Upscaling Basic Sanitation for the Urban Poor (UBSUP)

Slides:



Advertisements
Similar presentations
Session 12 STEPS 3 AND 4. Stage 2 Detail Design Submission should include an updated cost estimate and the following: (Not every item listed will apply.
Advertisements

The Vigyan Vijay Foundation Appropriate technology for sustainable development Case Study of Dewats Plant at a Home Components of wastewater treatment,
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
Facilities Management and Design Chapter 11 Building Structure, Finishes and Site.
Beds and Benches Mindy Moore HORT Beds for Cut Flowers Raised and Ground Beds Raised and Ground Beds The beds can be level with the ground or they.
Processes of Sludge Treatment
Construction Technology Bachelor of Science (hons) in Quantity Surveying ITS April 2008.
Waste Water Disposal Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 2aWaste Water Disposal and Storm Drainage Chapter 4, 7; Appendix A.
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
1 Topic. II.9. Sewerage Facilities. Manholes and Street Inlets Kinds of Sewerage Facilities §Facilities for the sewer network inspection, maintenance and.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
1 I. Water Supply Networks and Facilities Topic I.4. River Water Intakes: Kinds and Structures Water Intake Kinds General classification: I. According.
1 III. Water Treatment Technologies Topic III. 7. Water Stability. General Arrangement of Water Treatment Plant Water Stability §Stability index (Index.
2008 Farm Bill Nevada Payment Rates Nye and Esmeralda Counties (for practices commonly planned and applied)
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Quality of Works 1.
SITUATION OF HEALTHCARE WASTE MANAGEMENT IN NEPAL AND AN EFFORT FOR IMPROVEMENT AT RESOURCE POOR SETTINGS JAYENDRA BHATTA PROGRAMME OFFICER/CIVIL ENGINEER.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
SETA Water treatment plant maintenance
© T Madas. What do we mean when we say two quantities are inversely proportional ? It means that if: one of them doubles, the other one halves. one of.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
AQUACULTURE FACILITIES [objectives]
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
City of Woburn – City Council Committee on Water Update on Water and Sewer System Improvements Projects City Council ChambersJune 1, :00 pm City.
Conventional Sewage Treatment Plants:
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Agitation & Mixing of fluids
Planning the Project Unit 1 – Lesson 12.
THE DTF CONCEPT.
Partially separate system
Temporary Works – P8 Project Practice.
IT-4337/SMB – Bidders Conference
Environmental Assessment
Water Services Trust Fund
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Costing and Project Evaluation
Progress Charts.
Wastewater Treatment Dr.Gulve R.M..
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Pre-Contract Cost Control
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Decentralised Treatment Facility (DTF)
A low-pressure dosing system requires a pump tank and a network of small-diameter pipes (1 to 2 inches) placed in trenches. The pump tank stores the effluent,
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Methods for Wastewater and Sludge Treatment
ELCITA UPDATE March 2018.
ELCITA UPDATE April 2018.
WASH Objective 1: Affected people have safe and equitable access to a sufficient quantity of water for domestic needs, per sector's standards Indicator.
Field House, Car Colston
The Hollies, Ravenshead
STRUCTURAL TIMBER FRAMING
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
OVERVIEW & PROGRESS Presentation before the Sub Collector cum Sub Divisional Magistrate, Cuddalore.
Woodlane Timber, Hucknall
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Construction of toilets and septic tanks
DTF TREATMENT PROCESSES
TECHNICAL SPECIFICATION AND REQUIREMENTS
Site Design and Operational Consideration session three
How much is your product worth?
Field House, Car Colston
WELCOME TO METRO CITY.
Construction of toilets and septic tanks
How much is your product worth?
Life Cycle Costing.
Presentation transcript:

Upscaling Basic Sanitation for the Urban Poor (UBSUP) 2/22/2019

In this session you learn: BoQ In this session you learn: General structure of the BoQ Bills Construction elements/steps How to fill the BoQ How to update the generic BoQ? Fixed quantities Variable quantities 2/22/2019

Bills BILL No DESCRIPTION Bill No 1 RECEIVING BAY AND BALANCING TANKS   Bill No 1 RECEIVING BAY AND BALANCING TANKS Bill No 2 SETTLER FOR PHASE SEPARATION Bill No 3 ANAEROBIC BAFFLED REACTOR Bill No 4 VERTICAL FLOW CONSTRUCTED WETLAND Bill No 5 SLUDGE DRYING REED BED Bill No 6 COMPOSTING FACILITY Bill No 7 OPERATORS STORE Bill No 8 AUXILIARY WORKS 2/22/2019

Construction steps 2/22/2019 ITEM ITEM DESCRIPTION 1.00   1.00 DEMOLITION & SITE CLEARANCE 2.00 EARTHWORKS 3.00 SUBSTRUCTURE: CONCRETE / REINFORCEMENT/ FOMWORKS 4.00 WALLING 5.00 SUPERSTRUCTURE: CONCRETE / REINFORCEMENT/ FOMWORKS 6.00 PIPEWORK - PIPES and FITTINGS 7.00 METAL WORKS 8.00 FILTER MEDIA & PLANTS 9.00 ROOFING   10.00 PAINTING AND DECORATION 11.00 ELECTRICAL CONNEXION 12.00 WATER SUPPLY 13.00 CHAMBERS 14.00 FENCING & GATE 15.00 ROADS 16.00 TESTING OF SYSTEM 17.00 SITE DRAINAGE WORKS 18.00 PROTECTIVE WORKS 19.00 SIGN POST 2/22/2019

How to fill a BoQ ? 2/22/2019

fixed vs variable quantities 2/22/2019