Chatham-Kent Health Alliance Facility Renewal and Capital Infrastructure Needs Tri Board Meeting October 26, 2010.

Slides:



Advertisements
Similar presentations
1 Compliance & Credits: The Tools, The Rules and How They Affect Your HUD Multifamily Housing Project (Real Estate Assessment Center Inspections) Presented.
Advertisements

Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
East Hampton High School July 2013 – July 2014 Design Phases.
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Energy Efficiency: Benefits to Apartment Owners & Tenants
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Cathedral of the Immaculate Conception Project Information Session.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
BSA Health System, May 2009 Next Slide Previous Slide BSA HEALTH SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All.
1. 2 Earthquake effects on health care facilities 2.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
North American Mechanical Inc. School District of Cambridge A Business Relationship Presentation Use our energy to save yours®
Architectural Practice of the Year Building Awards 2007
ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Murray River Project Update Coal Forum October 2013.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
Energy Saving in Hospitals: Hong Kong Initiatives
Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005.
Constellation Heating and Cooling Building Automation Systems.
Utility Management Providence Health System - Oregon Environment of Care.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Farmworker Housing Inspections Unit 3: Conducting the Inspection.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Repairing of Building Services Engineering Systems Rak Repair Methods of Structures, exercise (4 cr) Esko Sistonen.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Business Owners and Managers and the Fire Code
Building Codes and Interior Design
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Tangible Property Regulations Presented by David W. Jennings, CPA.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013.
Services Currently Provided  FHA/ADA Inspections  Bank Draw Requests  Existing Condition Documentation Services.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
Upon completion of this module, you will be able to:
Capital Projects Requests
Fall 2017 Update: Physical properties and sinking fund
Dr. Joseph Meloche Superintendent of Schools Mrs
Electrical Gas Plumbing Heating & Cooling
UNION GROVE ELEMENTARY REFERENDUM
2018 Bond Review and Proposal
2007 Bond Issue Capital Improvement Program
Master Facilities Committee Evaluation and Identification
Building standards Mr. Da Silva.
Understanding the Replacement Reserve
Community Practice Asset Management.
Presentation transcript:

Chatham-Kent Health Alliance Facility Renewal and Capital Infrastructure Needs Tri Board Meeting October 26, 2010

Facility Renewal and Capital Infrastructure Needs October 2010 Chatham-Kent Health Alliance is a partnership of 3 hospital corporations: Public General ( PGH), St. Josephs Hospital ( SJH) and Sydenham District Hospital (SDH). Request to review current state and capital needs for facility upgrades PGH – dates back to 1954 SDH – dates back to 1955 Both facilities have reached a critical point in their life expectancy and are in need of major investment to maintain patient and staff safety.

Facility Renewal and Capital Infrastructure Needs October 2010 !magine redevelopment project is 10 plus years away Inadequate resources available over the years to support infrastructure upgrades Sydenham and Public General buildings are outdated and do not meet code in many areas, (i.e. building, medical gas, fire codes, etc.)

Facility Renewal and Capital Infrastructure Needs October 2010 Costs are estimates Many upgrades cannot be done in isolation of one another Any changes to current systems will require all code upgrades Significant capital facility upgrades will require Ministry approval Cannot bring certain systems up to code given building structure limitations Does not include capital needs for the SJC or offsite properties, i.e. 47 Emma, MHA, adjacent houses. Multi-year coordinated plan and dedicated annual resources required to proceed with any upgrades

Facility Renewal and Capital Infrastructure Needs October 2010 References used: Cohos Evamy Facility Audit Report July 2009 Honeywell Energy and Facility Renewal Report 2009 Emergency Department Hay Study 2009 (LHIN study) Asbestos Audits – Advanced Environmental Corporation 2007 Stantec Facility Audit Report SDC 2005 Applied Building Sciences LTD Facility Audits – 2002 & 2004 PGC and SDC Additional Inspections, i.e. Medical Gas, Fire Marshall, HIROC, Roofing Inspections, etc. External Contractors and CKHA Engineering Staff

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus

Roofing Cost Estimate $1,000,000 Multi-Year project will be complete $ not included in total request

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Roof Replacement Plan

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Windows Cost Estimate $ 1,500,000 Connected to envelope deterioration project Add: Building Envelope Asbestos Abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Exterior Window

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Interior Window

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Building Envelope Cost Estimate $ 1,500,000 + Connected to Window deterioration project Add: Window Replacement Asbestos Abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Heat Loss from Building Envelope

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Balconies Cost Estimate $330,000 Deterioration to the point of unsafe Do not meet code Currently locked for safety, no access Add: Building Envelope repair if balconies need to be removed

