Welcome to the Stanford Synchrotron Radiation Laboratory (SSRL) at the Stanford Linear Accelerator Center (SLAC) * 2575 Sand Hill Road, Menlo Park, CA.

Slides:



Advertisements
Similar presentations
2 November 2009 Geant4 Tutorial Introduction J. Perl 1 SLAC Geant4 Tutorial 09 SLAC - Kavli Auditorium 2-6 November 2009 A five day hands-on course based.
Advertisements

Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
Gate 1 – Nelson Blvd to end, at Wetzel Ave. Right on Wetzel, past fire station, left into parking lot at top of hill. Gate 4 – Barkeley Ave all the way.
Warm Springs Community Park 1 Administrative Building 3 School of Engineering (EAST) 2 Library and Student Service Center (WEST) 1. Administrative Building.
1 SLAC National Accelerator Laboratory Amber Boehnlein October 18, 2011.
Great Sand Dunes National Park Self-Guided Interpretive Trail.
Workshop Introduction Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
PRDs, ESDs, ICDs Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Component Specification Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
NOAA NSOF Logistics Maps and Directions.
To the NWS Training Center GOES-R/JPSS User Readiness Meeting.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Lecture 15  Radiation Damping Radiation Damping USPAS,
Honda Manufacturing of Alabama Welcome Honda Manufacturing of Alabama Welcome.
P. Skopintsev1,2,3, A. Singer1, J. Bach4, L. Müller1, B. Beyersdorff2, S. Schleitzer1, O. Gorobtsov1, A. Shabalin1, R.P. Kurta1, D. Dzhigaev1,5, O.M. Yefanov1,
Frontiers of THz Science ZX Shen SLAC Chief Scientist 1.
HEPiX-HEPNT Fermi National Accelerator Lab October 23-25, 2002.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
Site Plan Site Plan Overall Plan Old School Bldg. Classroom Bldg.
EMERGENCY FACILITIES AND EQUIPMENT. Facility: Any equipment, structure, system, process, or activity that fulfills a specific purpose Site: The area over.
Introductory Information. 8 July Geant4 Neutron mini-Workshop Welcome to Earthquake Country Be aware of exits in your building Speaker will indicate.
SLAC All Hands Briefing: FY2008 Budget Persis S. Drell SLAC Director 1/7/08.
Community Development Department Town Center Multi-Family Master Site Plan Application #2227 Town Center Multi-Family Master Site Plan Application #2227.
19-23 September th Geant4 Collaboration Meeting 1 SLAC September 2011 Welcome!
MESH Crystal Injectors
The Electromagnetic Spectrum High Harmonic Generation
Defense Acquisition University PROTOCOL AND OPERATIONS OFFICE
Madhu Karra1, Jason Koglin1,2
Sentiment Analysis and Data visualization Techniques of Experiments
Structure and Function: Ubiquitination of NEMO and Optineurin
Matter in Extreme Conditions at LCLS:
Defense Acquisition University
Kevin Shimbo1, Matt Hayes+
X-Ray Shielding Introduction Application Research Conclusions
MAKING WAY FOR LCLS II HERRIOTT CELL IGNIS THE NEED FOR LCLS-II
Student Drop-off / No parking area Bailey Boswell Road – 1ST Floor
Site Map for the RapiData Tutorials April 2017
Effects of Wrapping Vacuum
Goding Elementary Existing Conditions Presentation February 13, 2013.
Values to Normalize Data
Designing a molecular probe for detection
G6PD Complex Structural Study Crystallization Setup
Determining a Detector’s Saturation Threshold
Crystallography Labeling Using Machine Learning
Creation and development of a PRP database
LCLS Injector Commissioning Workshop (ICW)
Student Drop-off / No parking area Bailey Boswell Road – 1ST Floor
National Defense University Fort Lesley J McNair, Washington D.C.
Margaret Koulikova1, William Colocho+
Emergency & Environmental Information
Analytical Solutions for Heat Distribution in KB Mirror Systems
Repeatability Test of Attocube Piezo Stages
Analytical Solutions for Temperature
GLAST Large Area Telescope:
CSR Microbunching in the Zeuthen-Workshop Benchmark Chicane
CF Organization & Schedule
Welcome to WAO 2012.
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
Redesigning of The SED Calendars
Title of Your Poster Introduction Research Conclusions Acknowledgments
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
Air Quality Research at the University of Texas
HISD Educational Learning Center
Von Braun II Facility, RSA Bldg 5222 Gate 9 to VBII Facility Bldg 5222
PH3520 / Particle Physics Autumn term 2010 – week 4
Stanford Linear Accelerator
WELCOME TO EMPLOYMENT WITH BELL ORCHID HOTEL IN SANTA BARBARA, CA
Emergency Information
DOE Accelerator Safety Workshop 2018
Accelerator Safety Workshop SLAC
Presentation transcript:

Welcome to the Stanford Synchrotron Radiation Laboratory (SSRL) at the Stanford Linear Accelerator Center (SLAC) * 2575 Sand Hill Road, Menlo Park, CA 94025 Operated by Stanford University for the U.S. Department of Energy 280 Sand Hill Road Main Entrance Security Gate Parking SLAC Guest House Parking Res.Off. Bldg. 48 (Redwood Conf. Rm) Kavli Bldg. 51 Panofsky Auditorium Visitor Ctr. Cafeteria Parking Parking Admin & Eng Bldg. 41 (Medical) Parking Parking Sector 17 Security Gate SSRL URA Bldg. 120/131 Central Lab Bldg. 40/84 (Orange Rm, Library) Parking SSRL LOS Bldg. 137/138 SPEAR Sector 30 Security Gate SCS Bldg. 50 * All users and visitors must show photo ID to enter this facility.