralisation
Modification Proposal 136
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

MOD 232 Proposal, Richard Dutton 16th December2008

Background Follows on from Development Workgroup 194 This proposal is concerned with the allocation of costs associated with Unallocated Energy not principally with how the costs are derived The proposal provides a mechanism that will facilitate competition in the supplier community

The Proposal Follows the existing Shrinkage model, except this element of “Shrinkage” will not be subject to existing Shrinkage Incentives Take the “agreed” quantity of Unallocated Gas, for the industry as a whole, and purchase this in the same way as Shrinkage is currently purchased for Take the costs of this purchase and allocate via the existing DN charging methodology This allocation should take into consideration each market sector This Unallocated Gas should be removed from the Daily Allocation in the same way as Shrinkage currently is

The benefits A simple solution, for DNs, drawing on a framework that is already in place A simple solution, for ALL Suppliers, allowing them to use existing methodologies to pass on this cost, thereby mitigating risk to Suppliers This mitigation of risk facilitates competition The facilitating of competition is one of the key conditions in the GDNs license This is an industry wide problem requiring an “industry wide solution” Many of the issues do not sit solely with the Supplier Orphan meters for example It is a targeted solution, both in terms of Domestic/I&C split and cost per supply point Fixed, banded or directly proportional to AQ

The benefits It is because the costs are so unclear and ambiguous that a mechanism should be considered that allows the Suppliers to pass these costs through It is because the costs are potentially so large that a mechanism should be considered that allows the Suppliers to pass these costs through