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Exterior Balcony

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Fire System Upgrade Cost estimate $ 1,000,000 Does not meet code Currently equipped with smoke and heat detectors Must bring up to code when doing any renovation (only 2 sprinklers at present time) Add: Structural changes (Ceiling heights) Asbestos abatement Electrical upgrade

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Elevators Upgrade Cost Estimate $ 250,000 Interior Upgrades 2010 – floors, walls, lighting Control Systems need complete upgrade Only one elevator accommodates a stretcher Add: Electrical system upgrade Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Elevator Mechanical Room

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Elevator Control Panels

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Ventilation System Upgrade Cost Estimate $5,000,000 - $7,000,000 End of life, does not meet code Current ceiling heights do not allow for proper replacement to meet code Add: Structural Changes (ceiling heights) Electrical upgrade Fire system upgrade Medical gas system upgrade Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Operating Room Air Handler Manual controlled, No humidification – original unit

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus General Air Supply – East Wing Dampers are not working, over 15 years ago 35% of coils were removed do to coils were leaking (frozen), no humidification Never reinstalled

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Medical gas system upgrade Cost Estimate $ 500,000 System does not meet code, any changes to the system will require the entire system be brought up to code Add: Structural changes (walls and ceilings) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Asbestos Abatement Cost estimate $ 2,000,000 Must be factored in to any and all changes to SDC Add: Structural changes (walls and ceilings)

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Sanitary and Storm drain piping Cost Estimate $ 3,000,000 Does not meet code (Asbestos piping) Current piping is all cracked Requires major demolition to access prior to any potential repair Add: Structural changes (walls and ceilings) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Plumbing Stack – Deteriorated Sewer Piping

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Deteriorated/ Cracked Piping all located in brick pipe chase

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Discovery of Sewer Piping Installation, after leak investigation

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Waterlines Cost Estimate $ 2,000,000 Does not meet code (galvanized piping) Current piping is corroding Risers are located in brick pipe chases Add: Structural changes (walls and ceilings) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Hot Water Supply Line Corrosion

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Discovered During Recent Repair - Laundry

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Boilers - Replacement Cost Estimate $ 200,000 End of life RFP issues September 2010 for replacement of one boiler Add: Electrical upgrade Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Steam and Hot Water Boilers

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Deteriorated Boiler Tubing

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Chiller Replacement Cost Estimate $ 275,000 End of life Supplies only the OR Add: Electrical upgrade Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Operating Room Chiller

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Heating system upgrade (Radiant heating) Cost Estimate $ 210,000 End of life Add: Structural changes (walls and ceilings) Asbestos abatement There is an in-floor heating system on the first floor in part of the emergency, ambulatory care department and both side of the hallway in the West wing. Source of leak cannot be located as system is buried in concrete. This system is shut down and not in use.

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Electrical system upgrade Cost Estimate $ 1,000,000 System is obsolete Does not meet code Switched are no longer manufactured Add: Structural changes (ceilings and walls) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Old Electrical Panels

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus OR Upgrades Cost Estimate $ 1,000,000 Does not meet current code and standards Consideration should be given to closing this section if continues to function as regular OR Add: Electrical upgrade Medical air systems upgrade Ventilation system upgrade Structural changes (walls and ceiling) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Installation of negative pressure rooms Cost Estimate $ 500,000 Currently no negative pressure room Safety risk for airborne illness Current patients transferred to Chatham Add: Electrical system upgrade Medical air system upgrade Plumbing system upgrade Ventilation system upgrade Structural changes (walls and ceiling) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Removal of Sewer tank Cost Estimate $ 40,000 – $ 50,000 Current Emergency Department partly build on a sewer holding tank Capital plan – drain and connect to municipal line

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Structural/Building reinforcements upgrade Cost Estimate $ 2,000,000 Any changes in use or modification to the floor layout of the 1967 structure will require reinforcement of the structural system below the affected area. (Cohos pg. B-3)

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Renovation to patient rooms Cost Estimate $ 4,000,000 Current rooms do not meet code Washrooms are small and inaccessible Do not meet Infection Control standards – sinks are located outside of washroom Add: Plumbing upgrade Electrical system upgrade Ventilation system upgrade Medical air system upgrade Structural changes (walls and ceiling) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Patient Washroom & Outside Sink

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus ED Renovations Cost Estimate $ 500,000 Emergency Department LHIN Hay study - physical plant is inadequate by current standards

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus Accessibility Accessibility for Ontarians with Disabilities Act, 2005 (AODA) Unable to determine cost at this point Add: Structural changes (walls and ceilings)

