&file 22/02/2019 National Programmes under the National Emission Ceilings Directive (NECD) André Zuber, European Commission, DG Environment Working group.

Slides:



Advertisements
Similar presentations
Reporting of Abatement Plans 7 th EIONET Meeting 19 March 2002 Juergen Schneider.
Advertisements

The Convention on Long-range Transboundary Air Pollution and EMEP (The Cooperative Programme for Monitoring and Evaluation of the Long-range Transmission.
1 Introduction, reporting requirements, workshop objectives Workshop on greenhouse gas and ammonia emission inventories and projections from agriculture.
European Commission: DG Environment Perspectives of the NECD-revision towards reporting and projection obligations for EU Member States and the EU TFEIP,
European Commission: DG Environment Streamlining and harmonizing climate change and air pollution requirements TFEIP, 23 – 24 May 2007, Dessau Eduard Dame.
10/11/2015 National Renewable Energy Action Plans: Towards the EU Renewables 2020 Targets EUFORES 10th Inter-Parliamentary meeting - Madrid, 16 April 2010.
Creating the environment for business National Emission Ceilings Directive Review Workshop on Plans and Programmes of Air Quality and National Emission.
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels CAFE and the NECD review Stefan Jacobi European Commission, DG Environment,
Water.europa.eu Assessment River Basin Management Plans CIS Strategic Coordination Group meeting Brussels, May 2011 Marieke van Nood WFD Team DG.
Type the subject in footer (View|Header and Footer) 1 28/01/2016 EU CLRTAP Emissions Inventory Compilation 2015 TFEIP Meeting, 11/12 May 2015, Milano ETC/ACM.
Clean Air for Europe TFIAM Conference Planning of the CAFE programme AMIENS May 2004 André Zuber & Matti Vainio Environment DG - European Commission TFIAM.
ESS Slide 1 Quality assessment of MEHM in SILC Eurostat Unit F5 “Health and Food Safety Statistics” 4 th meeting of the Task Force on Health Expectancies.
Water.europa.eu Update on legal issues Strategic Coordination Group Update as of Marco Gasparinetti, DG ENV.D.1, European Commission.
Women in company boards. An issue for ETUC? Cinzia Sechi, Policy Advisor, ETUC ETUC Participation WG 16 February 2012, Brussels.
List of priority spatial data sets
Clean Air for Europe Revision of the NECD
ERIC Experiences and New Developments
CAFE SG 23 November Brussels
NEC National Programmes
List of priority spatial data sets
EU Water Framework Directive
Time table for revision of the NECD
WFD update September 2009 Andrea NÁM
State of legal transposition (1)
NECD Implementing provisions now and in the future
Marine Strategy Framework Directive: Transposition and Implementation
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
State of play Article 5 reports
1.
on Priority Substances Strategic Coordination Group
MSFD Article 12 assessment Follow-up on geographic issues
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
IPPC Review Stakeholder Hearing
Update on legal issues Strategic Coordination Group
2a. Status of WFD reporting
Reporting – Art 17 of HD and Art 12 of BD
2b. Status of WFD reporting
Programme adoptions Cohesion Policy:
Contribution for the updating of the WFD reporting sheets and schemas
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Marine Strategy Framework Directive: Status of reporting Art. 8/9/10
Marine Strategy Framework Directive: Transposition and Implementation
MSFD Article 11 reporting Monitoring programmes
Strategic Steering Group
Natura 2000 – SCI Union Lists
The Thematic strategy and the possible measures of action
Update on legal issues Strategic Coordination Group
Item 4.1 – Overview of 2014 UOE data collection
DG Environment, Unit D.2 Marine Environment and Water Industry
WFD River Basin Management Plans :
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
2015 Update of Union Lists of Sites of Community Interest
CAFE Steering Group 28 February 2007.
Update on legal issues Strategic Co-ordination Group 7-8 May 2009
Legal and implementation issues update
State of Play RBMPs and WISE reporting (9/07/10)
FISIM State of play Agenda Item 3.
Update on implementation WG F 27 April 2010 Maria Brättemark
Update on legal issues Strategic Coordination Group 23 February 2010
Update on legal issues Strategic Coordination Group
Update on status of reporting and validation process
The 1997 UN Watercourses Convention
Overview of the implementation of the SEA directive
Transposition and implementation of WFD
CAFE Steering Group 11 May 2005
European waters - assessment of status and pressures 2018
DG Environment, Unit C.2 Marine Environment and Water Industry
2. WFD implementation: state of play
Presentation transcript:

