Oulu City Hospital. Parking house Oulu University Hospital Service tunnel Old City Hospital A B C Oulu City Hospital Central loundry Site plan.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
3/5/14. Work is nearly complete. Containment to be removed in the coming weeks. Hourly checks on the space temperature have ensured proper environment.
Don Priebe - January 2013Syracuse First Time Preparer Training1 Residential Energy Credits No major changes for TY 2012.
30 MW Webberville Solar Plan Update Hosted By: Gemini Solar – John Street Village of Webberville – Hector Gonzales, Mayor Austin Energy – Ed Clark October.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Our school is situated in Markou Mpotsari street, opposite the Court House and close to the Medrese Mosque and the Apostle Paul’s Altar. It is about an.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
Elevations.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Choosing a building system 1. Physical limitations: Size of the land How heavy a building can the soil support How long a structural span is feasible What.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
DER – Before, During and After: A Homeowner’s Perspective.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
Watch University Grow January 2009 University Hospital’s new Heart & Vascular Institute, a four-story, 199,000-square-foot facility consolidates all state-of-the-art.
Winchester Medical Center Campus Expansion June 21, 2011.
Werkok, Sudan Update 2008 Partners in Compassionate Care.
Who we are Orrix Homes Jeremy Laviolette Dylan Kugler Board of Directors John Giesbrecht Rick Kugler.
Holland High School Construction Update June 8, 2011.
Competency: Draw exterior elevations
Chapter 28 Structural Components of Framed Construction.
Chapter 12 Network Scheduling Techniques. Scheduling Techniques Gantt or bar charts Gantt or bar charts Milestone charts Milestone charts Line Balancing.
Watch University Grow April 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council March 13, 2012.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Tyler Junior College Critical Infrastructure & Renovation Update Spring 2010.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
Click here for the LIVE WEBCAM
Aerial of the full site facing northeast taken on March 1, 2016.
Foundations of Technology Construction
Major Steps In Building a SFR
Click here for the LIVE WEBCAM
Boiler Room Atmospheric Boiler Power Boiler.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Upcoming Activities Fun Fact Click here to view the live WEBCAM
The Steps for Basement Renovations
DrawING exterior elevations
Competency: Draw exterior elevations
Huntsville City Schools Huntsville High School Softball
Lafayette New Terminal Program Update
Carleton College Summer 2018 Science and Campus Construction Plan
Progress Report 11/10/11.
Improvements for 2016 & 2017 Todd Harris Maintenance Manager
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
Minuteman Vocational Technical Regional High School Progress
Moisture and Poor Ventilation
Children’s Hospital Update
KOMPLEX Investors Report – Q
Lafayette New Terminal Program Update
Far Experimental Hall Hutches Civil Construction
1057 G Street, Burwell, ne Location:
New White Lake Township Library
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Community Practice Asset Management.
Presentation transcript:

Hospital of the Future Construction Update as of Dec. 3, 2010

Hospital of the Future West side of the building.

Hospital of the Future View of brick work from Springfield Street.

Hospital of the Future Green Roof (install spring 2011).

Hospital of the Future Basement boiler started early Nov. to provide temporary heat during construction.

Hospital of the Future Basement air handler unit started in early Dec. for temporary heat during construction.

Hospital of the Future Endovascular procedure rooms support steel duct installation ongoing.

Hospital of the Future Endovascular procedure room coordination complete, released for fabrication.

Endovascular procedure room coordination (each room = 200 hours of configuration).

Hospital of the Future 2 nd Floor: CARE area drywall underway.

Hospital of the Future 3 rd Floor: Rough-in complete; drywall underway.

2011 Facility Milestones to Come: Finished ceilings begin. Exterior landscaping begins. Final painting begins. Phase 1 construction complete NEW PATIENT AREAS OPEN!