The builders experience – mere compliance to enhanced performance Sustainable new homes and sound insulation conference Dave Poole.

Slides:



Advertisements
Similar presentations
Quality and Outcomes Framework Assessor Training Skills in note-making, summarising and report writing Module S5.
Advertisements

Contracts for Builders Ross Kinzler, Executive Director.
Fire Risk Assessments – Are You Competent?. Fire safety legislation requires that, for most premises except private dwellings, a fire risk assessment.
Robustdetails Sean Smith. robustdetails Part E Robust Details Contents Robust Details: A&AC Process New RDs New Candidates A&AC.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. INTRODUCTION HOW DOES A CONTAINER BECOME HOUSE? DESIGN EXAMPLES A NEW HOME IN 12 STEPS TECHNICAL SPECIFICATIONS.
HOUSING SOUND INSULATION & SUSTAINABLE DEVELOPMENT Dr Sean Smith Building Performance Centre Napier University Scottish Executive – Victoria Quay BPC.
1 Making buildings better Building Tight Chris Knights.
Robustdetails robustdetails The Inspectorate aims to provide a high level of confidence in the robust details scheme. It is effectively.
Welcome to Energy efficiency for gas-fired and oil-fired domestic heating and hot water systems Session A: Course introduction.
Thermal Bridges in new Dwellings..... Accredited details – Designing & detailing for Compliance Danny Kearney Main changes to Part F for dwellings.
Timber Framed Structures
ALO Planning & Assurance Requirements
Tom Dollard Head of Sustainability Pollard SME Builder’s Book Consultation.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Let’s Face it. It’s your Choice …. Hebel AAC Panel Timber Products Masonry Block Brick It’s your choice ofFacade… Landscaped CFC Sheeting Colorbond Sheeting.
Building Methods Types of Structure.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
1 PRACTICAL RELIABILITY OF POWER FILTERS IN CRITICAL APPLICATIONS Presented by Will Turner MEng, Senior Design Engineer, MPE Limited, UK EMCUK, Newbury,
1 Conclusions Green Buildings. 2 Vancouver Building By-law Building Code Development in Canada 2010 NBC 2012 BCBC BC Variations += 2012 BCBC 2012 VBBL.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Prof. David Strong, Chief Executive, Inbuilt Ltd. Good Homes Alliance Christmas Event, The Princes Foundation 9 th December 2009 SAP, Building Regulations.
Prefabricated Timber Frame Construction
Consumer Code for Home Builders Noel Hunter Chairman 1.
Steve Jones, SHEQ Manager (Emergency & Critical Services)
Standards and Standardization. Standard Levels Standards preside according to the level. Their effect, image and their scope of work change from one level.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
C & S Township Pvt.Ltd.. About Company  M/s C & S Property Developers is a U.K. based leading company having a vast experience of more than 40 years.
1 Augean plc Hazardous waste management services.
Energy surveying qualifications and procedures West Midlands Housing and Energy Conference 2007.
Consumer Code for Home Builders Carol Brady Secretariat 1.
The New Housing Fraud Legislation ROBERT DARBYSHIRE RICHARD PRICE 9 ST JOHN STREET.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
BUILDING BETTER RELATIONSHIPS MARY LYNCH. BREAKING DOWN THE BARRIERS.
Neil Cooper Fire Safety Residential Implementing the Changes.
WALLS.
Quality Assurance. Define Quality (product & service) Exceeds the requirements of the customer. General excellence of standard or level. A product which.
Robustdetails Feedback from Robust Details Technical Advisors.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
* Registered WSH Officer * Registered Environmental Control Officer * MOM Approved Risk Consultant * MOM Approved WSH Auditor * MOM Approved Trainer for:
PAUL GRIMSHAW. FIRE ISSUES IN LITIGATION Leaky Building Litigation – Traditional Defendants Council Builders Developers Architects Cladding manufacturers.
Adding value through health and safety. Introduction to Portakabin Part of the Shepherd Group - a family company with family values Cares for employees;
Aaron Nicholson Beca. by Aaron Nicholson C/VM2 Design vs Non C/VM2 Performance Based Design.
Refer to slide robustdetails robustdetails.
The Design Team Carl James.
AN EVOLVING PARTNERSHIP: Home Builders and Acoustic Experts
Sustainable new homes and sound insulation 2006
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
Regulation and compliance with performance standards
UPPER FLOORS TIMBER AND CONCRETE.
Refer to slide robustdetails robustdetails.
Helping to Protect Children
Building Methods Types of Structure.
Energy Efficiency Standard for Social Housing (EESSH)
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Home Loan Company in Pune Maharashtra India Tirupati Invest Services
Project Development and Managing your Build Agenda
Wood Structures Topic 8 Quality Workmanship
Next Steps Safety Standards Service V1.1.
BRC Packaging ISSUE 5 Global Standard for Packaging and Packaging Materials.
The Code for Sustainable Homes Les Fothergill Sustainable Buildings Division
Chemical Purchasing.
Housing Standard Review & Building Regulation changes
Robyn Gwilym &Paul Atherton
Insert Render Image Here
Insert Render Image Here
Kay Higby Responsible Care Superintendent ISO Management Representative Akzo Nobel Functional Chemicals, LLC.
BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound
British Woodworking Federation
Contract Requirements for Suppliers
Presentation transcript:

The builders experience – mere compliance to enhanced performance Sustainable new homes and sound insulation conference Dave Poole

Safety first So you think you have problems!

Pre 2003: Case Study 1 Houses n ADE Deemed to satisfy constructions – The cost of failure! n Post occupation remedial costs

Pre 2003: Case Study 2 Apartments n Fencing / skips / protection to common areas + labour n Post occupation remedial costs n Removal / storage / return of furniture & soft coverings n Hotel accommodation for occupiers – 12 weeks n Remove & replace wall coverings / kitchens / electrics & bathrooms n New ceilings and flanking wall treatments + cleaning & redecoration

Pre-completion Testing (PCT) Requires PERSON CARRYING OUT THE WORK to ensure: Appropriate sound testing is carried out Give results to BCB no later than 5 days after completion

ADE Guidance constructions n Built correctly example constructions achieve sound insulation requirements n PCT - Proof of performance as built n Testing raises standards! n Assured customer satisfaction? n if built correctly should meet the requirements n Failed tests n Remedial works n Delay in legal completions n Additional testing n Costs and litigation

robustdetails Register each plot with RDL Build in accordance with the relevant RD specification Give registration document to the BCB [before work starts]

robustdetails approach n Robust Detail Status n Familiar construction n Meets thermal performance n Cost effective n Poor visibility n Continuity of batts n Blockwork joints n Checklists not completed

No Check sheets filled out as yet! Site Manager unaware of need to use Check sheets! Site Manager unable to confirm density of blocks used in Party or Flanking walls! Parge coat was smooth! Wall ties to Party Wall are not the correct type! Cavity width varied – in places less than 75mm!

Post 2003: Case Study 3 Houses n Constructions outside the Guidance and robust details n Range 52 – 58D +C ntwtr

Beyond Compliance n A commitment to carry out a programme of PCT based on frequency and performance n 1 credit = 50% of walls / floors ADE pass n 2 credits = 75% of walls / floors ADE pass n 3 credits = 75% of walls / floors ADE + / - 3dB n 4 credits = 75% of walls / floors ADE + / - 5dB (Based on 6No dwellings of the same type)

PCT sample data

Industry wide training needed!