&file 22/02/2019 National Programmes under the National Emission Ceilings Directive (NECD) André Zuber, European Commission, DG Environment Working group on NEC Policy Instrument 18 – 19 December 2006

What the NEC directive says &file 22/02/2019 What the NEC directive says MS report due by 31 Dec 2006: Emission inventories Final for 2004 and provisional for 2005 Updates of time series Projections Information on national programmes Updating the programmes of 2002 (EU10 for 2004) Adopted and envisaged policies and measures Meeting the objectives of the NEC by 2010 Changes in geographical distribution Commission: ENV-NECD@ec.europa.eu EEA: uploading on the CDR EIONET

Link NECD – CLRTAP reporting &file 22/02/2019 Link NECD – CLRTAP reporting Reporting of MS the basis for EC report to CLRTAP: Emission reporting 15 February 2007 NEC pollutants - 2005 EI and updates Other pollutants under the protocols -2005 EI and updates Projections –activities and pollutants Five year grid data 1 March 2007 Large Point Sources 1 March 2007 Informative Inventory Reports – as soon as possible

Progress report from MS on national programmes (revised after NECPI) &file 22/02/2019 Progress report from MS on national programmes (revised after NECPI) Positive reponse in NECPI AT (NOx) EE (SO2) DE (NOx) LV LU MT (VOC) PO SV ES (NOx, VOC) No response yet CY GR PL Positive reponse BE (NOx, NH3) CZ DK (NOx, NH3) FI (up loaded) FR (SO2, NOx) HU IE (NOx, VOC) IT (NOx) LT (up loaded) NL (SO2, NOx, NH3) SI (NOx) SE (NOx) UK (NOx) Substance identified above ceiling according to IIASA baseline report Sept 2006 in brackets

Evaluation of national programmes &file 22/02/2019 Evaluation of national programmes Service contract to provide support to the Commission Revision of the NEC Directive on the reporting obligations on national programmes; Analysis of the completeness of the MS preparations, implementation and reporting of national programmes Preparation of a review report to the European Parliament and the Council (for 2008) Analysing the extent to which the environmental interim objectives for 2010 and long-term objectives for 2020 laid down in the NEC directive are likely to be met Reference group with EEA and other COM services

Evaluation of national programmes &file 22/02/2019 Evaluation of national programmes Tasks 1: In depth analysis of NEC national programs (10 MS) Consistency of the MS national programmes on Air quality, GHG and ETS, under other directives (LCP, VOC) - NEC gases and PM Comparison with the IIASA NEC projections Use of "Recommendations on developing and reporting national programmes under the National Emission Ceilings Directive" 2: Analysis of EU 25 - compliance to the obligations under NEC directive Development of criteria for fulfilling the requirements of MS reporting under the NEC directive. Collection of supplementary data from the MS to verify that the programmes developed cover the aspects required by the directive. Comparison with the national projections and the information from the RAINS model. Summary estimates of the fulfilment of ceilings for the European Community. Provide recommendations for further action.

Evaluation of national programmes &file 22/02/2019 Evaluation of national programmes Tasks 3: Draft review report (covering aspects of national programmes) “measures to ensure compliance with the ceilings” (article 10, paragraph 5 (c) of the NEC directive) 4: Task 4: Stakeholder consultation “June 2007”

Evaluation of national programmes &file 22/02/2019 Evaluation of national programmes The relation with NEC PI and MS Interim report (draft 15 April 2007, final Dec 2007?) Information on screening and in-depth analysis Commission/contractor will come back with further quiries on the National programmes to check conformity with NEC Proposals for changes in legislation and guidance Usefulness of ”Recommendations ..plans” Stakeholder consultation ”June 2007” Technical report (draft 15 September 2007, final Dec 2007?) NEC review report conc national programmes