Upscaling Basic Sanitation for the Urban Poor (UBSUP) 2/22/2019
In this session you learn: BoQ In this session you learn: General structure of the BoQ Bills Construction elements/steps How to fill the BoQ How to update the generic BoQ? Fixed quantities Variable quantities 2/22/2019
Bills BILL No DESCRIPTION Bill No 1 RECEIVING BAY AND BALANCING TANKS Bill No 1 RECEIVING BAY AND BALANCING TANKS Bill No 2 SETTLER FOR PHASE SEPARATION Bill No 3 ANAEROBIC BAFFLED REACTOR Bill No 4 VERTICAL FLOW CONSTRUCTED WETLAND Bill No 5 SLUDGE DRYING REED BED Bill No 6 COMPOSTING FACILITY Bill No 7 OPERATORS STORE Bill No 8 AUXILIARY WORKS 2/22/2019
Construction steps 2/22/2019 ITEM ITEM DESCRIPTION 1.00 1.00 DEMOLITION & SITE CLEARANCE 2.00 EARTHWORKS 3.00 SUBSTRUCTURE: CONCRETE / REINFORCEMENT/ FOMWORKS 4.00 WALLING 5.00 SUPERSTRUCTURE: CONCRETE / REINFORCEMENT/ FOMWORKS 6.00 PIPEWORK - PIPES and FITTINGS 7.00 METAL WORKS 8.00 FILTER MEDIA & PLANTS 9.00 ROOFING 10.00 PAINTING AND DECORATION 11.00 ELECTRICAL CONNEXION 12.00 WATER SUPPLY 13.00 CHAMBERS 14.00 FENCING & GATE 15.00 ROADS 16.00 TESTING OF SYSTEM 17.00 SITE DRAINAGE WORKS 18.00 PROTECTIVE WORKS 19.00 SIGN POST 2/22/2019
How to fill a BoQ ? 2/22/2019
fixed vs variable quantities 2/22/2019