Facility Renewal and Capital Infrastructural Needs October 2010 – Sydenham Campus We require an investment of approximately $27,000,000- $30,000,000 to maintain this facility in an acceptable state Costs are construction related costs only. Relocation, moves, temporary set ups etc. needs to be factored into to overall project Additional Engineering study required if direction is to proceed with only sections of the building upgraded as systems are interconnected Recommendation – dedicated resources to maintain facility while proceeding to fast track cost of a new facility

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus

Roofing Cost Estimate $ 500,000 Multi year roofing plan in place HIRF investment planned for 2010

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Ventilation system upgrade Cost Estimate $ 4,000,000 End of life Does not meet code Current ceiling heights do not allow for proper replacement to meet code Add: Asbestos abatement Electrical system upgrade Structural changes (walls and ceiling)

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Obsolete Air Handling Unit PG.A43 Induction unit, Perimeter heating and cooling Dampers not working (manual controlled)

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Obsolete Air Handling Unit PG.A45 Part of Maternity SE/SW

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Fire system and wiring upgrade Cost Estimate $ 295,000 Some PGC is already done from previous renovations Other does not meet code, must bring system up to code when doing any renovations Add: Structural changes (ceiling heights) Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Building Envelope Cost Estimate $ 1,500,000 Moisture penetration from outside walls Repairs were done on South and South East walls Add: Asbestos Abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Exterior Pillar

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Exterior Concrete Wall

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Medical gas systems upgrade Cost Estimate $ 500,000 Some upgrades were done with previous renovations Does not meet code Any changes to the system will require the entire system be brought up to code Add: Structural changes (walls and ceilings) Asbestos abatement required system shutdown for changes

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Elevator upgrades Cost Estimate $ 1,000,000 2 Elevators on the West wing 3 Elevators in the Centre 1 Elevator in centre is completely shutdown Add: Electrical system upgrade

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Center Elevator Mechanical Room

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus West Elevator Mechanical Room

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Asbestos Abatement Cost Estimate $ 2,000,000 Must be factored in to any and all changes to PGC Some areas amount and content is undetermined due to triple ceilings

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus West Mechanical Room – Interior Asbestos Walls

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Structural/Building reinforcement upgrades Cost Estimate $ 2,000,000 Any building expansion or changes, the existing foundations will need to be under pinned and enlarged to accommodate the additional loads

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Electrical system upgrade Cost Estimate $150,000 Replacements of obsolete panels Some areas were upgraded under previous renovations

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Electrical Panels

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Sanitary and storm sewer piping Cost Estimate $ 3,000,000 Current underground piping is deteriorated All underground piping repair need extensive construction to access (few have been done) Add: Asbestos abatement Structural changes (walls and ceilings)

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Starting of Corrosion – Sewer Piping PGC

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Sinks and toilet fixtures Cost Estimate $ 125,000 Infection controls issue as identified (overflow drains do not meet code)

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Heating system upgrade (radiant heat) Cost Estimate $ 250,000 End of life Add: Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Obsolete Terminal Induction Units - Patient Rooms – Original System 1969

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Installation of additional Negative pressure room Cost Estimate $ 100,000 Infection control and safety risk for patient and staff Add: Structural changes (walls and ceiling) Electrical upgrade Medical air system upgrade sprinkler system upgrade Ventilation system upgrade Asbestos abatement

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Medicine A/B, Patient room and washrooms accessibility Cost Estimate $ 300,000 Small, limited accessibility, patient and staff safety Changes needed to get patient beds into rooms Identified as safety issue at Executive Leadership Council Safety inspection

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Accessibility Accessibility for Ontarians with Disabilities Act, 2005 (AODA) Unable to determine cost at this point Current building does not meet code under Accessibility legislation

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus We require an investment of approximately $16,000,000 to maintain this facility in an acceptable state Costs are construction related costs only. Relocation, moves, temporary set ups etc. needs to be factored into to overall project Additional Engineering study required if direction is to proceed with only sections of the building upgraded as systems are interconnected

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Recommendation: Dedicated capital resources needed annually for next 5-10 years to maintain building to acceptable levels Continue to proceed with Master Program/ Master Planning costing out complete renewal replacement

Facility Renewal and Capital Infrastructure Needs October 2010 – Public General Campus Next Steps Priority list – safety issues and required capital Site visit with Engineers from Cohos Evamy October 28, Additional assessment and recommendations of capital projects as it relates to future development Clear vision of Sydenham site Contingency plans Dedicated capital

Facility Renewal and Capital Infrastructure Needs October 2010 – Sydenham Campus and Public General Campus This report was prepared by: Beth Hall Director, Support Services Harrie Bos Manager, Engineering Services